Skip to main content

Design: 245 m head plant, standby generator

Short answer

Generator output 14.050 MW, delivered 13.769 MW. Install 2×7.1 MW (14.2 MW total). Two vertical-axis 4-jet Pelton turbines, 428.6 rpm. Single-line diagram includes diesel standby generator; GCB rated 8.5 MVA, 11 kV.

A typical hydro power plant has the following details.

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
January4.9Qmax (Q0)211.00 m³/s
February3.86Q25%18.24 m³/s
March3.58Q45%7.20 m³/s
April4.55Q65%4.70 m³/s
May3.00Q85%3.10 m³/s
June12.77Q95%2.17 m³/s
July32.95Qmin0.64 m³/s
August40.26
September31.23
October15.05
November7.38
December4.85
Turbine typeHead range (m)
Kaplan2 < H < 40
Francis10 < H < 350
Pelton50 < H < 1300
ParameterValue
Gross head245 m
Turbine efficiency91%
Generator efficiency98%
Transformer efficiency98%
Head loss5%
Riparian release10%
Generator sub-transient reactance21%
Transformer reactance9.15%
Transmission line inductance0.9 mH/km
Transmission line length50 km
Transmission voltage level66 kV
Generator voltage level11 kV
Transmission circuitDouble circuit

Design a power plant so as to obtain the following parameters: a) Electrical power output taking design discharge as Q45% b) Select the numbers of units and installed capacity c) Select the type of turbine d) Draw the single line diagram showing generators, power transformers, station transformer and a stand by generator for black start e) Calculate the rating of generator circuit breaker to be used in your design. (Assume suitable data if necessary and necessary graph is attached herewith)

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 1,000 MVA at the 66 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

a) Electrical power output at Q45%Q_{45\%}

Driest month = May (3 m³/s), so riparian release Qr=0.1×3=0.3Q_r = 0.1 \times 3 = 0.3 m³/s.

Qd=Q45%−Qr=7.2−0.3=6.900 m3/sHn=Hg(1−0.05)=245−12.25=232.75 mPhyd=ρgQdHn=9.81×6.900×232.75=15.755 MWPshaft=ηtPhyd=0.91×15.755=14.337 MWPgen=ηgPshaft=0.98×14.337=14.050 MWPout=ηtrPgen=0.98×14.050=13.769 MW\begin{aligned} Q_d &= Q_{45\%} - Q_r = 7.2 - 0.3 = 6.900\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.05) = 245 - 12.25 = 232.75\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 6.900 \times 232.75 = 15.755\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.91 \times 15.755 = 14.337\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.98 \times 14.337 = 14.050\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.98 \times 14.050 = 13.769\ \text{MW} \end{aligned}

Answer: generator output = 14.050 MW; power delivered to the 66 kV bus = 13.769 MW.

b) Number of units and installed capacity

  • Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
  • One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
  • Per unit: Q=6.900/2=3.450Q = 6.900/2 = 3.450 m³/s, generator output =14.050/2=7.025= 14.050/2 = 7.025 MW → rate each unit at 7.1 MW.
  • Generator rating: S=7.1/0.85=8.35S = 7.1/0.85 = 8.35 MVA → 8.5 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 10 MVA, 11/66 kV, YNd11 (next standard size above 8.5 MVA).

Answer: installed capacity = 2 × 7.1 MW = 14.2 MW.

c) Type of turbine

Hn=232.75H_n = 232.75 m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.

Shaft power per unit P=14.337/2=7168.3P = 14.337/2 = 7168.3 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=909.1H_n^{5/4} = 909.1:

NN (rpm)PolesNsN_s (metric, kW)
1000693.1
750869.8
6001055.9
5001246.6
428.61439.9
3751634.9
333.31831.0

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=428.6N = 428.6 rpm (14 poles): Ns=39.9N_s = 39.9. With 4 jets, Ns,jet=39.9/4=20.0N_{s,jet} = 39.9/\sqrt{4} = 20.0, inside the Pelton range.

Check of jet ratio: jet velocity Vj=0.982gHn=66.2V_j = 0.98\sqrt{2gH_n} = 66.2 m/s; bucket speed u=0.46Vju = 0.46V_j; runner diameter D=60u/(πN)=1.36D = 60u/(\pi N) = 1.36 m; jet diameter d=4(Q/z)/(πVj)=0.129d = \sqrt{4(Q/z)/(\pi V_j)} = 0.129 m; D/d=10.5>10D/d = 10.5 > 10, acceptable.

