Design: 250 m head plant at Q25%

Short answer

Design discharge Q25% minus riparian release = 17.89 m³/s, net head = 237.5 m. Station output 35.660 MW. Three units ×12.2 MW, installed 36.6 MW. 4‑jet Pelton turbines, 333.3 rpm. SLD: 3 generators, 3 transformers, ST, DG, double‑circuit 33 kV line, single bus with section breaker. Busbar type single bus. GCB rating based on generator MVA and fault level.

A typical hydro power plant has the following details.

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
January4.62Qmax (Q0)210.00 m³/s
February3.80Q25%18.24 m³/s
March3.55Q45%7.82 m³/s
April4.55Q65%4.7 m³/s
May3.5Q85%3.10 m³/s
June12.70Q95%2.17 m³/s
July32.98Qmin0.64 m³/s
August40.26
September31.23
October15.00
November7.37
December4.80
Turbine typeHead range (m)
Kaplan2 < H < 40
Francis10 < H < 350
Pelton50 < H < 1300
ParameterValue
Gross head250 m
Turbine efficiency90%
Generator efficiency97%
Transformer efficiency98%
Head loss5%
Riparian release10%
Generator sub-transient reactance21%
Transformer reactance9.15%
Transmission line inductance0.95 mH/km
Transmission line length55 km
Transmission voltage level33 kV
Generator voltage level11 kV
Transmission circuitDouble circuit

Design a power plant so as to obtain the following parameters: a) Electrical power output taking design discharge as Q25%. b) Select the numbers of units and installed capacity. c) Select the type of turbine. d) Draw the single line diagram showing number of units, generator, power transformer, station transformer and diesel generator for black start. e) Suggest the type of bus bar to be used f) Calculate the rating of the generator circuit breaker (GCB) to be used in your design (Assume suitable data if necessary and necessary graph is attached herewith)

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 500 MVA at the 33 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

a) Electrical power output at Q25%Q_{25\%}

Driest month = May (3.5 m³/s), so riparian release Qr=0.1×3.5=0.35Q_r = 0.1 \times 3.5 = 0.35 m³/s.

Qd=Q25%−Qr=18.24−0.35=17.890 m3/sHn=Hg(1−0.05)=250−12.50=237.50 mPhyd=ρgQdHn=9.81×17.890×237.50=41.681 MWPshaft=ηtPhyd=0.9×41.681=37.513 MWPgen=ηgPshaft=0.97×37.513=36.388 MWPout=ηtrPgen=0.98×36.388=35.660 MW\begin{aligned} Q_d &= Q_{25\%} - Q_r = 18.24 - 0.35 = 17.890\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.05) = 250 - 12.50 = 237.50\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 17.890 \times 237.50 = 41.681\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.9 \times 41.681 = 37.513\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.97 \times 37.513 = 36.388\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.98 \times 36.388 = 35.660\ \text{MW} \end{aligned}

Answer: generator output = 36.388 MW; power delivered to the 33 kV bus = 35.660 MW.

b) Number of units and installed capacity

  • Choose 3 units. A plant of this size would need very large single machines with only two units, which are hard to transport on Nepal's hill roads; three units also let the plant follow the large seasonal change in flow (one or two units in the dry months, all three in the wet months).
  • Loss of one unit (forced outage or maintenance) removes only one third of the output.
  • Per unit: Q=17.890/3=5.963Q = 17.890/3 = 5.963 m³/s, generator output =36.388/3=12.129= 36.388/3 = 12.129 MW → rate each unit at 12.2 MW.
  • Generator rating: S=12.2/0.85=14.35S = 12.2/0.85 = 14.35 MVA → 14.5 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 16 MVA, 11/33 kV, YNd11 (next standard size above 14.5 MVA).

Answer: installed capacity = 3 × 12.2 MW = 36.6 MW.

c) Type of turbine

Hn=237.50H_n = 237.50 m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.

Shaft power per unit P=37.513/3=12504.4P = 37.513/3 = 12504.4 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=932.4H_n^{5/4} = 932.4:

NN (rpm)PolesNsN_s (metric, kW)
10006119.9
750890.0
6001072.0
5001260.0
428.61451.4
3751645.0
333.31840.0

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=333.3N = 333.3 rpm (18 poles): Ns=40.0N_s = 40.0. With 4 jets, Ns,jet=40.0/4=20.0N_{s,jet} = 40.0/\sqrt{4} = 20.0, inside the Pelton range.

Check of jet ratio: jet velocity Vj=0.982gHn=66.9V_j = 0.98\sqrt{2gH_n} = 66.9 m/s; bucket speed u=0.46Vju = 0.46V_j; runner diameter D=60u/(πN)=1.76D = 60u/(\pi N) = 1.76 m; jet diameter d=4(Q/z)/(πVj)=0.168d = \sqrt{4(Q/z)/(\pi V_j)} = 0.168 m; D/d=10.5>10D/d = 10.5 > 10, acceptable.

