Pavement layer functions and rigid pavement joints

Short answer

Pavement layers spread load: surface resists wear and water, binder distributes load, base is main load-bearing layer, sub-base drains and filters, subgrade carries all load. Rigid pavement joints are contraction, expansion, construction, longitudinal, and warping joints, each controlling cracking and slab movement.

Describe the functions of pavement layers. What are the different types of joints used in the rigid pavement? Explain in brief.

Functions of pavement layers

A flexible pavement is a layered system; the load spreads downwards so that the stress on each layer reduces with depth.

LayerMain functions
Surface (wearing) courseResists tyre wear and abrasion, gives a smooth, skid-resistant and waterproof riding surface, protects the layers below from water, takes the high compressive and shear stresses of the wheel
Binder course (DBM/BM)Spreads load to the base, gives a stiff bituminous layer for fatigue strength, bonds the wearing course to the base
Base course (WBM/WMM/CTB)Main load-bearing layer, distributes load to the sub-base, provides drainage of the pavement and structural strength against shear
Sub-base (GSB)Improves the support to the base, works as a drainage and filter layer, prevents intrusion of subgrade soil and capillary rise, saves costly base thickness
Subgrade (compacted soil)The natural or improved soil (top 500 mm) that finally carries all the load, so it must be compacted to at least 97 percent of Proctor density

The thickness of each layer is fixed so that the stress reaching the layer below is within its capacity.

Joints in rigid pavement

Joints are provided in a cement concrete slab to control cracking from temperature change, shrinkage and warping, and to allow construction in stages.

  1. Contraction joint (transverse) - a weakened plane (sawn groove 1/4 to 1/3 of the slab depth) that lets the slab shrink on cooling and creates a controlled crack. Dowels are provided. Spacing is usually 4.5 m (IRC:58), up to 5 m for unreinforced slabs.
  2. Expansion joint - a full-depth gap (20-25 mm) filled with compressible filler (bitumen-impregnated fibre board or cork) and sealant, provided at bridges, culverts, intersections and wherever the slab meets a structure, so that the slab can expand freely. Smooth dowel bars with a cap on one end carry the load. IRC:58 permits omitting them in long slab runs.
  3. Construction joint - placed where concreting stops at the end of the day or at a break. It is designed as a butt joint with dowels, preferably at a contraction-joint location.
  4. Longitudinal joint - between adjacent lanes (about every 3.5 m) to control longitudinal cracking from warping. Tie bars (12 mm deformed bars) hold the slabs together and prevent lane separation.
  5. Warping joint (hinged joint) - used in older practice in the middle of a slab to relieve warping stress; today the longitudinal joint with tie bars serves this purpose.