Design pipes AB and BC, source RL 180 m

Short answer

Use Hazen-Williams equation. For AB, calculated 201.9 mm, adopt 250 mm. For BC, calculated 107.7 mm, adopt 125 mm. Velocities 0.90 and 1.47 m/s.

Design pipeline AB and BC in the pipe network as shown in figure.

[Figure: Source at A, RL = 180 m; A to B: 44 lps, L = 700 m, RL of B = 154 m; B to C: 18 lps, L = 550 m, RL of C = 126 m.] Minimum pressure in pipe line should be 1.5 kg/cm2^2. Take Hazen William's coefficient as 100.

Source A has RL 180 m; minimum pressure 1.5 kg/cm² = 15 m; C = 100. A to B: 44 lps, 700 m, RL of B = 154 m. B to C: 18 lps, 550 m, RL of C = 126 m.

Method

Use the Hazen-Williams equation in SI units:

hf=10.67 L Q1.852C1.852D4.87h_f = \frac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}

with QQ in m³/s, LL and DD in m. For each pipe the available head is (HGL at upstream end − ground RL of the tap − required residual head). The gradient S=H/LS = H/L gives the calculated diameter, the next larger commercial size is adopted, and the real head loss and residual head are then checked. Commercial sizes (nominal bore): 15, 20, 25, 32, 40, 50, 65, 80, 100, 125, 150, 200 mm and so on. Constant C = 100.

Pipe AB

  • Discharge Q=44.000Q = 44.000 lps, length L=700L = 700 m
  • HGL at A = 180.00 m; ground RL at B = 154 m; residual head required = 15 m
  • Available head H=180.00−154−15=11.00H = 180.00 - 154 - 15 = 11.00 m
  • Gradient S=H/L=11.00/700=0.01571S = H/L = 11.00/700 = 0.01571
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=201.9D_{calc} = 201.9 mm, adopt commercial size 250 mm
  • Actual hf=3.881h_f = 3.881 m, HGL at B = 176.12 m, residual head = 22.12 m (≥ 15 m, OK)
  • Velocity v=Q/A=0.90v = Q/A = 0.90 m/s

Pipe BC

  • Discharge Q=18.000Q = 18.000 lps, length L=550L = 550 m
  • HGL at B = 176.12 m; ground RL at C = 126 m; residual head required = 15 m
  • Available head H=176.12−126−15=35.12H = 176.12 - 126 - 15 = 35.12 m
  • Gradient S=H/L=35.12/550=0.06385S = H/L = 35.12/550 = 0.06385
  • From hf=10.67 L Q1.852C1.852D4.87h_f = \dfrac{10.67\,L\,Q^{1.852}}{C^{1.852}D^{4.87}}: Dcalc=107.7D_{calc} = 107.7 mm, adopt commercial size 125 mm
  • Actual hf=17.035h_f = 17.035 m, HGL at C = 159.08 m, residual head = 33.08 m (≥ 15 m, OK)
  • Velocity v=Q/A=1.47v = Q/A = 1.47 m/s

Summary

PipeQ (lps)L (m)Calc. D (mm)Adopted D (mm)h_f (m)Residual (m)v (m/s)
AB44700201.92503.8822.120.90
BC18550107.712517.0333.081.47

The small available head (11 m) for the 700 m pipe AB needs a large pipe. A 250 mm pipe gives a velocity of 0.9 m/s, which is acceptable.

Answer: AB = 250 mm and BC = 125 mm.