A Francis at 750 rpm (Ns=90.0N_s = 90.0) is also possible, but the Pelton is preferred because (i) its efficiency stays nearly flat from about 20% to 100% load (jets can be switched off), which suits a run-of-river plant whose flow falls far below the design flow in the dry season, and (ii) it tolerates the heavy sediment of Himalayan rivers better, and worn buckets and needles are easier to repair.

Answer: 3 × vertical-axis 4-jet Pelton turbines, 333.3 rpm, about 12.50 MW each.

d) Single line diagram

 Line-1          Line-2  (33 kV, 55 km)
    |               |
  [CB]            [CB]
    |               |
 ===+===+===========+===========+=== 33 kV bus
        |           |           |
      [CB]        [CB]        [CB]
        |           |           |
      (T1)        (T2)        (T3)
        |           |           |
      [CB]        [CB]        [CB]
        |           |           |
 =======+===[BS]====+===========+=========+=== 11 kV bus
        |           |           |         |
      [GCB]       [GCB]       [GCB]     [CB]
        |           |           |         |
      (G1)        (G2)        (G3)      (ST)
                                          |
 =========================================+===+ 0.4 kV
                                              |
                                            [ACB]
                                              |
                                            (DG) black start
ItemRating
Generators G1–G314.5 MVA, 11 kV, 0.85 pf, 333.3 rpm, Xd′′X''_d = 21%
Step-up transformers T1–T316 MVA each, 11/33 kV, YNd11, XX = 9.15%
Station transformer ST630 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity)
Diesel generator DG400 kVA, 0.4 kV (essential auxiliaries for black start)
Line33 kV, double circuit, 55 km to grid substation
NGRneutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

e) Type of bus bar

  • 11 kV: single bus bar with a bus-section breaker, units split between the two sections, so a bus fault or maintenance takes out only part of the plant.
  • 33 kV: single bus bar, sectionalised, with transformer bays and two line bays (double circuit).

Reason: for a 36.6 MW plant a sectionalised single bus gives reasonable reliability at low cost; a double bus or main-and-transfer bus would cost much more and is normally used only for larger plants or grid substations.

f) Rating of generator circuit breaker (GCB)

Per-unit reactances on 100 MVA base:

xg=0.21×10014.5=1.4483 pu,xt=0.0915×10016=0.5719 puXL=2πfLl=2π×50×0.95×10−3×55=16.415 Ω per circuit; two in parallel=8.207 Ωxl=XL×100332=8.20710.89=0.7537 pu,xgrid=100500=0.2000 puxgrid path=0.2000+0.7537=0.9537 pu\begin{aligned} x_g &= 0.21 \times \frac{100}{14.5} = 1.4483\ \text{pu}, \quad x_t = 0.0915 \times \frac{100}{16} = 0.5719\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.95\times10^{-3} \times 55 = 16.415\ \Omega \text{ per circuit; two in parallel} = 8.207\ \Omega \\ x_l &= \frac{X_L \times 100}{33^2} = \frac{8.207}{10.89} = 0.7537\ \text{pu}, \quad x_{grid} = \frac{100}{500} = 0.2000\ \text{pu} \\ x_{grid\ path} &= 0.2000 + 0.7537 = 0.9537\ \text{pu} \end{aligned}

All generators feed the common 11 kV bus, so the GCB is rated for the full 11 kV bus fault level (generators plus the grid through the step-up transformers):

Sgen=3×1001.4483=207.1 MVASgrid=100xt/3+xgrid path=1000.1906+0.9537=87.4 MVAS11kV=207.1+87.4=294.5 MVA\begin{aligned} S_{gen} &= 3 \times \frac{100}{1.4483} = 207.1\ \text{MVA} \\ S_{grid} &= \frac{100}{x_t/3 + x_{grid\ path}} = \frac{100}{0.1906 + 0.9537} = 87.4\ \text{MVA} \\ S_{11kV} &= 207.1 + 87.4 = 294.5\ \text{MVA} \end{aligned} Isc=294.53×11=15.46 kA,Imake=2.55×15.46=39.42 kA peakIFL=14.53×11=761 A,1.25IFL=951 A\begin{aligned} I_{sc} &= \frac{294.5}{\sqrt{3} \times 11} = 15.46\ \text{kA}, \quad I_{make} = 2.55 \times 15.46 = 39.42\ \text{kA peak} \\ I_{FL} &= \frac{14.5}{\sqrt{3} \times 11} = 761\ \text{A}, \quad 1.25 I_{FL} = 951\ \text{A} \end{aligned}
ParameterRequiredSelected
Rated voltage11 kV system12 kV
Rated normal current≥ 951 A1250 A
Breaking capacity294.5 MVA (15.46 kA)25 kA (520 MVA at 12 kV)
Making capacity39.42 kA peak63 kA peak
Short-time current–25 kA, 3 s
Type–Vacuum (or SF6), generator-duty tested (IEEE C37.013)

Answer: GCB fault level = 294.5 MVA; select a 12 kV, 1250 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.