- 2082 Shrawan · 3+3+3+3+4+4 marks
Design: 330 m head plant, 132 kV
Short answer
Design discharge Q45% minus 10% riparian release gives 9.365 m³/s, net head 313.5 m. Generator output is 25.144 MW. Two units of 12.6 MW each, with 15 MVA, 11 kV generators. Select 4-jet Pelton turbines at 428.6 rpm. Use unit generator-transformer scheme with GCB.
A typical hydropower plant has the following details:
| Month | Discharge (m³/s) | Flow duration | Discharge (m³/s) |
|---|---|---|---|
| January | 5.62 | Qmax (Q0) | 210.00 m³/s |
| February | 4.80 | Q25% | 24.23 m³/s |
| March | 4.55 | Q45% | 9.82 m³/s |
| April | 4.8 | Q65% | 4.7 m³/s |
| May | 5.90 | Q85% | 3.1 m³/s |
| June | 12.70 | Q95% | 2.17 m³/s |
| July | 42.98 | Qmin | 0.64 m³/s |
| August | 100.26 | ||
| September | 64.23 | ||
| October | 24.00 | ||
| November | 10.37 | ||
| December | 6.80 |
| Turbine type | Head range (m) |
|---|---|
| Kaplan | 2 < H < 40 |
| Francis | 10 < H < 350 |
| Pelton | 50 < H < 1300 |
| Parameter | Value |
|---|---|
| Gross head | 330 m |
| Turbine efficiency | 90% |
| Generator efficiency | 97% |
| Transformer efficiency | 99% |
| Head loss | 5% |
| Riparian release | 10% |
| Generator sub-transient reactance | 21% |
| Transformer reactance | 9.15% |
| Transmission line inductance | 0.95 mH/km |
| Transmission line length | 20 km |
| Transmission voltage level | 132 kV |
| Generator voltage level | 11 kV |
Design a power plant so to obtain following parameters: (i) Electrical power output or installed capacity taking design discharge as Q45%. [3] (ii) Select numbers of units [3] (iii) Select the type of turbine [3] (iv) Show appropriate generator transformer scheme. [3] (v) Draw single line diagram showing number of units, generator, power transformer, station transformer and diesel generator for black start. [4] (vi) Calculate the rating of the transmission line side circuit breaker (HVCB) to be used in your design. [4]
Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 2,000 MVA at the 132 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given). The line is taken as a single circuit (not stated).
(i) Installed capacity at
Driest month = March (4.55 m³/s), so riparian release m³/s.
Answer: generator output = 25.144 MW; power delivered to the 132 kV bus = 24.892 MW.
(ii) Number of units
- Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
- One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
- Per unit: m³/s, generator output MW → rate each unit at 12.6 MW.
- Generator rating: MVA → 15 MVA, 11 kV, 0.85 pf, 50 Hz.
- Step-up transformer, one per unit: 16 MVA, 11/132 kV, YNd11 (next standard size above 15 MVA).
Answer: installed capacity = 2 × 12.6 MW = 25.2 MW.
(iii) Type of turbine
m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.
Shaft power per unit kW. With (synchronous speeds) and , where :
| (rpm) | Poles | (metric, kW) |
|---|---|---|
| 1000 | 6 | 86.3 |
| 750 | 8 | 64.7 |
| 600 | 10 | 51.8 |
| 500 | 12 | 43.2 |
| 428.6 | 14 | 37.0 |
| 375 | 16 | 32.4 |
| 333.3 | 18 | 28.8 |
Usual ranges: Pelton about 10–30 per jet (multi-jet ), Francis about 60–300, Kaplan 300–1000.
Choose rpm (14 poles): . With 4 jets, , inside the Pelton range.
Check of jet ratio: jet velocity m/s; bucket speed ; runner diameter m; jet diameter m; , acceptable.
A Francis at 1000 rpm () is also possible, but the Pelton is preferred because (i) its efficiency stays nearly flat from about 20% to 100% load (jets can be switched off), which suits a run-of-river plant whose flow falls far below the design flow in the dry season, and (ii) it tolerates the heavy sediment of Himalayan rivers better, and worn buckets and needles are easier to repair.
Answer: 2 × vertical-axis 4-jet Pelton turbines, 428.6 rpm, about 12.96 MW each.