A Francis at 1000 rpm (Ns=93.1N_s = 93.1) is also possible, but the Pelton is preferred because (i) its efficiency stays nearly flat from about 20% to 100% load (jets can be switched off), which suits a run-of-river plant whose flow falls far below the design flow in the dry season, and (ii) it tolerates the heavy sediment of Himalayan rivers better, and worn buckets and needles are easier to repair.

Answer: 2 × vertical-axis 4-jet Pelton turbines, 428.6 rpm, about 7.17 MW each.

d) Single line diagram (standby diesel generator for black start)

 Line-1          Line-2  (66 kV, 50 km)
    |               |
  [CB]            [CB]
    |               |
 ===+=====+=========+===+=== 66 kV bus
          |             |
        [CB]          [CB]
          |             |
        (T1)          (T2)
          |             |
        [CB]          [CB]
          |             |
 =========+====[BS]=====+=========+=== 11 kV bus
          |             |         |
        [GCB]         [GCB]     [CB]
          |             |         |
        (G1)          (G2)      (ST)
                                  |
 =================================+===+ 0.4 kV
                                      |
                                    [ACB]
                                      |
                                    (DG) black start
ItemRating
Generators G1–G28.5 MVA, 11 kV, 0.85 pf, 428.6 rpm, Xd′′X''_d = 21%
Step-up transformers T1–T210 MVA each, 11/66 kV, YNd11, XX = 9.15%
Station transformer ST250 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity)
Diesel generator DG160 kVA, 0.4 kV (essential auxiliaries for black start)
Line66 kV, double circuit, 50 km to grid substation
NGRneutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

e) Rating of generator circuit breaker

Per-unit reactances on 100 MVA base:

xg=0.21×1008.5=2.4706 pu,xt=0.0915×10010=0.9150 puXL=2πfLl=2π×50×0.9×10−3×50=14.137 Ω per circuit; two in parallel=7.069 Ωxl=XL×100662=7.06943.56=0.1623 pu,xgrid=1001000=0.1000 puxgrid path=0.1000+0.1623=0.2623 pu\begin{aligned} x_g &= 0.21 \times \frac{100}{8.5} = 2.4706\ \text{pu}, \quad x_t = 0.0915 \times \frac{100}{10} = 0.9150\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.9\times10^{-3} \times 50 = 14.137\ \Omega \text{ per circuit; two in parallel} = 7.069\ \Omega \\ x_l &= \frac{X_L \times 100}{66^2} = \frac{7.069}{43.56} = 0.1623\ \text{pu}, \quad x_{grid} = \frac{100}{1000} = 0.1000\ \text{pu} \\ x_{grid\ path} &= 0.1000 + 0.1623 = 0.2623\ \text{pu} \end{aligned}

All generators feed the common 11 kV bus, so the GCB is rated for the full 11 kV bus fault level (generators plus the grid through the step-up transformers):

Sgen=2×1002.4706=81.0 MVASgrid=100xt/2+xgrid path=1000.4575+0.2623=138.9 MVAS11kV=81.0+138.9=219.9 MVA\begin{aligned} S_{gen} &= 2 \times \frac{100}{2.4706} = 81.0\ \text{MVA} \\ S_{grid} &= \frac{100}{x_t/2 + x_{grid\ path}} = \frac{100}{0.4575 + 0.2623} = 138.9\ \text{MVA} \\ S_{11kV} &= 81.0 + 138.9 = 219.9\ \text{MVA} \end{aligned} Isc=219.93×11=11.54 kA,Imake=2.55×11.54=29.43 kA peakIFL=8.53×11=446 A,1.25IFL=558 A\begin{aligned} I_{sc} &= \frac{219.9}{\sqrt{3} \times 11} = 11.54\ \text{kA}, \quad I_{make} = 2.55 \times 11.54 = 29.43\ \text{kA peak} \\ I_{FL} &= \frac{8.5}{\sqrt{3} \times 11} = 446\ \text{A}, \quad 1.25 I_{FL} = 558\ \text{A} \end{aligned}
ParameterRequiredSelected
Rated voltage11 kV system12 kV
Rated normal current≥ 558 A630 A
Breaking capacity219.9 MVA (11.54 kA)25 kA (520 MVA at 12 kV)
Making capacity29.43 kA peak63 kA peak
Short-time current–25 kA, 3 s
Type–Vacuum (or SF6), generator-duty tested (IEEE C37.013)

Answer: GCB fault level = 219.9 MVA; select a 12 kV, 630 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Power Plant Design chapter 4 questions →