Design: 300 m head plant, GCB rating

Short answer

Design discharge Q45% minus riparian release yields 9.445 m³/s, net head 285 m. Generator output is 23.309 MW. Install two 11.7 MW units, each with 14 MVA, 11 kV generator. Turbine: 4-jet Pelton, 428.6 rpm. Unit scheme with GCB; transmission voltage 132 kV.

A typical hydropower plant has the following details:

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
January6.90Qmax (Q0)218.00 m³/s
February5.86Q25%28.24 m³/s
March4.58Q45%9.80 m³/s
April3.55Q65%6.7 m³/s
May5.10Q85%4.1 m³/s
June17.70Q95%2.9 m³/s
July72.95Qmin1.64 m³/s
August120.26
September98.23
October25.05
November8.38
December7.85
Turbine typeHead range (m)
Kaplan2 < H < 40
Francis10 < H < 350
Pelton50 < H < 1300
ParameterValue
Gross head300 m
Turbine efficiency91%
Generator efficiency97%
Transformer efficiency99%
Head loss5%
Riparian release10%
Generator sub-transient reactance21%
Transformer reactance9.15%
Transmission line inductance0.92 mH/km
Transmission line length20 km
Generator voltage level11 kV

Design a power plant so to obtain following parameters: (i) Installed capacity in MW taking design discharge as Q45% [3] (ii) Select numbers of units [3] (iii) Select the type of turbine [3] (iv) Choose suitable generator transformer scheme. [3] (v) Draw single line diagram showing number of units, generator, power transformer, station transformer and diesel generator for black start. [4] (vi) Calculate the rating of the generator circuit breaker (GCB) to be used in your design. [4] [Charts attached: turbine head-range table; turbine application chart for higher head (head against flow with Pelton, Turgo and Francis envelopes); chart for lower head (Pelton, Turgo, Crossflow, Francis and Kaplan envelopes); specific speed against net head chart]

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 2,000 MVA at the 132 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

Transmission voltage (not given)

Use Still's formula for the economical voltage (L in km, P in kW):

V=5.5L1.6+P100=5.5201.6+23400100=86.4 kV\begin{aligned} V &= 5.5\sqrt{\frac{L}{1.6} + \frac{P}{100}} = 5.5\sqrt{\frac{20}{1.6} + \frac{23400}{100}} = 86.4\ \text{kV} \end{aligned}

Still's value of 86.4 kV lies between 66 kV and 132 kV; choose 132 kV, single circuit, the NEA grid voltage, which also leaves room for future projects in the area.

(i) Installed capacity in MW at Q45%Q_{45\%}

Driest month = April (3.55 m³/s), so riparian release Qr=0.1×3.55=0.355Q_r = 0.1 \times 3.55 = 0.355 m³/s.

Qd=Q45%−Qr=9.8−0.355=9.445 m3/sHn=Hg(1−0.05)=300−15.00=285.00 mPhyd=ρgQdHn=9.81×9.445×285.00=26.407 MWPshaft=ηtPhyd=0.91×26.407=24.030 MWPgen=ηgPshaft=0.97×24.030=23.309 MWPout=ηtrPgen=0.99×23.309=23.076 MW\begin{aligned} Q_d &= Q_{45\%} - Q_r = 9.8 - 0.355 = 9.445\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.05) = 300 - 15.00 = 285.00\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 9.445 \times 285.00 = 26.407\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.91 \times 26.407 = 24.030\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.97 \times 24.030 = 23.309\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.99 \times 23.309 = 23.076\ \text{MW} \end{aligned}

Answer: generator output = 23.309 MW; power delivered to the 132 kV bus = 23.076 MW.

(ii) Number of units

  • Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
  • One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
  • Per unit: Q=9.445/2=4.723Q = 9.445/2 = 4.723 m³/s, generator output =23.309/2=11.655= 23.309/2 = 11.655 MW → rate each unit at 11.7 MW.
  • Generator rating: S=11.7/0.85=13.76S = 11.7/0.85 = 13.76 MVA → 14 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 16 MVA, 11/132 kV, YNd11 (next standard size above 14 MVA).

Answer: installed capacity = 2 × 11.7 MW = 23.4 MW.

(iii) Type of turbine

Hn=285.00H_n = 285.00 m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.

Shaft power per unit P=24.030/2=12015.1P = 24.030/2 = 12015.1 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=1171.0H_n^{5/4} = 1171.0:

NN (rpm)PolesNsN_s (metric, kW)
1000693.6
750870.2
6001056.2
5001246.8
428.61440.1
3751635.1
333.31831.2

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=428.6N = 428.6 rpm (14 poles): Ns=40.1N_s = 40.1. With 4 jets, Ns,jet=40.1/4=20.1N_{s,jet} = 40.1/\sqrt{4} = 20.1, inside the Pelton range.

Check of jet ratio: jet velocity Vj=0.982gHn=73.3V_j = 0.98\sqrt{2gH_n} = 73.3 m/s; bucket speed u=0.46Vju = 0.46V_j; runner diameter D=60u/(πN)=1.50D = 60u/(\pi N) = 1.50 m; jet diameter d=4(Q/z)/(πVj)=0.143d = \sqrt{4(Q/z)/(\pi V_j)} = 0.143 m; D/d=10.5>10D/d = 10.5 > 10, acceptable.