(iv) Generator–transformer scheme
Choose the unit scheme (one generator connected to its own step-up transformer, with a generator circuit breaker between them).
| Point | Unit scheme (chosen) | Common bus / group scheme |
|---|---|---|
| Fault level at 11 kV | Low (one machine only) | High (all machines in parallel) |
| Effect of a transformer fault | Only one unit lost | Whole plant may trip |
| Maintenance outage | One unit at a time | Common transformer outage stops all |
| 11 kV switchgear | Only GCB and short leads | Large 11 kV bus and breakers |
| Losses / efficiency | No 11 kV bus losses | More 11 kV copper losses |
| Cost | More transformers | Fewer, larger transformers |
Reasons: the units are large (15 MVA each, about 787 A at 11 kV), the transmission voltage is 132 kV, and the unit scheme keeps the 11 kV fault level and generator-voltage switchgear small. The GCB lets the unit be synchronised and tripped at 11 kV while the station transformer, tapped between the GCB and the step-up transformer, stays fed from the grid (back-feed) when the unit is stopped.
(v) Single line diagram
Line to grid (132 kV, 20 km)
|
[CB]
|
===+====+================+=== 132 kV bus
| |
[CB] [CB]
| |
(T1) (T2)
| |
ST1 ---+ +--- ST2
| |
[GCB] [GCB]
| |
(G1) (G2)
| |
[NGT] [NGT]
ST1, ST2 (11/0.4 kV)
| |
===+====[BS]=======+=== 0.4 kV aux bus
|
[ACB]
|
(DG) diesel set, black start
| Item | Rating |
|---|---|
| Generators G1–G2 | 15 MVA, 11 kV, 0.85 pf, 428.6 rpm, = 21% |
| Step-up transformers T1–T2 | 16 MVA each, 11/132 kV, YNd11, = 9.15% |
| Station transformer ST1, ST2 | 400 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity) |
| Diesel generator DG | 250 kVA, 0.4 kV (essential auxiliaries for black start) |
| Line | 132 kV, single circuit, 20 km to grid substation |
| NGT | neutral grounding transformer with secondary resistor (high-resistance earthing) |
| 132 kV bus | double main bus with bus coupler (drawn as one line) |
BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.
Bus bar used in the SLD
- 132 kV switchyard: double main bus bar with a bus coupler. Each bay (transformer or line) can be put on either bus, so one bus can be maintained without shutting down the plant and a bus fault affects only the circuits on that bus. This is the NEA practice at 132 kV and above.
- 11 kV: no common bus (unit scheme); each generator connects to its transformer through the GCB.
(vi) Rating of the transmission line side circuit breaker (HVCB)
Per-unit reactances on 100 MVA base:
For a fault on the 132 kV bus, the plant and the grid feed in parallel:
| Parameter | Required | Selected |
|---|---|---|
| Rated voltage | 132 kV system | 145 kV |
| Rated normal current | ≥ 175 A | 1250 A |
| Breaking capacity | 1288.3 MVA (5.63 kA) | 31.5 kA |
| Making capacity | 14.37 kA peak | 80 kA peak |
| BIL | – | 650 kVp |
| Type | – | SF6, outdoor, spring mechanism, 3-pole, single-pole tripping for auto-reclose |
Answer: HV bus fault level = 1288.3 MVA (5.63 kA); select a 145 kV, 1250 A, 31.5 kA SF6 circuit breaker. Of this, the plant itself contributes only 101.4 MVA; the rest comes from the grid, so the result depends on the assumed grid fault level.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design: 95 m head plant at Q65% · Power Plant Design, chapter 4 · asked 12×
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 230 m head plant, 45 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 250 m head plant at Q25% · Power Plant Design, chapter 4 · asked 14×
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Design: 230 m head plant, 20 km line · Power Plant Design, chapter 4 · asked 14×
- Design: 245 m head plant, standby generator · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant, 66 kV double circuit · Power Plant Design, chapter 4 · asked 13×
- Design: 300 m head plant, GCB rating · Power Plant Design, chapter 4 · asked 11×
- Design: 280 m head plant, 66 kV · Power Plant Design, chapter 4 · asked 12×
- Design: 230 m head plant, 55 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 360 m head plant, 132 kV · Power Plant Design, chapter 4 · asked 5×
- Design: 550 m head plant, transformer quotation · Power Plant Design, chapter 4 · asked 3×
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3