- Asked 8/21
- 2072 Asoj · 32 marks
Design: 150 m head plant, bus MVA levels
Short answer
Design discharge Q45% minus riparian release = 10.735 m³/s, net head = 142.5 m. Station output 12.839 MW. Two units ×6.6 MW, installed13.2 MW. 8 MVA generators,8 MVA transformers. Francis turbine. SLD: 2 generators,2 transformers,ST,DG; single 66 kV bus, 11 kV bus with section breaker. Busbar type single bus. LV,MV,HV bus MVA and CB ratings from fault study.
A typical hydro power plant has the following details.
| Month | Discharge (m³/s) | Flow duration | Discharge (m³/s) |
|---|---|---|---|
| Jan | 6.13 | Qmax (Q0) | 449.46 m³/s |
| Feb | 5.10 | Q25% | 32.60 m³/s |
| Mar | 4.72 | Q45% | 11.17 m³/s |
| Apr | 6.12 | Q65% | 6.23 m³/s |
| May | 4.35 | Q85% | 4.14 m³/s |
| Jun | 21.68 | Q95% | 2.92 m³/s |
| July | 62.04 | Qmin | 0.93 m³/s |
| Aug | 73.37 | ||
| Sep | 56.55 | ||
| Oct | 26.13 | ||
| Nov | 12.65 | ||
| Dec | 8.24 |
| Turbine type | Head range (m) |
|---|---|
| Kaplan | 2 < H < 40 |
| Francis | 10 < H < 350 |
| Pelton | 50 < H < 1300 |
| Parameter | Value |
|---|---|
| Gross head | 150 m |
| Turbine efficiency | 90% |
| Generator efficiency | 97% |
| Transformer efficiency | 98% |
| Head loss | 5% |
| Riparian release | 10% |
| Generator sub-transient reactance | 15% |
| Transformer reactance | 12% |
| Transmission line inductance | 0.97 mH/km |
| Transmission line length | 35 km |
| Transmission voltage level | 66 kV |
| Generator voltage level | 11 kV |
| Transmission circuit | Single circuit |
Design a power plant so as to obtain the following parameters: a. Electrical power output taking design discharge as Q45% b. Select the numbers of units and installed capacity with suitable reasons c. Draw the single line diagram showing numbers of units, generators, power transformer, station transformer and diesel generator for black start d. Select the type of turbine e. Select the type of busbar with suitable reasons f. Calculate the MVA level of LV bus, MV bus and HV bus g. Calculate the rating of CB to be used in your design. (Assume suitable data if required and the necessary graph is attached herewith)
Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 1,000 MVA at the 66 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).
a. Electrical power output at
Driest month = May (4.35 m³/s), so riparian release m³/s.
Answer: generator output = 13.101 MW; power delivered to the 66 kV bus = 12.839 MW.
b. Number of units and installed capacity
- Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
- One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
- Per unit: m³/s, generator output MW → rate each unit at 6.6 MW.
- Generator rating: MVA → 8 MVA, 11 kV, 0.85 pf, 50 Hz.
- Step-up transformer, one per unit: 8 MVA, 11/66 kV, YNd11 (standard size matching the 8 MVA generator).
Answer: installed capacity = 2 × 6.6 MW = 13.2 MW.
c. Single line diagram
Line to grid (66 kV, 35 km)
|
[CB]
|
===+=====+=============+=== 66 kV bus
| |
[CB] [CB]
| |
(T1) (T2)
| |
[CB] [CB]
| |
=========+====[BS]=====+=========+=== 11 kV bus
| | |
[GCB] [GCB] [CB]
| | |
(G1) (G2) (ST)
|
=================================+===+ 0.4 kV
|
[ACB]
|
(DG) black start
| Item | Rating |
|---|---|
| Generators G1–G2 | 8 MVA, 11 kV, 0.85 pf, 750 rpm, = 15% |
| Step-up transformers T1–T2 | 8 MVA each, 11/66 kV, YNd11, = 12% |
| Station transformer ST | 200 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity) |
| Diesel generator DG | 125 kVA, 0.4 kV (essential auxiliaries for black start) |
| Line | 66 kV, single circuit, 35 km to grid substation |
| NGR | neutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred) |
BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.
d. Type of turbine
m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.
