- 2075 Baisakh · 10 marks
Primary/secondary energy and pondage volume
Short answer
Primary energy is 1375 GWh/yr, secondary 11,217 GWh/yr. Power per unit flow: 1569.6 Q kW. For firm capacity increased by 150% (to 250 m³/s), pondage required is 1.025×10^9 m³.
Determine the primary and secondary energy if the hydrograph as shown below is given net head = 200 m and efficiency = 80%. What is the volume of the pondage required if the firm capacity is increased by 150%.
| Month | Jan | Feb | Mar | Apr | May | Jun | July | Aug | Sept | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m³/s) | 100 | 120 | 140 | 300 | 320 | 1800 | 2000 | 2510 | 2000 | 900 | 500 | 300 |
Primary energy is produced by the minimum flow that is available all year; secondary energy is produced by the flow above this minimum. No design discharge is given, so the plant is assumed to use all the river flow (secondary energy is then the maximum possible). Each month is taken as 730 h ( s).
Power per unit discharge
Primary energy
Minimum flow = 100 m³/s (January).
Total and secondary energy
| Month | Q (m³/s) | Power (MW) | Energy (GWh) |
|---|---|---|---|
| Jan | 100 | 156.96 | 114.58 |
| Feb | 120 | 188.35 | 137.50 |
| Mar | 140 | 219.74 | 160.41 |
| Apr | 300 | 470.88 | 343.74 |
| May | 320 | 502.27 | 366.66 |
| Jun | 1800 | 2825.28 | 2062.45 |
| Jul | 2000 | 3139.20 | 2291.62 |
| Aug | 2510 | 3939.70 | 2875.98 |
| Sep | 2000 | 3139.20 | 2291.62 |
| Oct | 900 | 1412.64 | 1031.23 |
| Nov | 500 | 784.80 | 572.90 |
| Dec | 300 | 470.88 | 343.74 |
| Total | 10,990 | 12,592.43 |
Pondage for firm capacity increased by 150%
"Increased by 150%" is read as new firm capacity = times the original.
Months with flow below 250 m³/s must be supplied from storage:
| Month | Q | Deficit (250 − Q) |
|---|---|---|
| Jan | 100 | 150 |
| Feb | 120 | 130 |
| Mar | 140 | 110 |
| Total | 390 m³/s-month |
This storage is easily refilled in the monsoon months, when flows are far above 250 m³/s.
Answer: Primary energy ≈ 1375.0 GWh/yr; secondary energy ≈ 11,217.5 GWh/yr; storage (pondage) required ≈ 1.025 × 10⁹ m³ (1025 million m³).
(If "increased by 150%" is taken as 1.5 times, i.e. firm flow 150 m³/s, the deficits are 50 + 30 + 10 = 90 m³/s-month and the storage is m³.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Primary and secondary energy (102 m head) · Hydro Power, chapter 3
- Primary and secondary energy with 10% environmental flow · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3