- 2082 Baisakh · 8 marks
WBM: material, equipment, procedure, quality control
Short answer
WBM uses graded crushed coarse aggregate (Grading 1–3), screenings (13.2/11.2 mm), binding material, water. An 8–10 t roller and grader are used. Spread coarse aggregate, dry roll, add screenings in stages with wet rolling till slurry waves, set 1–2 days. Quality control: LAA<40%, AIV<30%, flakiness<15%, thickness, camber, evenness ≤12 mm under straight edge.
Write down the material, equipment, construction procedure and quality control for water bound macadam pavement.
Water Bound Macadam (WBM) is a base or surfacing course of clean crushed stone aggregate of graded sizes, bound by screenings, binding material and water, and compacted by rolling (IRC:19 and MoRTH Section 404; used in Nepal DoR specifications for base courses).
Materials
- Coarse aggregate: hard, tough crushed stone (Los Angeles abrasion value below 40 percent and aggregate impact value below 30 percent for base; up to 50 and 40 percent for sub-base), flakiness index below 15 percent, in three gradings: Grading 1 (90-45 mm), Grading 2 (63-45 mm) and Grading 3 (53-22.4 mm).
- Screenings: crushed stone of 13.2 mm (Type A) or 11.2 mm (Type B) nominal size to fill the voids in the coarse aggregate; non-plastic moorum or gravel (liquid limit below 20, plasticity index below 6) may be used where economical.
- Binding material: a small quantity of fine material such as crusher dust or moorum (PI below 6 percent), used only if needed to bind the screenings.
- Water: clean and free from salts.
Equipment: three-wheel power roller (8-10 t) or vibratory roller (8-10 t), motor grader or spreader, water tanker, brooms, screening spreaders.
Construction procedure
- Prepare the base: clean it, trim it to profile and fill depressions; provide lateral confinement by building the shoulders (or kerbs) along both edges to the thickness of the layer.
- Spread the coarse aggregate to a uniform thickness and the correct camber by stone spreader or manually. The compacted thickness of one layer is 100 mm for Grading 1 and 75 mm for Gradings 2 and 3; the loose depth is about 1.25-1.30 times this.
- Dry rolling: roll from the edges to the centre with an 8-10 t roller until the aggregate is firmly keyed (no creep ahead of the roller).
- Apply the screenings gradually in 3 or 4 stages, with dry rolling and sweeping, so that the voids are filled.
- Sprinkle water on the surface and roll; the slurry formed by the screenings and water fills the voids and binds the stone. Continue wet rolling until a wave of slurry forms ahead of the roller wheels.
- Apply binding material (if required), sprinkle water, roll, and let the surface dry overnight.
- Allow the layer to dry and set (1 to 2 days, with no traffic) before laying the next layer or the surface treatment/premix carpet.
Quality control: aggregate tests (LAA, AIV, flakiness, water absorption, soundness), grading of aggregate and screenings, thickness and camber checks with a template, density by sand replacement, surface regularity by straight edge (max 12 mm undulation), and tests every 100-200 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Water bound macadam materials and construction · Transportation Engineering II, chapter 3 · asked 4×
- Road construction equipment and DBSD procedure · Transportation Engineering II, chapter 3
- Asphalt concrete construction and quality control · Transportation Engineering II, chapter 3 · asked 5×
- Mass haul diagram and WBM construction · Transportation Engineering II, chapter 3
- Bituminous pavement types and quality control · Transportation Engineering II, chapter 3
- Rolled vs normal concrete; CC pavement construction · Transportation Engineering II, chapter 3
- Equipment for highway and pavement construction · Construction Management, chapter 4 · asked 3×
- Quality control in urban road construction · Project Engineering, chapter 4
- Macadam versus Telford construction · Transportation Engineering I, chapter 1 · asked 2×
- Macadam road construction method · Transportation Engineering I, chapter 1