Shaft power per unit kW. With (synchronous speeds) and , where :
| (rpm) | Poles | (metric, kW) |
|---|---|---|
| 1000 | 6 | 166.9 |
| 750 | 8 | 125.2 |
| 600 | 10 | 100.1 |
| 500 | 12 | 83.5 |
| 428.6 | 14 | 71.5 |
| 375 | 16 | 62.6 |
| 333.3 | 18 | 55.6 |
Usual ranges: Pelton about 10–30 per jet (multi-jet ), Francis about 60–300, Kaplan 300–1000.
Choose rpm (8 poles): , which is in the medium Francis range. A Pelton would need many jets (single-jet far above 30), and Kaplan is ruled out because the head is above 40 m.
Answer: 2 × vertical-axis Francis turbines, 750 rpm, about 6.75 MW each.
e. Type of bus bar
- 11 kV: single bus bar with a bus-section breaker, units split between the two sections, so a bus fault or maintenance takes out only part of the plant.
- 66 kV: single bus bar, sectionalised, with transformer bays and one line bay.
Reason: for a 13.2 MW plant a sectionalised single bus gives reasonable reliability at low cost; a double bus or main-and-transfer bus would cost much more and is normally used only for larger plants or grid substations.
f. MVA level of LV, MV and HV buses
LV = 0.4 kV auxiliary bus, MV = 11 kV generator bus, HV = 66 kV switchyard bus. Station transformer 200 kVA, 4.5%.
Per-unit reactances on 100 MVA base:
| Bus | Fault MVA | (kA) |
|---|---|---|
| LV (0.4 kV) | 4.35 | 6.27 |
| MV (11 kV) | 198.0 | 10.39 |
| HV (66 kV) | 349.2 | 3.06 |
Answer: LV ≈ 4.35 MVA, MV ≈ 198.0 MVA, HV ≈ 349.2 MVA.
g. Rating of circuit breakers
Breaking current from the bus fault levels above; making current = 2.55 × (IEC 62271-100); rated current ≥ 1.25 × full-load current.
| Breaker | Full-load current | Required breaking | Selected |
|---|---|---|---|
| GCB / 11 kV CBs | 420 A per generator | 198.0 MVA, 10.39 kA (make 26.5 kA) | 12 kV, 630 A, 25 kA VCB |
| HV CB (66 kV) | 140 A total | 349.2 MVA, 3.06 kA (make 7.8 kA) | 72.5 kV, 630 A, 25 kA SF6 |
| LV ACB (0.4 kV) | 289 A (station tr.) | 4.35 MVA, 6.27 kA (make 10.7 kA*) | 415 V, 400 A, 25 kA ACB |
*At 0.4 kV the making current uses the IEC 60947-2 factor n = 1.7 for this fault current.
Answer: 11 kV GCB: 12 kV, 630 A, 25 kA; 66 kV CB: 72.5 kV, 630 A, 25 kA; 0.4 kV ACB: 400 A, 25 kA.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Design: 120 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 8×
- Design: 120 m head plant, 33 kV · Power Plant Design, chapter 4 · asked 3×
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Design: 230 m head plant, 20 km line · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant, 66 kV double circuit · Power Plant Design, chapter 4 · asked 13×
- Design: 245 m head plant, standby generator · Power Plant Design, chapter 4 · asked 14×
- Design: 250 m head plant at Q25% · Power Plant Design, chapter 4 · asked 14×
- Design: 360 m head plant, 132 kV · Power Plant Design, chapter 4 · asked 5×
- Design: 220 m head plant, optimal voltage · Power Plant Design, chapter 4
- Design: 589 m head plant at Q40% · Power Plant Design, chapter 4 · asked 3×
- Design: 310 m head plant, HV breaker · Power Plant Design, chapter 4 · asked 3×
- Design: 95 m head plant at Q65% · Power Plant Design, chapter 4 · asked 12×
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- Flow duration curve and power at mean flow · Hydropower Engineering, chapter 3
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3