Installed capacity, energy and daily peaking reservoir (2072)

Short answer

Installed capacity is 89.8 MW. Total annual energy is 452.9 GWh, with primary energy 136.5 GWh and secondary 316.4 GWh, giving a plant factor of 0.58. For 4-hour daily peaking, the required pondage volume is about 215,136 m³.

A hydropower plant is to be planned in a Nepalese river, where the mean monthly flows for a typical year are as follows:

MonthJanFebMarAprMayJunJulAugSepOctNovDec
Q (m³/s)4.43.93.44.25.616.578.1108.952.822.09.96.4

Other data pertaining to the plant: design discharge = 18 m³/s; full supply level = 2250 masl; turbine center line = 1650 masl; diameter of 4.0 km long tunnel = 3.0 m, f = 0.014; diameter of 1.0 km long penstock = 2.2 m, f = 0.012; hydraulic efficiency = 95%; turbine efficiency = 93%; generator efficiency; transformer efficiency = 99%. Considering only frictional loss, a) Compute the installed capacity, primary and secondary energy to be produced from the power plant assuming that 10% of the minimum flow is to be released downstream. What is the plant factor? b) The developer is interested in developing a daily peaking reservoir for 4 hours. What will be the capacity of the reservoir to satisfy the daily peaking requirement?

The generator efficiency is missing in the question; it is assumed to be 99%, the same as the transformer (all other data as given).

Data and approach

Gross head =2250−1650=600= 2250-1650 = 600 m. Only friction loss is considered. Overall efficiency η=0.95×0.93×0.99×0.99=0.8659\eta = 0.95\times0.93\times0.99\times0.99 = 0.8659 (hydraulic × turbine × generator × transformer). Energy is computed month by month (730 h per month), with the friction loss recalculated for the flow used.

Head loss at design flow Qd=18Q_d = 18 m³/s (Darcy-Weisbach)

Tunnel: A=π4(3)2=7.069A=\frac{\pi}{4}(3)^2 = 7.069 m², V=2.546V = 2.546 m/s

hf,t=fLDV22g=0.014×40003×2.54622×9.81=6.17 mh_{f,t} = f\frac{L}{D}\frac{V^2}{2g} = 0.014\times\frac{4000}{3}\times\frac{2.546^2}{2\times9.81} = 6.17\ \text{m}

Penstock: A=π4(2.2)2=3.801A=\frac{\pi}{4}(2.2)^2 = 3.801 m², V=4.735V = 4.735 m/s

hf,p=0.012×10002.2×4.73522×9.81=6.23 mh_{f,p} = 0.012\times\frac{1000}{2.2}\times\frac{4.735^2}{2\times9.81} = 6.23\ \text{m}

Net head at QdQ_d: Hn=600−6.17−6.23=587.60H_n = 600-6.17-6.23 = 587.60 m. (Loss varies as Q2Q^2 for smaller flows.)

(i) Installed capacity, energy and plant factor

Environmental release =10%×=10\%\times minimum monthly flow =0.1×3.4=0.34=0.1\times3.4=0.34 m³/s, so the flow available for power is Q−0.34Q-0.34.

P=9.81 η Hn Qd=9.81×0.8659×587.60×18=89,846 kW=89.85 MWP = 9.81\,\eta\,H_n\,Q_d = 9.81\times0.8659\times587.60\times18 = 89,846\ \text{kW} = 89.85\ \text{MW}
MonthQ (m³/s)Q − 0.1QminQ usedNet head (m)Power (MW)Energy (GWh)
Jan4.44.064.06599.420.6715.09
Feb3.93.563.56599.518.1313.23
Mar3.43.063.06599.615.5911.38
Apr4.23.863.86599.419.6514.35
May5.65.265.26598.926.7619.54
Jun16.516.1616.16590.080.9959.12
Jul78.177.7618.00587.689.8565.59
Aug108.9108.5618.00587.689.8565.59
Sep52.852.4618.00587.689.8565.59
Oct2221.6618.00587.689.8565.59
Nov9.99.569.56596.548.4435.36
Dec6.46.066.06598.630.8122.49
  • Total annual energy =452.92= 452.92 GWh
  • Primary (firm) energy, from the minimum available flow 3.063.06 m³/s (available in every month): 136.54136.54 GWh
  • Secondary energy =452.92−136.54=316.38=452.92-136.54 = 316.38 GWh
  • Plant factor =452.92×10689.85×103×8760=0.575=\dfrac{452.92\times10^6}{89.85\times10^3\times8760} = 0.575 (57.5%)

(ii) Reservoir for 4-hour daily peaking

In the driest month the available inflow is Qin=3.06Q_{in} = 3.06 m³/s. The plant is to run for 4 hours a day at the design flow of 18 m³/s and store water in the other 20 hours. The daily inflow is 264,384 m³ and the peak use is 18×4×3600=259,20018\times4\times3600 = 259,200 m³, which is slightly smaller, so 4-hour peaking at 18 m³/s is possible.

During the 4 peak hours the draw-down from the reservoir is

V=(Qd−Qin)×t=(18−3.06)×4×3600=215,136 m3≈2.15×105 m3V = (Q_d - Q_{in})\times t = (18-3.06)\times4\times3600 = 215,136\ \text{m}^3 \approx 2.15\times10^5\ \text{m}^3

The same volume must be stored in the 20 off-peak hours (3.06×20×3600=220,3203.06\times20\times3600 = 220,320 m³ available), so it fills in time.

Answer: P = 89.8 MW; total energy = 452.9 GWh; primary energy = 136.5 GWh; secondary energy = 316.4 GWh; plant factor = 0.58; pondage volume ≈ 215,136 m³ (≈ 2.15 × 10⁵ m³).