Design: 220 m head plant, optimal voltage

Short answer

Design discharge Q45% minus riparian release is 6.557 m³/s, net head 209 m. Generator output 11.737 MW. Two 5.9 MW units, 7 MVA, 11 kV. Optimal transmission voltage 66 kV, single circuit. Turbine: 4-jet Pelton at 375 rpm. Unit scheme.

A typical hydro power plant has the following details.

MonthDischarge (m³/s)Flow durationDischarge (m³/s)
Jan4.68533Qmax (Q0)207.0024 m³/s
Feb3.867942Q25%18.2424 m³/s
Mar3.584017Q45%6.87999 m³/s
Apr4.553517Q65%4.706992 m³/s
May3.22678Q85%3.106132 m³/s
Jun12.77418Q95%2.17348 m³/s
July32.95867Qmin0.648732 m³/s
Aug40.26243
Sept31.23782
Oct15.05586
Nov7.380238
Dec4.858522
ParameterValue
Gross head220 m
Turbine efficiency90%
Generator efficiency97%
Transformer efficiency98%
Head loss5.00%
Riparian release10%
Generator sub-transient reactance21%
Transformer reactance9%
Transmission line inductance0.95 mH/km
Transmission line length25 km
Generator voltage level11 kV
Transmission voltage level and no. of circuitsUse optimal one

Design a hydro power plant so as to obtain the following parameters. a) Installed capacity taking design discharge as Q45%. [2] b) Select the number of unit and turbine type. [3] c) Select the type of turbine. [3] d) Draw the single line diagram showing number of units, generator, power transformer and station transformer. [4] e) Calculate the rating of generator circuit breaker to be used in your design. [4]

Assumptions: riparian release = 10% of the driest monthly mean flow; net head = gross head minus 5% loss; ρg=9.81\rho g = 9.81 kN/m³; generator power factor 0.85; base = 100 MVA. For fault levels the grid is taken as a source of 1,000 MVA at the 66 kV grid substation at the far end of the line (an assumed typical value, since grid data is not given).

Optimal transmission voltage and number of circuits

Use Still's formula for the economical voltage (L in km, P in kW):

V=5.5L1.6+P100=5.5251.6+11800100=63.6 kV\begin{aligned} V &= 5.5\sqrt{\frac{L}{1.6} + \frac{P}{100}} = 5.5\sqrt{\frac{25}{1.6} + \frac{11800}{100}} = 63.6\ \text{kV} \end{aligned}

The nearest standard voltage is 66 kV. Line current at 66 kV: I=11.8/0.853×66=121I = \dfrac{11.8/0.85}{\sqrt3 \times 66} = 121 A, which a single ACSR Dog or Wolf circuit carries easily. Choose 66 kV, single circuit: an 11.8 MW plant does not justify the extra cost of a second circuit, and 33 kV would give high losses and voltage drop over 25 km.

a) Installed capacity at Q45%Q_{45\%}

Driest month = May (3.22678 m³/s), so riparian release Qr=0.1×3.22678=0.3227Q_r = 0.1 \times 3.22678 = 0.3227 m³/s.

Qd=Q45%−Qr=6.87999−0.3227=6.557 m3/sHn=Hg(1−0.05)=220−11.00=209.00 mPhyd=ρgQdHn=9.81×6.557×209.00=13.444 MWPshaft=ηtPhyd=0.9×13.444=12.100 MWPgen=ηgPshaft=0.97×12.100=11.737 MWPout=ηtrPgen=0.98×11.737=11.502 MW\begin{aligned} Q_d &= Q_{45\%} - Q_r = 6.87999 - 0.3227 = 6.557\ \text{m}^3/\text{s} \\ H_n &= H_g(1 - 0.05) = 220 - 11.00 = 209.00\ \text{m} \\ P_{hyd} &= \rho g Q_d H_n = 9.81 \times 6.557 \times 209.00 = 13.444\ \text{MW} \\ P_{shaft} &= \eta_t P_{hyd} = 0.9 \times 13.444 = 12.100\ \text{MW} \\ P_{gen} &= \eta_g P_{shaft} = 0.97 \times 12.100 = 11.737\ \text{MW} \\ P_{out} &= \eta_{tr} P_{gen} = 0.98 \times 11.737 = 11.502\ \text{MW} \end{aligned}

