Design: 120 m head plant, bus MVA levels

Short answer

Design discharge Q45% minus riparian release = 10.735 m³/s, net head = 114 m. Generator output 10.481 MW, station output 10.271 MW. Two units ×5.3 MW, installed 10.6 MW. Francis turbine. SLD: 2 generators, 2 step‑up transformers, ST, DG; single 66 kV bus, 11 kV bus with section breaker. Busbar type single bus. LV, MV, HV bus MVA and CB ratings from fault calculations.

A typical hydro power plant has the following details.

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
Jan6.13Qmax (Q0)449.46 m³/s
Feb5.10Q25%32.60 m³/s
Mar4.72Q45%11.17 m³/s
Apr6.12Q65%6.23 m³/s
May4.35Q85%4.14 m³/s
Jun21.68Q95%2.92 m³/s
July62.04Qmin0.93 m³/s
Aug73.37
Sep56.55
Oct26.13
Nov12.65
Dec8.24
Turbine typeHead range (m)
Kaplan2 < H < 40
Francis10 < H < 350
Pelton50 < H < 1300
ParameterValue
Gross head120 m
Turbine efficiency90%
Generator efficiency97%
Transformer efficiency98%
Head loss5%
Riparian release10%
Generator sub-transient reactance20%
Transformer reactance15%
Transmission line inductance0.95 mH/km
Transmission line length35 km
Transmission voltage level66 kV
Generator voltage level11 kV
Transmission circuitSingle circuit

Design a power plant so as to obtain the following parameters: a. Electrical power output taking design discharge as Q45% b. Select the numbers of units and installed capacity with suitable reasons c. Draw the single line diagram showing numbers of units, generators, power transformer, station transformer and diesel generator for black start d. Select the type of turbine e. Select the type of busbar with suitable reasons f. Calculate the MVA level of LV bus, MV bus and HV bus g. Calculate the rating of CB to be used in your design. (Assume suitable data if required and the necessary graph is attached herewith)

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 1,000 MVA at the 66 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

a. Electrical power output at Q45%Q_{45\%}

Driest month = May (4.35 m³/s), so riparian release Qr=0.1×4.35=0.435Q_r = 0.1 \times 4.35 = 0.435 m³/s.

Qd=Q45%−Qr=11.17−0.435=10.735 m3/sHn=Hg(1−0.05)=120−6.00=114.00 mPhyd=ρgQdHn=9.81×10.735×114.00=12.005 MWPshaft=ηtPhyd=0.9×12.005=10.805 MWPgen=ηgPshaft=0.97×10.805=10.481 MWPout=ηtrPgen=0.98×10.481=10.271 MW\begin{aligned} Q_d &= Q_{45\%} - Q_r = 11.17 - 0.435 = 10.735\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.05) = 120 - 6.00 = 114.00\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 10.735 \times 114.00 = 12.005\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.9 \times 12.005 = 10.805\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.97 \times 10.805 = 10.481\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.98 \times 10.481 = 10.271\ \text{MW} \end{aligned}

Answer: generator output = 10.481 MW; power delivered to the 66 kV bus = 10.271 MW.

b. Number of units and installed capacity

  • Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
  • One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
  • Per unit: Q=10.735/2=5.367Q = 10.735/2 = 5.367 m³/s, generator output =10.481/2=5.240= 10.481/2 = 5.240 MW → rate each unit at 5.3 MW.
  • Generator rating: S=5.3/0.85=6.24S = 5.3/0.85 = 6.24 MVA → 6.5 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 8 MVA, 11/66 kV, YNd11 (next standard size above 6.5 MVA).

Answer: installed capacity = 2 × 5.3 MW = 10.6 MW.

c. Single line diagram

 Line to grid  (66 kV, 35 km)
    |
  [CB]
    |
 ===+=====+=============+=== 66 kV bus
          |             |
        [CB]          [CB]
          |             |
        (T1)          (T2)
          |             |
        [CB]          [CB]
          |             |
 =========+====[BS]=====+=========+=== 11 kV bus
          |             |         |
        [GCB]         [GCB]     [CB]
          |             |         |
        (G1)          (G2)      (ST)
                                  |
 =================================+===+ 0.4 kV
                                      |
                                    [ACB]
                                      |
                                    (DG) black start
ItemRating
Generators G1–G26.5 MVA, 11 kV, 0.85 pf, 750 rpm, Xd′′X''_d = 20%
Step-up transformers T1–T28 MVA each, 11/66 kV, YNd11, XX = 15%
Station transformer ST160 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity)
Diesel generator DG100 kVA, 0.4 kV (essential auxiliaries for black start)
Line66 kV, single circuit, 35 km to grid substation
NGRneutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

d. Type of turbine

Hn=114.00H_n = 114.00 m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.

