- 2079 Bhadra · 8+2 marks
Double-stub shunt tuner for admittance load
Short answer
Normalize the load admittance to yL=0.4065+j0.325; use short stubs, first 0.01λ from the load, spacing 3λ/8. Solution A gives l1=0.0678λ and l2=0.0524λ. The matched network has S11=S22=0, |S21|=1; tuner S-parameters: S11=0.469∠106.4°, S21=S12=0.883∠−15.9°, S22=0.469∠41.7°.
A 50 Ω lossless transmission line is required to be matched with the load admittance 0.00813 + j0.0065 ℧, by a double-stub shunt tuner with separation of 3λ/8 and the distance of the first stub from the load is 0.01λ. Calculate the length of each stub by using the smith chart. Write the s-parameter for the matched network.
Given: Z0 = 50 Ω (Y0 = 0.02 ℧), YL = 0.00813 + j0.0065 ℧, spacing 3λ/8, first stub 0.01λ from the load. Short-circuited stubs are assumed (the usual choice; open-stub lengths are λ/4 different).
Step 1: Normalise and convert to admittance
yL = YL·Z0 = (0.00813 + j0.0065)×50 = 0.4065 + j0.325
zL = 1.501 − j1.200
yL = 1/zL = 0.406 + j0.325
ΓL = 0.469∠-41.7°, VSWR = 2.765
On the chart, zL is at 0.3079λ WTG and yL is diametrically opposite, at 0.0579λ WTG.
Step 2: Move to the first stub (0.01λ from the load)
Rotate yL clockwise (toward the generator) on its VSWR circle:
y1 = 0.425 + j0.385 (0.0679λ WTG)
Step 3: Forbidden-region check and rotated g = 1 circle
βd = 360° × 0.375 = 135°
g must be ≤ 1/sin²βd = 2.000
g1 = 0.4250 → matchable
Rotate the g = 1 circle by 0.375λ (270° on the chart) toward the load. The point just after stub 1 must lie on this rotated circle, so move from y1 along the constant g = 0.425 circle until it meets the rotated circle.
Step 4: Susceptance of stub 1
Analytically (Pozar), with t = tan βd:
t = tan 135° = −1.0000
b1 = −B + [1 ± √((1+t²)g − g²t²)]/t
(1+t²)g − g²t² = 0.6694, √ = 0.8182
Sol A: b1 = −2.2031
Sol B: b1 = −0.5667
Step 5: Move 0.375λ to stub 2 and find b2
Sol A: y after stub 1 = 0.425 − j1.818
(0.3273λ) → after 0.375λ: y2 = 1.000 + j2.925
b2 = −2.9250
Sol B: y after stub 1 = 0.425 − j0.182
(0.4655λ) → after 0.375λ: y2 = 1.000 − j0.925
b2 = +0.9250
Both y2 values lie on the g = 1 circle, as required.
Step 6: Stub lengths
- For a short-circuited stub: y = −j cot βl, so l = (1/2π)·cot⁻¹(−b); measure from the short-circuit point (y = ∞, right end of the chart) toward the generator.
Sol A short: l1 = 0.0678λ, l2 = 0.0524λ
Sol B short: l1 = 0.1679λ, l2 = 0.3688λ
| Quantity | Solution A | Solution B |
|---|---|---|
| Stub 1 from load | 0.01λ | 0.01λ |
| Stub spacing | 0.375λ | 0.375λ |
| b1, b2 | -2.203, -2.925 | -0.567, 0.925 |
| Short l1, l2 | 0.0678λ, 0.0524λ | 0.1679λ, 0.3688λ |
Answer (Smith chart values agree within reading accuracy): solution A, with l1 = 0.0678λ and l2 = 0.0524λ (shortest). Solution B: l1 = 0.1679λ, l2 = 0.3688λ.
Z0=50Ω 3λ/8 0.01λ
o------+---------------+--------[YL]
| |
stub 2 stub 1
l2=0.0524λ l1=0.0678λ
SC SC
S-parameters of the matched network
Treat the tuner (stub 2, line 0.375λ, stub 1, line 0.01λ) as a two-port with both ports referenced to Z0. Port 1 faces the generator, and port 2 faces the load. The S-parameters come from the cascaded normalised ABCD matrix [1 0; jb2 1]·[cos βd j sin βd; j sin βd cos βd]·[1 0; jb1 1] ·[line d1], with S11 = (A + B − C − D)/Δ, S21 = 2/Δ, S22 = (−A + B − C + D)/Δ, Δ = A + B + C + D.
Before matching:
S11 = ΓL = 0.469∠-41.7°, VSWR = 2.76
Tuner, solution A:
S11 = 0.469∠106.4° S12 = 0.883∠-15.9°
S21 = 0.883∠-15.9° S22 = 0.469∠41.7°
S12 = S21 (reciprocal), |S11|²+|S21|² = 1 (lossless)
S22 = ΓL* (conjugate match)
After matching (tuner + load):
Γin = S11 + S12S21ΓL/(1 − S22ΓL) = 0, VSWR = 1
Referred to the load (port 2 normalised to ZL), the perfectly matched network is S = [0 e^(−jφ); e^(−jφ) 0]. S11 = S22 = 0, and |S21| = 1, so all power reaches the load.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Double-stub tuner for 75+j75 Ω on 50 Ω line · RF and Microwave Engineering, chapter 2 · asked 2×
- Double-stub with assumed load on 50 Ω line · RF and Microwave Engineering, chapter 2
- Double-stub on 75 Ω coax, load 0.4+j0.85 · RF and Microwave Engineering, chapter 2
- Admittance chart and single stub for 80+j100 Ω · RF and Microwave Engineering, chapter 2
- Smith chart analysis of 75+j100 Ω load · RF and Microwave Engineering, chapter 2
- Double-stub for inductive antenna load on 78 Ω line · RF and Microwave Engineering, chapter 2
- Smith chart, load 80+j100 on 50 Ω line · Electromagnetism, chapter 5
- Smith chart, load 100+j150 on 75 Ω line · Electromagnetism, chapter 5
- Line with 50+j50 load, first maximum, power · Electromagnetism, chapter 5
- G-S load flow, j0.12 lines, losses · Power System Analysis II, chapter 2 · asked 2×