- 2078 Chaitra · 8 marks
Daily pondage ROR with 150 m head
Short answer
For 150 m head and 10 m³/s per unit, shaft power is about 13.2 MW (Ns≈132), suited for Francis turbine. Components: diversion weir, intake, gravel trap, desander, daily pondage (~90,000 m³ storage), headrace tunnel, surge tank, penstock, butterfly valve, Francis turbine-generator, tailrace, switchyard.
Discuss major components of a Daily Pondage Run off the River type hydropower project with tentative head 150 m and discharge 10 m³/s per unit. Illustrate with suitable schematic diagram.
For a head of about 150 m and 10 m³/s per unit, the unit output is roughly
and the specific speed at 600 rpm is , which lies well inside the Francis range (60–300). So the project is a medium-head daily pondage run-of-river (PROR) scheme with vertical Francis units of roughly 12–13 MW each.
Schematic
River ==|== Diversion weir + gated spillway
|
Intake (trash rack, gates)
|
Gravel trap -> Desander (2 or more bays)
|
[ DAILY PONDAGE ] -- spillway/flushing
|
Headrace tunnel (pressurised)
|
Surge tank
|
Penstock (steel, ~150 m head)
|
Butterfly valve
|
Francis turbine + Generator (~13 MW)
| |
Draft tube Unit transformer
| |
Tailrace -> River Switchyard -> Grid
Major components
- Diversion weir and spillway: raise water level and pass monsoon floods; undersluice keeps the intake free of sediment.
- Intake: sized for total design discharge (10 m³/s × number of units) plus flushing water; trash rack and gates.
- Gravel trap and desander: remove particles larger than about 0.2 mm, as sediment at 150 m head quickly erodes Francis runners and guide vanes.
- Daily pondage: stores off-peak inflow; for example, to run a 10 m³/s unit for 5 peak hours when the dry-season inflow is only 5 m³/s, storage m³ is needed.
- Headrace tunnel: carries water under low pressure to the surge tank.
- Surge tank: absorbs water hammer when governor closes the wicket gates and supplies water on load increase.
- Penstock: about 150 m static head plus water hammer allowance (typically 20–30%), with anchor blocks and expansion joints.
- Main inlet valve: butterfly valve, suitable for medium head.
- Francis turbine: spiral casing, stay vanes, wicket gates, runner and draft tube; vertical shaft; runner set below tailwater as required by cavitation.
- Generator: vertical synchronous generator at 11 kV, e.g. about 15 MVA at 0.85 pf, with excitation system and governor.
- Tailrace: returns water to the river below the powerhouse.
- Electrical system: unit step-up transformer (11/132 kV), switchyard, station supply and diesel generator for black start.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Daily pondage run-of-river components · Power Plant Design, chapter 3
- Components of a run-of-river plant · Power Plant Design, chapter 3 · asked 2×
- High dam hydropower project components · Power Plant Design, chapter 3
- ROR versus PROR hydropower plants · Power Plant Design, chapter 3
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×
- RoR pondage: capacity and pondage volume · Hydropower Engineering, chapter 3
- RoR installed capacity without pondage and with peaking · Hydropower Engineering, chapter 3
- RoR and PRoR from hydrograph equation (Q40) · Hydropower Engineering, chapter 3
- Major advantages of per unit system · Power System Analysis I, chapter 3