Design: 589 m head plant at Q40%

Short answer

Design discharge Q40% after riparian release yields net head 565.44 m, generator output 61.111 MW, delivered 60.500 MW. Install three 20.4 MW Pelton units (61.2 MW total) with unit transformer scheme and GCB rated 24 MVA.

A typical hydro power plant has the following details

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
Baishakh6.26Qmax (Q0)157.00 m³/s
Jestha12.45Q25%18.24 m³/s
Ashad32.12Q40%12.85 m³/s
Shrawan49.08Q65%10.7 m³/s
Bhadra44.47Q85%6.40 m³/s
Ashoj23.88Q95%4.91 m³/s
Kartik11.57Qmin3.35 m³/s
Mangsir7.2
Poush5.06
Magh4.1
Falgun3.69
Chaitra4.25
Turbine typeHead range (m)
Kaplan and Propeller2 < H < 40
Francis10 < H < 350
Pelton50 < H < 1300
Michell-Banki3 < H < 250
Turgo50 < H < 250
ParameterValue
Gross head589 m
Turbine efficiency91%
Generator efficiency97%
Transformer efficiency99%
Head loss4%
Riparian release10% of driest flow
Generator sub-transient reactance18%
Transformer reactance7.15%
Transmission line inductance0.95 mH/km
Transmission line length12 km
Transmission voltage level132 kV
Generator voltage level11 kV
Transmission circuitDouble circuit

(Please make your own smart assumption if needed beside given data above) Design a power plant project so as to obtain following a) Electrical power output taking design discharge as Q40%. [3] b) Select the numbers of units and installed capacity. [2] c) Recommend the appropriate type of Generator-transformer scheme. [3] d) Make single line diagram for the project choosing your generator transformer scheme and bus bar system. [4] e) Find MVA rating of a generator circuit breaker of the project. [4]

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 4% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 2,000 MVA at the 132 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

a) Electrical power output at Q40%Q_{40\%}

Driest month = Falgun (3.69 m³/s), so riparian release Qr=0.1×3.69=0.369Q_r = 0.1 \times 3.69 = 0.369 m³/s.

Qd=Q40%−Qr=12.85−0.369=12.481 m3/sHn=Hg(1−0.04)=589−23.56=565.44 mPhyd=ρgQdHn=9.81×12.481×565.44=69.232 MWPshaft=ηtPhyd=0.91×69.232=63.001 MWPgen=ηgPshaft=0.97×63.001=61.111 MWPout=ηtrPgen=0.99×61.111=60.500 MW\begin{aligned} Q_d &= Q_{40\%} - Q_r = 12.85 - 0.369 = 12.481\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.04) = 589 - 23.56 = 565.44\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 12.481 \times 565.44 = 69.232\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.91 \times 69.232 = 63.001\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.97 \times 63.001 = 61.111\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.99 \times 61.111 = 60.500\ \text{MW} \end{aligned}

Answer: generator output = 61.111 MW; power delivered to the 132 kV bus = 60.500 MW.

b) Number of units and installed capacity

  • Choose 3 units. A plant of this size would need very large single machines with only two units, which are hard to transport on Nepal's hill roads; three units also let the plant follow the large seasonal change in flow (one or two units in the dry months, all three in the wet months).
  • Loss of one unit (forced outage or maintenance) removes only one third of the output.
  • Per unit: Q=12.481/3=4.160Q = 12.481/3 = 4.160 m³/s, generator output =61.111/3=20.370= 61.111/3 = 20.370 MW → rate each unit at 20.4 MW.
  • Generator rating: S=20.4/0.85=24.00S = 20.4/0.85 = 24.00 MVA → 24 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 25 MVA, 11/132 kV, YNd11 (next standard size above 24 MVA).

Answer: installed capacity = 3 × 20.4 MW = 61.2 MW.

Type of turbine (for unit speed)

Hn=565.44H_n = 565.44 m is above the Francis limit (350 m), so only a Pelton turbine is possible; specific speed fixes the speed and number of jets.

Shaft power per unit P=63.001/3=21000.3P = 63.001/3 = 21000.3 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=2757.3H_n^{5/4} = 2757.3:

NN (rpm)PolesNsN_s (metric, kW)
1000652.6
750839.4
6001031.5
5001226.3
428.61422.5
3751619.7
333.31817.5

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=750N = 750 rpm (8 poles): Ns=39.4N_s = 39.4. With 4 jets, Ns,jet=39.4/4=19.7N_{s,jet} = 39.4/\sqrt{4} = 19.7, inside the Pelton range.

Check of jet ratio: jet velocity Vj=0.982gHn=103.2V_j = 0.98\sqrt{2gH_n} = 103.2 m/s; bucket speed u=0.46Vju = 0.46V_j; runner diameter D=60u/(πN)=1.21D = 60u/(\pi N) = 1.21 m; jet diameter d=4(Q/z)/(πVj)=0.113d = \sqrt{4(Q/z)/(\pi V_j)} = 0.113 m; D/d=10.7>10D/d = 10.7 > 10, acceptable.

The Pelton also keeps high efficiency at part load and handles sediment well.

Answer: 3 × vertical-axis 4-jet Pelton turbines, 750 rpm, about 21.00 MW each.

c) Generator–transformer scheme

Choose the unit scheme (one generator connected to its own step-up transformer, with a generator circuit breaker between them).

