- 2075 Ashwin · 6 marks
RoR installed capacity without pondage and with peaking
Short answer
For pure run-of-river, installed capacity = 17.51 MW. With pondage and 6 h peaking using two units, peak discharge is 47.63 m³/s, giving installed capacity = 27.80 MW.
A RoR plant has a minimum flow of 30 m³/s and net head of 70 m. The overall efficiency of the plant is 85%. Calculate the installed capacity of the plant (i) without pondage (designed for pure RoR plant) and (ii) if the plant is designed for a peaking plant with 6 hours peaking. The plant has two sets of units such that one unit at full capacity is operating during off-peak hours. Total evaporation and other losses is 5% of the stored water.
(i) Pure RoR plant (no pondage)
Only the minimum flow can be used continuously:
(ii) Peaking plant, 6 h peak, two units
Let be the discharge of one unit at full load. Off-peak (18 h) only one unit runs, using . In peak hours (6 h) both units run, using .
Water stored in the 18 off-peak hours (inflow 30 m³/s) after 5% loss:
During the 6 peak hours the extra flow required is , supplied from storage:
Peak discharge m³/s.
Check: off-peak, one unit uses 23.81 m³/s (less than 30), so the surplus goes to the pond. Water put into the pond m³ (the pondage capacity, about 4.01 × 10⁵ m³). After the 5% loss, m³ is usable, which equals the peak draw m³.
Answer: (i) installed capacity = 17.51 MW (pure RoR); (ii) installed capacity = 27.80 MW with 6-hour peaking (2 units of 13.90 MW each), a gain of 1.59 times.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- RoR capacity, peaking capacity and benefit · Hydropower Engineering, chapter 3
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- RoR best installed capacity (NRs, 45 years) · Hydropower Engineering, chapter 3
- RoR best installed capacity (USD 2795 million) · Hydropower Engineering, chapter 3
- Design: 300 m head plant, GCB rating · Power Plant Design, chapter 4 · asked 11×
- Design: 280 m head plant, 66 kV · Power Plant Design, chapter 4 · asked 12×
- Daily pondage ROR with 150 m head · Power Plant Design, chapter 3
- Design: 230 m head plant, 55 km line · Power Plant Design, chapter 4 · asked 12×