- 2075 Chaitra · 8 marks
Time to lower level in two-orifice tank
Short answer
Stage 1 (8 m to 5 m) both orifices active, stage 2 (5 m to 3 m) only lower orifice. With k=Cd a sqrt(2g)=2.417e-5 m^(5/2)/s, total time t≈3.21e5 s (≈89 h).
A tank of constant cross-sectional area of 3.2 m² has two orifices each 8.8 mm² in area in one of its vertical sides at heights 5 m and 2 m respectively above the bottom of the tank. Calculate the time taken to lower the water level from 8 m to 3 m above bottom of tank. Assume = 0.62.
Given: tank area m²; two orifices each mm² m² at 5 m and 2 m above the bottom; ; level falls from 8 m to 3 m.
The upper orifice (at 5 m) works only while the level is above 5 m. So the problem has two stages:
- Stage 1: level 8 m to 5 m, both orifices discharging.
- Stage 2: level 5 m to 3 m, only the lower orifice (at 2 m) discharging.
Head over the upper orifice ; over the lower orifice ( = level above tank bottom).
Stage 1 (8 m to 5 m)
Rationalise: .
Evaluating the bracket: at : ; at : . Difference .
Stage 2 (5 m to 3 m, lower orifice only)
Total
Answer: s (about 89 hours) for the data as given. The very long time results from the tiny orifice areas (8.8 mm²). If the areas were 8.8 cm², all times would be 100 times smaller (about 3205 s, i.e. 53 min).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cippoletti notch; tank inflow and area · Fluid Mechanics, chapter 6
- Jet from tank on plate over second tank · Fluid Mechanics, chapter 7
- Time to discharge pressurised tank · Fluid Mechanics, chapter 6
- Orifice plate flow in hydropower canal · Fluid Mechanics, chapter 6
- Vertical force on cylinder with hemispherical ends · Fluid Mechanics, chapter 3
- Gauge pressure in cleaning fluid tank · Fluid Mechanics, chapter 2
- Storage tank capacity and water level, 20000 L/day · Water Supply Engineering, chapter 7 · asked 2×
- Surge tank area, up/downsurge, invert level · Hydropower Engineering, chapter 6
- Cross wall design, 125 mm slab, 3.2 m · Concrete Technology and Masonry Structure, chapter 8 · asked 3×
- Cross-sectional elements of a highway · Transportation Engineering I, chapter 3 · asked 2×