- 2069 Chaitra · 8 marks
Flow duration curve; firm and secondary energy
Short answer
With head 60 m, design discharge 45 m³/s, and 82% efficiency, firm energy is 67.6 GWh, secondary energy is 80.3 GWh, and total annual energy is about 148.0 GWh.
The stream flow record for a hydropower development site is given below. Draw a flow duration curve and determine firm and secondary energy if the available head is 60 m, design discharge capacity is 45 m³/s and overall efficiency is 82%.
| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 30 | 38 | 28 | 22 | 16 | 32 | 56 | 72 | 54 | 46 | 38 | 36 |
Flow duration curve
Rank the monthly flows in descending order and take with .
| Rank | Q (m³/s) | Exceedance (%) | Q used = min(Q, 45) |
|---|---|---|---|
| 1 | 72 | 7.7 | 45 |
| 2 | 56 | 15.4 | 45 |
| 3 | 54 | 23.1 | 45 |
| 4 | 46 | 30.8 | 45 |
| 5 | 38 | 38.5 | 38 |
| 6 | 38 | 46.2 | 38 |
| 7 | 36 | 53.8 | 36 |
| 8 | 32 | 61.5 | 32 |
| 9 | 30 | 69.2 | 30 |
| 10 | 28 | 76.9 | 28 |
| 11 | 22 | 84.6 | 22 |
| 12 | 16 | 92.3 | 16 |
Q (m³/s)
72 |*
56 | *
45 |-+--*-*----- design flow
38 | * *
30 | * *
22 | *
16 | *
+----------------------
0 20 40 60 80 100 %
The FDC is flat at 45 m³/s for about 31% of the time (months with flow above the design flow).
Energy
Constants: m, , m³/s, 730 h per month.
- Installed capacity kW MW
- Firm energy is based on the flow available all the time (minimum flow 16 m³/s):
- Total energy with : sum of used flows = 420 m³/s-months, so mean used flow = 35 m³/s
- Secondary energy GWh
Answer: firm energy ≈ 67.6 GWh; secondary energy ≈ 80.3 GWh; total ≈ 148.0 GWh per year.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Flow duration curve and power at mean flow · Hydropower Engineering, chapter 3
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- Load duration curve; diesel plant; ROR flow duration · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Power duration curve and primary/secondary energy · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Primary and secondary energy at 45% exceedance · Hydro Power, chapter 3
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×