- Asked 3/20
- 2080 Baisakh · 8 marks
- 2070 Chaitra (old course) · 6 marks
- 2066 Bhadra · 2 marks
Bituminous premix carpet construction
Short answer
Bituminous premix carpet (20–25 mm) is constructed by spreading pre-coated 13.2 mm and 11.2 mm chippings with 80/100 or 60/70 bitumen over a tack coat at 100–120°C, compacting with an 8–10 t roller, and applying a seal coat. Quality control tests aggregate/bitumen, mix temperature, thickness (±5 mm), and evenness (≤8 mm under 3 m straight edge).
Describe the construction procedure of bituminous premix carpet including the requirements on materials, equipment and the tests for quality control.
Bituminous premix carpet (PMC) is a 20-25 mm thick open-graded wearing course in which pre-coated chippings are laid and compacted over a tack-coated base (IRC:14, MoRTH Section 508; used on rural and low-volume roads in Nepal under DoR/DoLIDAR specifications).
Materials
- Aggregate: 13.2 mm and 11.2 mm nominal size crushed stone/gravel; AIV below 30 percent, LAA below 35 percent, flakiness below 25 percent, water absorption below 1 percent, stripping value below 5 percent.
- Binder: bitumen 80/100 or 60/70 grade, or cutback / emulsion; quantities of binder and chippings per 10 m2 are taken from the IRC:14 table for the 20 mm carpet (per 10 m2: 0.18 m3 of 13.2 mm and 0.09 m3 of 11.2 mm chippings, with 9.5 kg and 5.1 kg of bitumen respectively, 14.6 kg in all).
- Tack coat: 0.25-0.30 kg/m2 of bitumen emulsion.
Equipment: bitumen boiler with sprayer, mixer (drum mixer or mixing platform), 8-10 t smooth wheel roller, tipper, brooms, hand tools, thermometers.
Construction procedure
- Prepare the base: clean, repair, apply tack coat (0.25-0.30 kg/m2) and allow to break.
- Heat aggregates to 130-165 C and bitumen to 120-165 C, mix in a mixer so that each chipping is uniformly coated (a mixing platform for small jobs).
- Spread the premix at 100-120 C immediately by paver or by hand rake, to uniform camber and thickness.
- Roll with an 8-10 t roller from edges towards the centre, starting at about 100 C, until the chippings are firmly keyed and the surface is true.
- Apply the seal coat (a bitumen film with 6.7 mm chips or sand) after the carpet has set; this closes the open texture and makes it waterproof.
- Open to traffic after the surface cools.
Quality control: aggregate and bitumen tests; temperature checks of mix at laying; rate of spread of materials by measuring the area covered; thickness (+- 5 mm) and cross-section; surface evenness with a 3 m straight edge (max 8 mm); bitumen content by extraction on random samples.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- WBM: material, equipment, procedure, quality control · Transportation Engineering II, chapter 3
- Asphalt concrete construction and quality control · Transportation Engineering II, chapter 3 · asked 5×
- Road construction equipment and DBSD procedure · Transportation Engineering II, chapter 3
- Bituminous pavement types and quality control · Transportation Engineering II, chapter 3
- Bituminous pavement types; asphalt concrete construction · Transportation Engineering II, chapter 3
- Road construction activities; plants for bituminous and CC · Transportation Engineering II, chapter 3
- Tests on bituminous binders · Transportation Engineering I, chapter 6 · asked 8×
- Quality control in urban road construction · Project Engineering, chapter 4
- Types of bitumen and bituminous materials · Transportation Engineering I, chapter 6 · asked 6×