- 2071 Chaitra · 3+2+3 marks
Full regulation: reservoir, capacity, annual energy
Short answer
Reservoir capacity ≈ 437.6 Mm³, installed capacity ≈ 84.9 MW, annual energy ≈ 744 GWh.
A hydropower project is planned to develop in a Nepalese river having net head of 150 m, turbine efficiency of 90% and generator efficiency of 95% with the monthly hydrograph as shown below:
| Months | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/sec) | 100 | 80 | 60 | 50 | 40 | 30 | 40 | 50 | 70 | 110 | 150 | 120 |
As an environmental flow, a minimum flow of 10% of each month is mandatory. If the storage project is designed with full regulation of the annual hydrograph, find out the capacity of the reservoir, installed capacity of the power plant, and annual energy generation.
Data
m, . Environmental flow = 10% of each month's flow, so the flow available for power is . One month s.
Sum of flows m³/s, mean m³/s. Mean available flow m³/s. With full regulation the design discharge is this mean flow, so the plant runs at a constant m³/s.
Reservoir capacity (mass-curve method)
The reservoir is full at the start of December, when the inflow drops below the draft. Cumulative of (0.9Q − 67.5):
| Month | Q (m³/s) | 0.9Q | 0.9Q − mean | Cumulative (m³/s-month) |
|---|---|---|---|---|
| Dec | 60 | 54.0 | -13.5 | -13.5 |
| Jan | 50 | 45.0 | -22.5 | -36.0 |
| Feb | 40 | 36.0 | -31.5 | -67.5 |
| Mar | 30 | 27.0 | -40.5 | -108.0 |
| Apr | 40 | 36.0 | -31.5 | -139.5 |
| May | 50 | 45.0 | -22.5 | -162.0 |
| Jun | 70 | 63.0 | -4.5 | -166.5 |
| Jul | 110 | 99.0 | +31.5 | -135.0 |
| Aug | 150 | 135.0 | +67.5 | -67.5 |
| Sep | 120 | 108.0 | +40.5 | -27.0 |
| Oct | 100 | 90.0 | +22.5 | -4.5 |
| Nov | 80 | 72.0 | +4.5 | +0.0 |
The cumulative reaches its lowest value of m³/s-months in June; from July the surplus refills the reservoir.
Installed capacity
Annual energy
(The head is taken as constant at 150 m; in practice the head varies with the reservoir level.)
Answer: reservoir capacity ≈ 437.6 Mm³; installed capacity ≈ 84.9 MW; annual energy ≈ 744 GWh.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- RoR at 40% exceedence; storage regulation · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- Minimum reservoir capacity and wasted water · Hydropower Engineering, chapter 3
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- Micro hydro net head, power and energy · Energy Resources, chapter 5
- Design: 95 m head plant at Q65% · Power Plant Design, chapter 4 · asked 12×
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×