Francis design (90 m, 40 m³/s, 86%)

Short answer

Power is 30.4 MW; specific speed about 126, synchronous speed 200 rpm, runner diameter about 2.81 m; setting height is at most about 3.9 m above tailwater.

A proposed hydropower development having a net head of 90 m and design discharge of 40 m³/s uses a Francis turbine. Taking turbine efficiency 0.86, calculate specific speed, turbine diameter and setting of the turbine.

Step 1: Power and units

P=ηγQH=0.86×9.81×40×90=30,372 kWP = \eta\gamma Q H = 0.86 \times 9.81 \times 40 \times 90 = 30{,}372\ \text{kW}

One unit is adopted (Pu=30,372P_u = 30{,}372 kW).

Step 2: Specific speed and rated speed

For Francis turbines (metric units, kW, m, rpm) the empirical relation of Schweiger and Gregory is

Ns=3763H0.854+49.4=130.1N_s = \frac{3763}{H^{0.854}} + 49.4 = 130.1 N=NsH5/4Pu=206.9 rpmN = \frac{N_s H^{5/4}}{\sqrt{P_u}} = 206.9\ \text{rpm}

Synchronous speed at 50 Hz: N=6000/pN = 6000/p. Adopt p=30p = 30 poles, N=200N = 200 rpm. Actual specific speed:

Ns=NPuH5/4=125.7N_s = \frac{N\sqrt{P_u}}{H^{5/4}} = 125.7

Step 3: Runner diameter

Peripheral speed u=Ku2gHu = K_u\sqrt{2gH} with Ku=0.7K_u = 0.7 (range 0.6 to 0.9):

u=0.72×9.81×90=29.41 m/s,D=60uπN=60×29.41π×200=2.81 mu = 0.7\sqrt{2 \times 9.81 \times 90} = 29.41\ \text{m/s}, \qquad D = \frac{60u}{\pi N} = \frac{60 \times 29.41}{\pi \times 200} = 2.81\ \text{m}

Step 4: Setting (Thoma cavitation coefficient)

σc=0.0432(Ns100)2=0.0683\sigma_c = 0.0432\left(\frac{N_s}{100}\right)^2 = 0.0683

Sea-level site assumed: Hatm=10.3H_{atm} = 10.3 m, Hv=0.24H_v = 0.24 m.

Hs=Hatm−Hv−σcH=10.3−0.24−0.0683×90=3.91 mH_s = H_{atm} - H_v - \sigma_c H = 10.3 - 0.24 - 0.0683 \times 90 = 3.91\ \text{m}

This is the highest permissible level of the runner outlet above tailwater; in practice set lower (safety margin 1 to 2 m, and reduce HatmH_{atm} by about 1 m per 900 m of site elevation).

Answer: P=30.4P = 30.4 MW; specific speed Ns≈126N_s \approx 126 (design value 130); N=200N = 200 rpm; runner diameter D≈2.81D \approx 2.81 m; setting Hs≤3.9H_s \le 3.9 m above tailwater level.