- 2074 Ashwin · 6 marks
Francis design (90 m, 60 m³/s, 94%)
Short answer
Use 2 units of 24.9 MW; specific speed about 131, speed 230.8 rpm, runner diameter about 2.43 m; setting height is at most about 3.35 m above tailwater.
A hydropower plant has a design discharge of 60 m³/s and net head of 90 m. Design a Francis turbine for this power plant (number of turbines, specific speed, diameter and setting of turbine). Take turbine efficiency 94%.
Step 1: Power and units
Number of units: a single 50 MW unit would need a large runner (3.6 m) and shaft. Adopt 2 units, each m³/s and kW (gives easier transport, maintenance and part-load operation).
Step 2: Specific speed and rated speed
For Francis turbines (metric units, kW, m, rpm) the empirical relation of Schweiger and Gregory is
Synchronous speed at 50 Hz: . Adopt poles, rpm. Actual specific speed:
Step 3: Runner diameter
Peripheral speed with (range 0.6 to 0.9):
Step 4: Setting (Thoma cavitation coefficient)
Sea-level site assumed: m, m.
This is the highest permissible level of the runner outlet above tailwater; in practice set lower (safety margin 1 to 2 m, and reduce by about 1 m per 900 m of site elevation).
Answer: 2 units of 24.9 MW; ; rpm; m; setting m above tailwater level.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Number and runner diameter of turbines (20 m head) · Hydropower Engineering, chapter 7
- Francis design (90 m, 40 m³/s, 86%) · Hydropower Engineering, chapter 7
- Francis runner design (40 m head, 10 m³/s) · Hydropower Engineering, chapter 7
- Pumped storage plant: power, turbine, setting, surge · Hydropower Engineering, chapter 7
- Francis diameter and setting (110 m, 140 m³/s) · Hydropower Engineering, chapter 7
- Number of Francis/Kaplan units (300 m³/s, 30 m) · Hydropower Engineering, chapter 7
- Design: 300 m head plant, GCB rating · Power Plant Design, chapter 4 · asked 11×
- Design: 230 m head plant, 55 km line · Power Plant Design, chapter 4 · asked 12×
- Design: 310 m head plant, HV breaker · Power Plant Design, chapter 4 · asked 3×
- Head, specific speed and part load in turbine choice · Power Plant Design, chapter 3