PointUnit scheme (chosen)Common bus / group scheme
Fault level at 11 kVLow (one machine only)High (all machines in parallel)
Effect of a transformer faultOnly one unit lostWhole plant may trip
Maintenance outageOne unit at a timeCommon transformer outage stops all
11 kV switchgearOnly GCB and short leadsLarge 11 kV bus and breakers
Losses / efficiencyNo 11 kV bus lossesMore 11 kV copper losses
CostMore transformersFewer, larger transformers

Reasons: the units are large (24 MVA each, about 1260 A at 11 kV), the transmission voltage is 132 kV, and the unit scheme keeps the 11 kV fault level and generator-voltage switchgear small. The GCB lets the unit be synchronised and tripped at 11 kV while the station transformer, tapped between the GCB and the step-up transformer, stays fed from the grid (back-feed) when the unit is stopped.

d) Single line diagram

 Line-1          Line-2  (132 kV, 12 km)
    |               |
  [CB]            [CB]
    |               |
 ===+===+===========+===========+=== 132 kV bus
        |           |           |
      [CB]        [CB]        [CB]
        |           |           |
      (T1)        (T2)        (T3)
        |           |           |
 ST1 ---+           +           +--- ST2
        |           |           |
      [GCB]       [GCB]       [GCB]
        |           |           |
      (G1)        (G2)        (G3)
        |           |           |
      [NGT]       [NGT]       [NGT]

 ST1, ST2 (11/0.4 kV)
    |               |
 ===+====[BS]=======+=== 0.4 kV aux bus
              |
            [ACB]
              |
            (DG)  diesel set, black start
ItemRating
Generators G1–G324 MVA, 11 kV, 0.85 pf, 750 rpm, Xd′′X''_d = 18%
Step-up transformers T1–T325 MVA each, 11/132 kV, YNd11, XX = 7.15%
Station transformer ST1, ST21000 kVA, 11/0.4 kV, Dyn11, 5% (aux load about 1.5% of capacity)
Diesel generator DG625 kVA, 0.4 kV (essential auxiliaries for black start)
Line132 kV, double circuit, 12 km to grid substation
NGTneutral grounding transformer with secondary resistor (high-resistance earthing)
132 kV busdouble main bus with bus coupler (drawn as one line)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

d) (contd.) Bus bar system

  • 132 kV switchyard: double main bus bar with a bus coupler. Each bay (transformer or line) can be put on either bus, so one bus can be maintained without shutting down the plant and a bus fault affects only the circuits on that bus. This is the NEA practice at 132 kV and above.
  • 11 kV: no common bus (unit scheme); each generator connects to its transformer through the GCB.

e) MVA rating of generator circuit breaker

Per-unit reactances on 100 MVA base:

xg=0.18×10024=0.7500 pu,xt=0.0715×10025=0.2860 puXL=2πfLl=2π×50×0.95×10−3×12=3.581 Ω per circuit; two in parallel=1.791 Ωxl=XL×1001322=1.791174.24=0.0103 pu,xgrid=1002000=0.0500 puxgrid path=0.0500+0.0103=0.0603 pu\begin{aligned} x_g &= 0.18 \times \frac{100}{24} = 0.7500\ \text{pu}, \quad x_t = 0.0715 \times \frac{100}{25} = 0.2860\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.95\times10^{-3} \times 12 = 3.581\ \Omega \text{ per circuit; two in parallel} = 1.791\ \Omega \\ x_l &= \frac{X_L \times 100}{132^2} = \frac{1.791}{174.24} = 0.0103\ \text{pu}, \quad x_{grid} = \frac{100}{2000} = 0.0500\ \text{pu} \\ x_{grid\ path} &= 0.0500 + 0.0103 = 0.0603\ \text{pu} \end{aligned}

A unit-connected GCB sees the larger of two currents: (a) a fault on the transformer side fed by its own generator, (b) a fault on the generator side fed by the system through the unit transformer (grid plus the other units).

Sa=100xg=1000.7500=133.3 MVAXext=xgrid path∥(xg+xt)/2=0.0603∥0.5180=0.0540 puSb=100xt+Xext=1000.2860+0.0540=294.1 MVA\begin{aligned} S_a &= \frac{100}{x_g} = \frac{100}{0.7500} = 133.3\ \text{MVA} \\ X_{ext} &= x_{grid\ path} \parallel (x_g + x_t)/2 = 0.0603 \parallel 0.5180 = 0.0540\ \text{pu} \\ S_b &= \frac{100}{x_t + X_{ext}} = \frac{100}{0.2860 + 0.0540} = 294.1\ \text{MVA} \end{aligned}

Design fault level for the GCB = larger value = 294.1 MVA.

Isc=294.13×11=15.44 kA,Imake=2.55×15.44=39.37 kA peakIFL=243×11=1260 A,1.25IFL=1575 A\begin{aligned} I_{sc} &= \frac{294.1}{\sqrt{3} \times 11} = 15.44\ \text{kA}, \quad I_{make} = 2.55 \times 15.44 = 39.37\ \text{kA peak} \\ I_{FL} &= \frac{24}{\sqrt{3} \times 11} = 1260\ \text{A}, \quad 1.25 I_{FL} = 1575\ \text{A} \end{aligned}
ParameterRequiredSelected
Rated voltage11 kV system12 kV
Rated normal current≥ 1575 A1600 A
Breaking capacity294.1 MVA (15.44 kA)25 kA (520 MVA at 12 kV)
Making capacity39.37 kA peak63 kA peak
Short-time current–25 kA, 3 s
Type–Vacuum (or SF6), generator-duty tested (IEEE C37.013)

Answer: GCB fault level = 294.1 MVA; select a 12 kV, 1600 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.

✓ Answer checked by Claude Opus 5.5 (high effort)