Answer: generator output = 11.737 MW; power delivered to the 66 kV bus = 11.502 MW.

b) Number of units (turbine type in part c)

  • Choose 2 units. With a run-of-river flow that falls well below the design flow in the dry months, one unit can run near full load on half the design flow, so efficiency stays high in winter.
  • One unit can be maintained while the other runs, and two units keep the number of machines (and cost) low for a plant of this size.
  • Per unit: Q=6.557/2=3.279Q = 6.557/2 = 3.279 m³/s, generator output =11.737/2=5.868= 11.737/2 = 5.868 MW → rate each unit at 5.9 MW.
  • Generator rating: S=5.9/0.85=6.94S = 5.9/0.85 = 6.94 MVA → 7 MVA, 11 kV, 0.85 pf, 50 Hz.
  • Step-up transformer, one per unit: 8 MVA, 11/66 kV, YNd11 (next standard size above 7 MVA).

Answer: installed capacity = 2 × 5.9 MW = 11.8 MW.

c) Type of turbine

Hn=209.00H_n = 209.00 m lies in the Francis (10–350 m) and Pelton (50–1300 m) ranges, so the specific speed decides.

Shaft power per unit P=12.100/2=6050.0P = 12.100/2 = 6050.0 kW. With N=120f/pN = 120f/p (synchronous speeds) and Ns=NP/Hn5/4N_s = N\sqrt{P}/H_n^{5/4}, where Hn5/4=794.7H_n^{5/4} = 794.7:

NN (rpm)PolesNsN_s (metric, kW)
1000697.9
750873.4
6001058.7
5001248.9
428.61442.0
3751636.7
333.31832.6

Usual ranges: Pelton about 10–30 per jet (multi-jet Ns=Ns,jetzN_s = N_{s,jet}\sqrt{z}), Francis about 60–300, Kaplan 300–1000.

Choose N=375N = 375 rpm (16 poles): Ns=36.7N_s = 36.7. With 4 jets, Ns,jet=36.7/4=18.4N_{s,jet} = 36.7/\sqrt{4} = 18.4, inside the Pelton range.

Check of jet ratio: jet velocity Vj=0.982gHn=62.8V_j = 0.98\sqrt{2gH_n} = 62.8 m/s; bucket speed u=0.46Vju = 0.46V_j; runner diameter D=60u/(πN)=1.47D = 60u/(\pi N) = 1.47 m; jet diameter d=4(Q/z)/(πVj)=0.129d = \sqrt{4(Q/z)/(\pi V_j)} = 0.129 m; D/d=11.4>10D/d = 11.4 > 10, acceptable.

A Francis at 1000 rpm (Ns=97.9N_s = 97.9) is also possible, but the Pelton is preferred because (i) its efficiency stays nearly flat from about 20% to 100% load (jets can be switched off), which suits a run-of-river plant whose flow falls far below the design flow in the dry season, and (ii) it tolerates the heavy sediment of Himalayan rivers better, and worn buckets and needles are easier to repair.

Answer: 2 × vertical-axis 4-jet Pelton turbines, 375 rpm, about 6.05 MW each.

d) Single line diagram

 Line to grid  (66 kV, 25 km)
    |
  [CB]
    |
 ===+=====+=============+=== 66 kV bus
          |             |
        [CB]          [CB]
          |             |
        (T1)          (T2)
          |             |
        [CB]          [CB]
          |             |
 =========+====[BS]=====+=========+=== 11 kV bus
          |             |         |
        [GCB]         [GCB]     [CB]
          |             |         |
        (G1)          (G2)      (ST)
                                  |
 =================================+===+ 0.4 kV
                                      |
                                    [ACB]
                                      |
                                    (DG) black start
ItemRating
Generators G1–G27 MVA, 11 kV, 0.85 pf, 375 rpm, Xd′′X''_d = 21%
Step-up transformers T1–T28 MVA each, 11/66 kV, YNd11, XX = 9%
Station transformer ST200 kVA, 11/0.4 kV, Dyn11, 4.5% (aux load about 1.5% of capacity)
Diesel generator DG125 kVA, 0.4 kV (essential auxiliaries for black start)
Line66 kV, single circuit, 25 km to grid substation
NGRneutral grounding resistor (low-resistance earthing, one generator earthed at a time if preferred)

