- Asked 12/21
- 2079 Chaitra · 1+2+3+2+4+4 marks
Design: 95 m head plant at Q65%
Short answer
Electrical output 2.73 MW; installed 2.8 MW (2×1.4 MW Francis, 1000 rpm). Single bus at 11 kV and 66 kV. Generator breaker: 11 kV, 630 A, 40 kA; HV breaker: 66 kV, 630 A, 20 kA.
A typical hydropower plant has the following details:
| Month | Discharge (m³/s) | Flow duration | Discharge (m³/s) |
|---|---|---|---|
| January | 3.30 | Qmax (Q0) | 110.00 m³/s |
| February | 2.20 | Q25% | 16.42 m³/s |
| March | 1.40 | Q45% | 6.82 m³/s |
| April | 1.00 | Q65% | 3.7 m³/s |
| May | 3.50 | Q85% | 2.10 m³/s |
| June | 6.00 | Q95% | 1.17 m³/s |
| July | 14.00 | Qmin | 0.64 m³/s |
| August | 35.00 | ||
| September | 24.00 | ||
| October | 12.00 | ||
| November | 7.50 | ||
| December | 5.00 |
| Turbine type | Head range (m) |
|---|---|
| Kaplan | 2 < H < 40 |
| Francis | 10 < H < 350 |
| Pelton | 50 < H < 1300 |
| Parameter | Value |
|---|---|
| Gross head | 95 m |
| Turbine efficiency | 90% |
| Generator efficiency | 97% |
| Transformer efficiency | 98% |
| Head loss | 5% |
| Riparian release | 10% |
| Generator sub-transient reactance | 20% |
| Transformer reactance | 11% |
| Transmission line inductance | 0.77 mH/km |
| Transmission line length | 80 km |
| Transmission voltage level | 66 kV |
| Generator voltage level | 11 kV |
| Transmission circuit | Single circuit |
Design a hydro power plant so as to obtain following parameters a) Electrical power output taking design discharge as Q65%. [1] b) Select the numbers of unit and installed capacity. [2] c) Select the type of turbine. [3] d) Select the type of bus bar to be used. [2] e) Draw the single line diagram showing number of units, generator, power transformer, station transformer and diesel generator for black start. [4] f) Calculate the rating of generator circuit breaker and high voltage circuit breaker in your design. [4]
Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 1,000 MVA at the 66 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).
a) Electrical power output at
Driest month = April (1 m³/s), so riparian release m³/s.
Answer: generator output = 2.782 MW; power delivered to the 66 kV bus = 2.727 MW.
b) Number of units and installed capacity
- Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
- One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
- Per unit: m³/s, generator output MW → rate each unit at 1.4 MW.
- Generator rating: MVA → 2 MVA, 11 kV, 0.85 pf, 50 Hz.
- One step-up transformer for both units: 4 MVA, 11/66 kV, YNd11 (standard size covering 2 × 1.65 MVA = 3.3 MVA).
Answer: installed capacity = 2 × 1.4 MW = 2.8 MW.
c) Type of turbine
m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.
Shaft power per unit kW. With (synchronous speeds) and , where :
| (rpm) | Poles | (metric, kW) |
|---|---|---|
| 1000 | 6 | 136.1 |
| 750 | 8 | 102.1 |
| 600 | 10 | 81.7 |
| 500 | 12 | 68.1 |
| 428.6 | 14 | 58.4 |
| 375 | 16 | 51.1 |
| 333.3 | 18 | 45.4 |
Usual ranges: Pelton about 10–30 per jet (multi-jet ), Francis about 60–300, Kaplan 300–1000.
Choose rpm (6 poles): , which is in the medium Francis range. A Pelton would need many jets (single-jet far above 30), and Kaplan is ruled out because the head is above 40 m.
Answer: 2 × vertical-axis Francis turbines, 1000 rpm, about 1.43 MW each.
d) Type of bus bar
- 11 kV: single bus bar; the two small generators and the transformer feeder are connected to it through VCB panels.
