- Asked 2/21
- 2079 Baishakh · 2+2+2+2+4 marks
Installed capacity, energy and daily peaking reservoir (2079)
Short answer
Installed capacity is 89.8 MW. Total annual energy is 447.7 GWh, with primary energy 136.5 GWh and secondary 311.2 GWh, giving a plant factor of 0.57. For 4-hour daily peaking, the required pondage volume is about 215,136 m³.
A hydropower plant is planned to be designed in a Nepalese river, where mean monthly flows for a typical year are as follows.
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 4.4 | 3.9 | 3.4 | 4.2 | 4.2 | 16.5 | 78.1 | 108.9 | 52.8 | 22.0 | 9.9 | 6.4 |
Other data: design discharge = 18 m³/s; full supply level = 2250 masl; turbine centerline = 1650 masl; diameter of 4 km long tunnel = 3 m, f = 0.014; diameter of 1 km long penstock = 2.2 m, f = 0.012; hydraulic efficiency = 95%, turbine efficiency = 93%, generator efficiency = 99%, transformer efficiency = 99%. Considering only the frictional loss, (i) Compute the installed capacity, primary and secondary energy to be produced from the power plant assuming that 10% of the minimum monthly flow is to be released downstream. What is the plant factor? (ii) The developer is interested in developing a daily peaking reservoir for 4 hours. What will be the capacity of the reservoir to satisfy the daily peaking requirement?
Data and approach
Gross head m. Only friction loss is considered. Overall efficiency (hydraulic × turbine × generator × transformer). Energy is computed month by month (730 h per month), with the friction loss recalculated for the flow used.
Head loss at design flow m³/s (Darcy-Weisbach)
Tunnel: m², m/s
Penstock: m², m/s
Net head at : m. (Loss varies as for smaller flows.)
(i) Installed capacity, energy and plant factor
Environmental release minimum monthly flow m³/s, so the flow available for power is .
| Month | Q (m³/s) | Q − 0.1Qmin | Q used | Net head (m) | Power (MW) | Energy (GWh) |
|---|---|---|---|---|---|---|
| Jan | 4.4 | 4.06 | 4.06 | 599.4 | 20.67 | 15.09 |
| Feb | 3.9 | 3.56 | 3.56 | 599.5 | 18.13 | 13.23 |
| Mar | 3.4 | 3.06 | 3.06 | 599.6 | 15.59 | 11.38 |
| Apr | 4.2 | 3.86 | 3.86 | 599.4 | 19.65 | 14.35 |
| May | 4.2 | 3.86 | 3.86 | 599.4 | 19.65 | 14.35 |
| Jun | 16.5 | 16.16 | 16.16 | 590.0 | 80.99 | 59.12 |
| Jul | 78.1 | 77.76 | 18.00 | 587.6 | 89.85 | 65.59 |
| Aug | 108.9 | 108.56 | 18.00 | 587.6 | 89.85 | 65.59 |
| Sep | 52.8 | 52.46 | 18.00 | 587.6 | 89.85 | 65.59 |
| Oct | 22 | 21.66 | 18.00 | 587.6 | 89.85 | 65.59 |
| Nov | 9.9 | 9.56 | 9.56 | 596.5 | 48.44 | 35.36 |
| Dec | 6.4 | 6.06 | 6.06 | 598.6 | 30.81 | 22.49 |
- Total annual energy GWh
- Primary (firm) energy, from the minimum available flow m³/s (available in every month): GWh
- Secondary energy GWh
- Plant factor (56.9%)
(ii) Reservoir for 4-hour daily peaking
In the driest month the available inflow is m³/s. The plant is to run for 4 hours a day at the design flow of 18 m³/s and store water in the other 20 hours. The daily inflow is 264,384 m³ and the peak use is m³, which is slightly smaller, so 4-hour peaking at 18 m³/s is possible.
During the 4 peak hours the draw-down from the reservoir is
The same volume must be stored in the 20 off-peak hours ( m³ available), so it fills in time.
Answer: P = 89.8 MW; total energy = 447.7 GWh; primary energy = 136.5 GWh; secondary energy = 311.2 GWh; plant factor = 0.57; pondage volume ≈ 215,136 m³ (≈ 2.15 × 10⁵ m³).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- Peaking RoR: max power and wet/dry energy ratio · Hydropower Engineering, chapter 3
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Best installed capacity at 12% interest · Hydro Power, chapter 3