A Francis at 1000 rpm (Ns=93.6N_s = 93.6) is also possible, but the Pelton is preferred because (i) its efficiency stays nearly flat from about 20% to 100% load (jets can be switched off), which suits a run-of-river plant whose flow falls far below the design flow in the dry season, and (ii) it tolerates the heavy sediment of Himalayan rivers better, and worn buckets and needles are easier to repair.

Answer: 2 × vertical-axis 4-jet Pelton turbines, 428.6 rpm, about 12.02 MW each.

(iv) Generator–transformer scheme

Choose the unit scheme (one generator connected to its own step-up transformer, with a generator circuit breaker between them).

PointUnit scheme (chosen)Common bus / group scheme
Fault level at 11 kVLow (one machine only)High (all machines in parallel)
Effect of a transformer faultOnly one unit lostWhole plant may trip
Maintenance outageOne unit at a timeCommon transformer outage stops all
11 kV switchgearOnly GCB and short leadsLarge 11 kV bus and breakers
Losses / efficiencyNo 11 kV bus lossesMore 11 kV copper losses
CostMore transformersFewer, larger transformers

Reasons: the units are large (14 MVA each, about 735 A at 11 kV), the transmission voltage is 132 kV, and the unit scheme keeps the 11 kV fault level and generator-voltage switchgear small. The GCB lets the unit be synchronised and tripped at 11 kV while the station transformer, tapped between the GCB and the step-up transformer, stays fed from the grid (back-feed) when the unit is stopped.

(v) Single line diagram

 Line to grid  (132 kV, 20 km)
    |
  [CB]
    |
 ===+====+================+=== 132 kV bus
         |                |
       [CB]             [CB]
         |                |
       (T1)             (T2)
         |                |
  ST1 ---+                +--- ST2
         |                |
       [GCB]            [GCB]
         |                |
       (G1)             (G2)
         |                |
       [NGT]            [NGT]

 ST1, ST2 (11/0.4 kV)
    |               |
 ===+====[BS]=======+=== 0.4 kV aux bus
              |
            [ACB]
              |
            (DG)  diesel set, black start
ItemRating
Generators G1–G214 MVA, 11 kV, 0.85 pf, 428.6 rpm, Xd′′X''_d = 21%
Step-up transformers T1–T216 MVA each, 11/132 kV, YNd11, XX = 9.15%
Station transformer ST1, ST2400 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity)
Diesel generator DG250 kVA, 0.4 kV (essential auxiliaries for black start)
Line132 kV, single circuit, 20 km to grid substation
NGTneutral grounding transformer with secondary resistor (high-resistance earthing)
132 kV busdouble main bus with bus coupler (drawn as one line)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

(vi) Rating of generator circuit breaker (GCB)

Per-unit reactances on 100 MVA base:

xg=0.21×10014=1.5000 pu,xt=0.0915×10016=0.5719 puXL=2πfLl=2π×50×0.92×10−3×20=5.781 Ωxl=XL×1001322=5.781174.24=0.0332 pu,xgrid=1002000=0.0500 puxgrid path=0.0500+0.0332=0.0832 pu\begin{aligned} x_g &= 0.21 \times \frac{100}{14} = 1.5000\ \text{pu}, \quad x_t = 0.0915 \times \frac{100}{16} = 0.5719\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.92\times10^{-3} \times 20 = 5.781\ \Omega \\ x_l &= \frac{X_L \times 100}{132^2} = \frac{5.781}{174.24} = 0.0332\ \text{pu}, \quad x_{grid} = \frac{100}{2000} = 0.0500\ \text{pu} \\ x_{grid\ path} &= 0.0500 + 0.0332 = 0.0832\ \text{pu} \end{aligned}

A unit-connected GCB sees the larger of two currents: (a) a fault on the transformer side fed by its own generator, (b) a fault on the generator side fed by the system through the unit transformer (grid plus the other units).

Sa=100xg=1001.5000=66.7 MVAXext=xgrid path∥(xg+xt)=0.0832∥2.0719=0.0800 puSb=100xt+Xext=1000.5719+0.0800=153.4 MVA\begin{aligned} S_a &= \frac{100}{x_g} = \frac{100}{1.5000} = 66.7\ \text{MVA} \\ X_{ext} &= x_{grid\ path} \parallel (x_g + x_t) = 0.0832 \parallel 2.0719 = 0.0800\ \text{pu} \\ S_b &= \frac{100}{x_t + X_{ext}} = \frac{100}{0.5719 + 0.0800} = 153.4\ \text{MVA} \end{aligned}

Design fault level for the GCB = larger value = 153.4 MVA.

Isc=153.43×11=8.05 kA,Imake=2.55×8.05=20.53 kA peakIFL=143×11=735 A,1.25IFL=919 A\begin{aligned} I_{sc} &= \frac{153.4}{\sqrt{3} \times 11} = 8.05\ \text{kA}, \quad I_{make} = 2.55 \times 8.05 = 20.53\ \text{kA peak} \\ I_{FL} &= \frac{14}{\sqrt{3} \times 11} = 735\ \text{A}, \quad 1.25 I_{FL} = 919\ \text{A} \end{aligned}
ParameterRequiredSelected
Rated voltage11 kV system12 kV
Rated normal current≥ 919 A1250 A
Breaking capacity153.4 MVA (8.05 kA)25 kA (520 MVA at 12 kV)
Making capacity20.53 kA peak63 kA peak
Short-time current–25 kA, 3 s
Type–Vacuum (or SF6), generator-duty tested (IEEE C37.013)

Answer: GCB fault level = 153.4 MVA; select a 12 kV, 1250 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Power Plant Design chapter 4 questions →