Design pipes AB and BC, A RL 210 m, 44 and 18 lps

Short answer

Use Hazen-Williams equation with available head. For AB, calculated diameter 150.5 mm, adopt 200 mm. For BC, calculated 95.7 mm, adopt 100 mm. Velocities 1.40 and 2.29 m/s.

In a part of water distribution system, the source is located at a point A with a RL of 210 m, a point B with RL of 154 m is at a distance of 700 m from point A and another point C with RL of 126 m is at a distance of 550 m from point B. Pipe line AB carries a discharge of 44 lps and pipe line BC carries a discharge of 18 lps. Taking minimum residual head as 10 m and Hazen William's coefficient as 100 for pipes, design pipe AB and BC.

C = 100, minimum residual head = 10 m. HGL at A = RL of A = 210 m. A to B: 700 m, 44 lps, RL of B = 154 m. B to C: 550 m, 18 lps, RL of C = 126 m.

Method

Use the Hazen-Williams equation in SI units:

hf=10.67 L Q1.852C1.852D4.87h_f = \frac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}

with QQ in m³/s, LL and DD in m. For each pipe the available head is (HGL at upstream end − ground RL of the tap − required residual head). The gradient S=H/LS = H/L gives the calculated diameter, the next larger commercial size is adopted, and the real head loss and residual head are then checked. Commercial sizes (nominal bore): 15, 20, 25, 32, 40, 50, 65, 80, 100, 125, 150, 200 mm and so on. Constant C = 100.

Pipe AB

  • Discharge Q=44.000Q = 44.000 lps, length L=700L = 700 m
  • HGL at A = 210.00 m; ground RL at B = 154 m; residual head required = 10 m
  • Available head H=210.00−154−10=46.00H = 210.00 - 154 - 10 = 46.00 m
  • Gradient S=H/L=46.00/700=0.06571S = H/L = 46.00/700 = 0.06571
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=150.5D_{calc} = 150.5 mm, adopt commercial size 200 mm
  • Actual hf=11.506h_f = 11.506 m, HGL at B = 198.49 m, residual head = 44.49 m (≥ 10 m, OK)
  • Velocity v=Q/A=1.40v = Q/A = 1.40 m/s

Pipe BC

  • Discharge Q=18.000Q = 18.000 lps, length L=550L = 550 m
  • HGL at B = 198.49 m; ground RL at C = 126 m; residual head required = 10 m
  • Available head H=198.49−126−10=62.49H = 198.49 - 126 - 10 = 62.49 m
  • Gradient S=H/L=62.49/550=0.11363S = H/L = 62.49/550 = 0.11363
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=95.7D_{calc} = 95.7 mm, adopt commercial size 100 mm
  • Actual hf=50.500h_f = 50.500 m, HGL at C = 147.99 m, residual head = 21.99 m (≥ 10 m, OK)
  • Velocity v=Q/A=2.29v = Q/A = 2.29 m/s

Summary

PipeQ (lps)L (m)Calc. D (mm)Adopted D (mm)h_f (m)Residual (m)v (m/s)
AB44700150.520011.5144.491.40
BC1855095.710050.5021.992.29

The head-based size of AB is 150.5 mm, which is slightly above 150 mm, so 200 mm is adopted (other option: 150 mm in part length and 200 mm in the rest). Velocity in BC is 2.29 m/s (< 3 m/s).

Answer: AB = 200 mm and BC = 100 mm.