- 2082 Bhadra · 10 marks
RoR best installed capacity (NRs, 45 years)
Short answer
The best capacity is found by maximizing net annual benefit (energy revenue at NRs 10/kWh minus annualized cost using CRF=0.10139). Optimum design flow is 800 m³/s. Results: installed capacity = 1,084.8 MW; firm energy = 950.3 GWh; secondary energy = 3,157.7 GWh; total energy = 4,108.0 GWh; plant factor = 0.43.
The mean monthly flow of a river at the headworks site of a ROR hydropower project is as follows:
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 90 | 85 | 80 | 95 | 200 | 500 | 1,000 | 1,200 | 800 | 450 | 150 | 100 |
The other data are as follows: net available head = 150 m; efficiency of turbine = 95%; efficiency of generator = 97%; fixed cost = NRs. 10,00,00,00,000; variable cost (present worth value) = NRs. 1,50,000/kW; energy price = NRs. 10 per unit; interest rate = 10%; economic life of the project = 45 years. Estimate the best installed capacity, firm energy, secondary energy, total energy, and power factor of the project.
The optimum capacity of a RoR plant is where the marginal benefit of the last unit of capacity equals its marginal cost (equivalently, where the net benefit is maximum). The fixed cost does not change with capacity, so it does not affect the optimum.
Data and constants
- Fixed cost = NRs 10,00,00,00,000 (= NRs 10,000 million); variable cost = NRs 1,50,000/kW (present worth); price = NRs 10/kWh
- Net head m; turbine 95% and generator 97%, so overall efficiency ; no O&M cost is given
- "Power factor" in the question is read as the plant factor.
- Capital recovery factor for , years
- Energy per month: (8760/12 h per month)
- Annual cost ; annual benefit = energy × price
Flow available for power
Available flows (m³/s) in descending order: 1200, 1000, 800, 500, 450, 200, 150, 100, 95, 90, 85, 80.
Marginal check
Each extra 1 kW of capacity above a flow level is used only in the months in which the flow is greater than that level. A kW used for months produces MWh per year. The benefit per kW for each month it is used = 730 kWh × NRs 10 = NRs 7,300, and the annual cost of 1 kW = 1,50,000 × 0.10139 = NRs 15,208. So a kW must be used for at least 2.08 months, i.e. at least 3 months in a year, to pay for itself. The 3rd highest flow is 800 m³/s, so capacity beyond 800 m³/s (used for only 2 months) is not justified.
Trial design discharges
| (m³/s) | P (MW) | Energy (GWh) | Benefit (NRs M) | Cost (NRs M) | Net (NRs M) |
|---|---|---|---|---|---|
| 80 | 108.48 | 950.28 | 9,502.8 | 2,663.7 | 6,839.0 |
| 85 | 115.26 | 1,004.72 | 10,047.2 | 2,766.8 | 7,280.3 |
| 90 | 122.04 | 1,054.21 | 10,542.1 | 2,870.0 | 7,672.2 |
| 95 | 128.82 | 1,098.76 | 10,987.6 | 2,973.1 | 8,014.5 |
| 100 | 135.60 | 1,138.35 | 11,383.5 | 3,076.2 | 8,307.3 |
| 150 | 203.40 | 1,484.81 | 14,848.1 | 4,107.3 | 10,740.7 |
| 200 | 271.20 | 1,781.77 | 17,817.7 | 5,138.5 | 12,679.2 |
| 450 | 610.19 | 3,019.11 | 30,191.1 | 10,294.1 | 19,896.9 |
| 500 | 677.99 | 3,217.08 | 32,170.8 | 11,325.3 | 20,845.5 |
| 800 | 1,084.79 | 4,107.96 | 41,079.6 | 17,512.1 | 23,567.5 |
| 1000 | 1,355.99 | 4,503.91 | 45,039.1 | 21,636.6 | 23,402.5 |
| 1200 | 1,627.18 | 4,701.89 | 47,018.9 | 25,761.2 | 21,257.7 |
The net benefit is greatest at m³/s.
Results
- Installed capacity: MW
- Firm (primary) energy, from the minimum flow of 80 m³/s all year: GWh
- Total energy: GWh
- Secondary energy GWh
- Plant factor (43.2%)
Answer: best installed capacity = 1,084.8 MW (design flow 800 m³/s); firm energy = 950.3 GWh; secondary energy = 3,157.7 GWh; total energy = 4,108.0 GWh; plant factor = 0.43.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 1200 million) · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- RoR at 40% exceedence; storage regulation · Hydropower Engineering, chapter 3
- Best installed capacity at 10% interest · Hydro Power, chapter 3
- Best installed capacity at 12% interest · Hydro Power, chapter 3
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Firm and secondary energy from average monthly flows · Hydro Power, chapter 3