A factory works for 2 shift (8 hours per shift) a day for 285 days in a year. The following two system of tariff are available. (i) Medium voltage supply at Rs 12 per unit plus Rs 1300 per month per kVA of maximum demand. (ii) Low voltage supply at Rs.650 per month per kVA of maximum demand plus Rs.13 per unit. The factory has an average load of 250 kW at 0.8 power factor and a maximum demand of 300 kW at the same power factor. The high voltage equipment costs Rs. 700 per kVA and losses can be taken as 5%. Interest and depreciation charges are 10%. Calculate the difference in the annual cost between the two systems.
Data: working hours = 2 × 8 × 285 = 4560 h/year; average load 250 kW; maximum demand 300 kW at 0.8 pf.
Low voltage supply
Medium voltage supply
The consumer installs the transformer and switchgear (rated for the 375 kVA demand); their 5% losses are metered on the MV side.
| System | Annual cost (Rs) |
|---|---|
| Low voltage | 17,745,000 |
| Medium voltage | 20,584,145 |
The MV demand charge (Rs 1300/kVA/month) is double the LV one, so it outweighs the Re 1/unit lower energy rate.
Answer: Difference in annual cost = Rs 2,839,145 (about Rs 28.4 lakh); the low voltage supply is cheaper.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- HV vs LV supply tariff for a factory · Utilization of Electrical Energy, chapter 6 · asked 2×
- Annual charge and pf improvement (Rs 1300/kVA tariff) · Utilization of Electrical Energy, chapter 6 · asked 3×
- Which motor is more economical (two-part tariff) · Utilization of Electrical Energy, chapter 6
- EVA; 10 days, 100,000, day 6, Rs 65,000 · Project Engineering, chapter 4