- 66 kV: single bus bar with one transformer bay and one line bay.
Reason: the plant is only 2.8 MW with one line, so a simple single bus is the most economical; an outage of the bus means loss of a small block of power only, and maintenance can be planned for the dry season.
e) Single line diagram
Line to grid (66 kV, 80 km)
|
[CB]
|
===+======+=== 66 kV bus
|
[CB]
|
(T1)
|
[CB]
|
===+======+======+=========+=== 11 kV bus
| | |
[GCB] [GCB] [CB]
| | |
(G1) (G2) (ST)
|
===========================+===+ 0.4 kV
|
[ACB]
|
(DG) black start
| Item | Rating |
|---|---|
| Generators G1–G2 | 2 MVA, 11 kV, 0.85 pf, 1000 rpm, = 20% |
| Step-up transformer T1 | 4 MVA, 11/66 kV, YNd11, = 11% |
| Station transformer ST | 100 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity) |
| Diesel generator DG | 62.5 kVA, 0.4 kV (essential auxiliaries for black start) |
| Line | 66 kV, single circuit, 80 km to grid substation |
| NGR | neutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred) |
GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.
f) Rating of generator circuit breaker (GCB)
Per-unit reactances on 100 MVA base:
All generators feed the common 11 kV bus, so the GCB is rated for the full 11 kV bus fault level (generators plus the grid through the step-up transformers):
| Parameter | Required | Selected |
|---|---|---|
| Rated voltage | 11 kV system | 12 kV |
| Rated normal current | ≥ 131 A | 630 A |
| Breaking capacity | 50.4 MVA (2.64 kA) | 25 kA (520 MVA at 12 kV) |
| Making capacity | 6.74 kA peak | 63 kA peak |
| Short-time current | – | 25 kA, 3 s |
| Type | – | Vacuum (or SF6), generator-duty tested (IEEE C37.013) |
Answer: GCB fault level = 50.4 MVA; select a 12 kV, 630 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.
f) (contd.) Rating of HV circuit breaker
For a fault on the 66 kV bus, the plant and the grid feed in parallel:
| Parameter | Required | Selected |
|---|---|---|
| Rated voltage | 66 kV system | 72.5 kV |
| Rated normal current | ≥ 44 A | 630 A |
| Breaking capacity | 196.6 MVA (1.72 kA) | 25 kA |
| Making capacity | 4.39 kA peak | 63 kA peak |
| BIL | – | 325 kVp |
| Type | – | SF6, outdoor, spring mechanism, 3-pole |
Answer: HV bus fault level = 196.6 MVA (1.72 kA); select a 72.5 kV, 630 A, 25 kA SF6 circuit breaker. Of this, the plant itself contributes only 12.9 MVA; the rest comes from the grid, so the result depends on the assumed grid fault level.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 230 m head plant, 45 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 330 m head plant, 132 kV · Power Plant Design, chapter 4 · asked 12×
- Design: 250 m head plant at Q25% · Power Plant Design, chapter 4 · asked 14×
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Design: 230 m head plant, 20 km line · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant, 66 kV double circuit · Power Plant Design, chapter 4 · asked 13×
- Design: 245 m head plant, standby generator · Power Plant Design, chapter 4 · asked 14×
- Design: 280 m head plant, 66 kV · Power Plant Design, chapter 4 · asked 12×
- Design: 230 m head plant, 55 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 300 m head plant, GCB rating · Power Plant Design, chapter 4 · asked 11×
- Design: 310 m head plant, HV breaker · Power Plant Design, chapter 4 · asked 3×
- Design: 550 m head plant, transformer quotation · Power Plant Design, chapter 4 · asked 3×
- Design: 120 m head plant, 33 kV · Power Plant Design, chapter 4 · asked 3×
- Design: 260 m head plant, generator lead · Power Plant Design, chapter 4 · asked 5×
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Flow duration curve and power at mean flow · Hydropower Engineering, chapter 3