Shaft power per unit P=10.805/2=5402.4P = 10.805/2 = 5402.4 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=372.5H_n^{5/4} = 372.5:

NN (rpm)PolesNsN_s (metric, kW)
10006197.3
7508148.0
60010118.4
5001298.7
428.61484.6
3751674.0
333.31865.8

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=750N = 750 rpm (8 poles): Ns=148.0N_s = 148.0, which is in the medium Francis range. A Pelton would need many jets (single-jet NsN_s far above 30), and Kaplan is ruled out because the head is above 40 m.

Answer: 2 × vertical-axis Francis turbines, 750 rpm, about 5.40 MW each.

e. Type of bus bar

  • 11 kV: single bus bar with a bus-section breaker, units split between the two sections, so a bus fault or maintenance takes out only part of the plant.
  • 66 kV: single bus bar, sectionalised, with transformer bays and one line bay.

Reason: for a 10.6 MW plant a sectionalised single bus gives reasonable reliability at low cost; a double bus or main-and-transfer bus would cost much more and is normally used only for larger plants or grid substations.

f. MVA level of LV, MV and HV buses

LV = 0.4 kV auxiliary bus, MV = 11 kV generator bus, HV = 66 kV switchyard bus. Station transformer 160 kVA, 4.5%.

Per-unit reactances on 100 MVA base:

xg=0.2×1006.5=3.0769 pu,xt=0.15×1008=1.8750 puXL=2πfLl=2π×50×0.95×10−3×35=10.446 Ωxl=XL×100662=10.44643.56=0.2398 pu,xgrid=1001000=0.1000 puxgrid path=0.1000+0.2398=0.3398 pu\begin{aligned} x_g &= 0.2 \times \frac{100}{6.5} = 3.0769\ \text{pu}, \quad x_t = 0.15 \times \frac{100}{8} = 1.8750\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.95\times10^{-3} \times 35 = 10.446\ \Omega \\ x_l &= \frac{X_L \times 100}{66^2} = \frac{10.446}{43.56} = 0.2398\ \text{pu}, \quad x_{grid} = \frac{100}{1000} = 0.1000\ \text{pu} \\ x_{grid\ path} &= 0.1000 + 0.2398 = 0.3398\ \text{pu} \end{aligned} xst=0.045×1000.16=28.125 puSMV=2×100xg+100xt/2+xgrid path=65.0+78.3=143.3 MVASHV=100xg/2+xt/2+100xgrid path=40.4+294.3=334.7 MVAXMV=100143.3=0.6979 pu,SLV=1000.6979+28.125=3.47 MVA\begin{aligned} x_{st} &= 0.045 \times \frac{100}{0.16} = 28.125\ \text{pu} \\ S_{MV} &= 2 \times \frac{100}{x_g} + \frac{100}{x_t/2 + x_{grid\ path}} = 65.0 + 78.3 = 143.3\ \text{MVA} \\ S_{HV} &= \frac{100}{x_g/2 + x_t/2} + \frac{100}{x_{grid\ path}} = 40.4 + 294.3 = 334.7\ \text{MVA} \\ X_{MV} &= \frac{100}{143.3} = 0.6979\ \text{pu}, \quad S_{LV} = \frac{100}{0.6979 + 28.125} = 3.47\ \text{MVA} \end{aligned}
BusFault MVAIscI_{sc} (kA)
LV (0.4 kV)3.475.01
MV (11 kV)143.37.52
HV (66 kV)334.72.93

Answer: LV ≈ 3.47 MVA, MV ≈ 143.3 MVA, HV ≈ 334.7 MVA.

g. Rating of circuit breakers

Breaking current from the bus fault levels above; making current = 2.55 × IscI_{sc} (IEC 62271-100); rated current ≥ 1.25 × full-load current.

BreakerFull-load currentRequired breakingSelected
GCB / 11 kV CBs341 A per generator143.3 MVA, 7.52 kA (make 19.2 kA)12 kV, 630 A, 25 kA VCB
HV CB (66 kV)140 A total334.7 MVA, 2.93 kA (make 7.5 kA)72.5 kV, 630 A, 25 kA SF6
LV ACB (0.4 kV)231 A (station tr.)3.47 MVA, 5.01 kA (make 7.5 kA*)415 V, 400 A, 25 kA ACB

*At 0.4 kV the making current uses the IEC 60947-2 factor n = 1.5 for this fault current.

Answer: 11 kV GCB: 12 kV, 630 A, 25 kA; 66 kV CB: 72.5 kV, 630 A, 25 kA; 0.4 kV ACB: 400 A, 25 kA.

✓ Answer checked by Claude Opus 5.5 (high effort)