- 2073 Shrawan · 8 marks
Skid numerical: bridge abutment impact at 20 kmph
Short answer
Using the skid-distance equation in km/h with v_a=20 km/h, f1=0.35, d1=30 m, f2=0.50, d2=60 m gives initial speed = sqrt(400 + 254(10.5+30)) = 103.4 km/h (28.73 m/s).
A vehicle hits a bridge abutment at a speed estimated by investigations as 20kmph. Skid marks of 30 m on the pavement (f=0.35) followed by skid marks of 60 m on the gravel shoulder approaching the abutment (f=0.50). What was the initial speed of vehicle?
The vehicle skidded 30 m on the pavement, left the pavement and skidded another 60 m on the gravel shoulder, and then hit the abutment at 20 km/h. Working backwards by the work-energy equation over each stretch:
start -> [ 30 m pavement f=0.35 ] -> [ 60 m gravel f=0.50 ] -> abutment
v0 v1 20 km/h
Data: km/h m/s.
Step 1: Speed at the start of the gravel shoulder
Step 2: Initial speed at the start of the pavement skid
Answer: initial speed of the vehicle = 28.73 m/s = 103.4 km/h.
(Check with the IRC/Indian field formula km/h.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Skid numerical: moving vehicle hits parked vehicle · Transportation Engineering II, chapter 1
- Skid numerical: A from West, B from South (45, 50) · Transportation Engineering II, chapter 1 · asked 2×
- Skid numerical: A from North, B from West · Transportation Engineering II, chapter 1 · asked 3×
- Skid numerical: A from West, B from South (49, 27) · Transportation Engineering II, chapter 1
- Skid numerical: A from West, B from South (51, 61) · Transportation Engineering II, chapter 1 · asked 2×
- Skid numerical: car 430 kg and truck 1299 kg · Transportation Engineering II, chapter 1
- AVL tree for 10, 20, 30, 35, 50, ... · Data Structure and Algorithm, chapter 6
- Transition curve 200 m radius, 60 kmph · Transportation Engineering I, chapter 3
- Crest speed for 60 kmph schedule over 6 km · Utilization of Electrical Energy, chapter 4
- Two balls impact e = 0.9, 30 and 50 kg · Applied Mechanics (Dynamics), chapter 2