- Asked 3/16
- 2082 Baisakh · 8 marks
Annual charge and pf improvement for 1200 kVA load
Short answer
i) P=900 kW, MD charge 1200×5000, energy 900×3000×5, total Rs 19,500,000. ii) Qc=900(0.8819−0.3287)=497.9 kVAR; new MD 947.37 kVA, total annual charge including corrector cost Rs 18,635,170.
The load on a certain installation may be considered constant at 1,200 kVA, 0.75 lagging power factor for 3,000 hours per annum. The tariff is Rs 5,000 per kVA maximum demand plus Rs 5 per kWh. i) Determine the annual charge of energy. ii) Power Factor improving apparatus is installed to improve the pf to 0.95 lagging. Determine the kVAR require and the annual charge of energy if the power factor improving apparatus costs Rs 8,000 per kVAR, annual interest and depreciation charges are 10% of the capital cost.
Given: kVA at pf 0.75 lag, 3000 h/year, tariff Rs 5000/kVA of maximum demand per year + Rs 5/kWh; pf corrector cost Rs 8000/kVAR, annual interest and depreciation 10%.
i) Annual charge at pf 0.75
ii) After raising pf to 0.95
kVAR required:
New maximum demand:
Annual charges:
| Item | pf 0.75 (Rs) | pf 0.95 (Rs) |
|---|---|---|
| MD charge | 6,000,000 | 4,736,842 |
| Energy charge | 13,500,000 | 13,500,000 |
| Corrector charges | — | 398,328 |
| Total | 19,500,000 | 18,635,170 |
Answer: (i) Rs 19,500,000 per year; (ii) 497.9 kVAR needed, new annual charge Rs 18,635,170, an annual saving of about Rs 864,830.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Annual charge and pf improvement (Rs 65/kVA tariff) · Utilization of Electrical Energy, chapter 6 · asked 3×
- Annual charge and pf improvement (Rs 1300/kVA tariff) · Utilization of Electrical Energy, chapter 6 · asked 3×
- Annual saving by pf improvement for 800 kW load · Utilization of Electrical Energy, chapter 6
- Optimum pf under two-part tariff (200 kW) · Industrial Power Distribution and Illumination, chapter 10
- PF improvement of 490 kW load with demand charge · Industrial Power Distribution and Illumination, chapter 10 · asked 2×
- PF improvement of 1020 kVA factory load · Industrial Power Distribution and Illumination, chapter 10 · asked 2×