PF improvement of 1020 kVA factory load
Short answer
Required capacitor 569.18 kVAr. Transformer copper loss drops by 4.12 kW (12 036 kWh/yr, Rs 90 267). Maximum demand reduces by 332.84 kVA saving Rs63 240/month. Payback period 0.54 year (6.4 months).
A factory takes an average load of 1020 kVA at 0.64 p.f.(lag) from the 1600 kVA transformer. The no-load loss and full load loss of transformer are 2.4kW and 18.57 KW respectively. If the unit cost of capacitor bank per kVAr is Rs.800, maximum demand charge is Rs.190 per kVA and unit charge of energy is Rs.7.50. Calculate: i) kVAR required to improve p.f. to 0.95 ii) Reduction in loss in transformer if the loading duration is 2920 hours per year. iii) Reduction in maximum demand charge iv) Payback Period
Given: average load 1020 kVA at 0.64 pf (lag); transformer 1600 kVA; no-load loss 2.4 kW; full-load (copper) loss 18.57 kW; capacitor cost Rs 800/kVAr; maximum demand charge Rs 190/kVA (taken as per month); energy charge Rs 7.50/kWh; loading 2920 h/year.
i) kVAr required to improve pf to 0.95
P = 1020 × 0.64 = 652.8 kW
Q₁ = 1020 × sin(cos⁻¹0.64) = 1020 × 0.7684
= 783.74 kVAr
Q₂ = P × tan(cos⁻¹0.95) = 652.8 × 0.3287
= 214.56 kVAr
Qc = Q₁ − Q₂ = 569.18 kVAr
New kVA S₂ = 652.8 / 0.95 = 687.16 kVA
ii) Reduction in transformer loss
No-load loss (2.4 kW) does not change. Copper loss ∝ (S/S_rated)²:
Cu loss before = 18.57 × (1020/1600)² = 7.547 kW
Cu loss after = 18.57 × (687.16/1600)² = 3.425 kW
Reduction = 4.122 kW
Energy saved = 4.122 × 2920 = 12 035.6 kWh/yr
Cost saved = 12 035.6 × 7.50 = Rs 90 266.8/yr
iii) Reduction in maximum demand charge
kVA reduction = 1020 − 687.16 = 332.84 kVA
Saving = 332.84 × 190 = Rs 63 240 per month
= Rs 758 880 per year
iv) Payback period
Capacitor cost = 569.18 × 800 = Rs 455 342
Annual saving = 758 880 + 90 266.8 = Rs 849 147
Payback = 455 342 / 849 147
= 0.536 year ≈ 6.4 months
Answer: (i) 569.18 kVAr; (ii) 4.12 kW less loss, 12 036 kWh/yr = Rs 90 267/yr; (iii) Rs 63 240/month (Rs 758 880/yr); (iv) payback ≈ 0.54 year (about 6.4 months). (If the demand charge is taken as a one-time yearly figure, annual saving = 63 240 + 90 267 = Rs 153 507 and payback ≈ 2.97 years.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- PF improvement of 490 kW load with demand charge · Industrial Power Distribution and Illumination, chapter 10 · asked 2×
- PF improvement of 490 kW load at 6.6 kV · Industrial Power Distribution and Illumination, chapter 10 · asked 2×
- PF improvement of 490 kW load at 11 kV · Industrial Power Distribution and Illumination, chapter 10
- kVAr and techno-economic analysis for 1000 kVA transformer · Industrial Power Distribution and Illumination, chapter 10
- PF correction for 1250 kVA generator (+170 kW) · Industrial Power Distribution and Illumination, chapter 10
- Most economical power factor for 50 kW factory · Industrial Power Distribution and Illumination, chapter 10
- Capacitor for 6 kW load pf improvement · Basic Electrical Engineering, chapter 7
- 500 kVA transformer efficiency full/half load · Electrical Machine, chapter 2
- 500 kVA transformer efficiency, full and half load · Electrical Machines, chapter 2
- Annual charge and pf improvement for 1200 kVA load · Utilization of Electrical Energy, chapter 6 · asked 3×
All Industrial Power Distribution and Illumination chapter 10 questions →