BS = bus section breaker, GCB = generator circuit breaker, ACB = air circuit breaker. Black start: with the grid dead, the DG energises the 0.4 kV auxiliary bus (governor oil pumps, cooling water, excitation field flashing, lighting and battery chargers), one unit is started and runs in island mode, and it then energises the step-up transformer and the line.

e) Rating of generator circuit breaker

Per-unit reactances on 100 MVA base:

xg=0.21×1007=3.0000 pu,xt=0.09×1008=1.1250 puXL=2πfLl=2π×50×0.95×10−3×25=7.461 Ωxl=XL×100662=7.46143.56=0.1713 pu,xgrid=1001000=0.1000 puxgrid path=0.1000+0.1713=0.2713 pu\begin{aligned} x_g &= 0.21 \times \frac{100}{7} = 3.0000\ \text{pu}, \quad x_t = 0.09 \times \frac{100}{8} = 1.1250\ \text{pu} \\ X_L &= 2\pi f L l = 2\pi \times 50 \times 0.95\times10^{-3} \times 25 = 7.461\ \Omega \\ x_l &= \frac{X_L \times 100}{66^2} = \frac{7.461}{43.56} = 0.1713\ \text{pu}, \quad x_{grid} = \frac{100}{1000} = 0.1000\ \text{pu} \\ x_{grid\ path} &= 0.1000 + 0.1713 = 0.2713\ \text{pu} \end{aligned}

All generators feed the common 11 kV bus, so the GCB is rated for the full 11 kV bus fault level (generators plus the grid through the step-up transformers):

Sgen=2×1003.0000=66.7 MVASgrid=100xt/2+xgrid path=1000.5625+0.2713=119.9 MVAS11kV=66.7+119.9=186.6 MVA\begin{aligned} S_{gen} &= 2 \times \frac{100}{3.0000} = 66.7\ \text{MVA} \\ S_{grid} &= \frac{100}{x_t/2 + x_{grid\ path}} = \frac{100}{0.5625 + 0.2713} = 119.9\ \text{MVA} \\ S_{11kV} &= 66.7 + 119.9 = 186.6\ \text{MVA} \end{aligned} Isc=186.63×11=9.79 kA,Imake=2.55×9.79=24.97 kA peakIFL=73×11=367 A,1.25IFL=459 A\begin{aligned} I_{sc} &= \frac{186.6}{\sqrt{3} \times 11} = 9.79\ \text{kA}, \quad I_{make} = 2.55 \times 9.79 = 24.97\ \text{kA peak} \\ I_{FL} &= \frac{7}{\sqrt{3} \times 11} = 367\ \text{A}, \quad 1.25 I_{FL} = 459\ \text{A} \end{aligned}
ParameterRequiredSelected
Rated voltage11 kV system12 kV
Rated normal current≥ 459 A630 A
Breaking capacity186.6 MVA (9.79 kA)25 kA (520 MVA at 12 kV)
Making capacity24.97 kA peak63 kA peak
Short-time current–25 kA, 3 s
Type–Vacuum (or SF6), generator-duty tested (IEEE C37.013)

Answer: GCB fault level = 186.6 MVA; select a 12 kV, 630 A, 25 kA generator circuit breaker. The margin covers the DC component and delayed current zeros of generator faults; surge arresters and surge capacitors are fitted at the generator terminals when a VCB is used.

✓ Answer checked by Claude Opus 5.5 (high effort)