Skip to main content

Surge tank area, up/downsurge, invert level

Short answer

Thoma area is 28.9 m2, equivalent diameter 6.07 m. Full-load rejection gives maximum upsurge level 1095.36 m and downsurge level 1006.10 m, so up 47.36 m and down 41.90 m from 1048 m headwater. Invert level of headrace tunnel at surge tank is about 1000.1 m.

A power station is fed by a 4000 m long concrete lined tunnel of 5.0 m dia and 600 m long pressure shaft of 4.0 m dia operating under a gross head of 250 m. If the design discharge of the plant is 60 m³/sec and the friction factors in tunnel and pressure shaft are 0.014 and 0.012 respectively, i) compute the sectional area required for mass oscillation in a surge tank; ii) find the maximum upsurge and downsurge levels; iii) if the headwater level is 1048 m, find out the invert level of the headrace tunnel at the surge tank.

Given data and losses

At=π4(5)2=19.635 m2A_t = \frac{\pi}{4}(5)^2 = 19.635\ \text{m}^2, Vt=60/19.635=3.056V_t = 60/19.635 = 3.056 m/s. Shaft: Ap=12.566 m2A_p = 12.566\ \text{m}^2, Vp=4.775V_p = 4.775 m/s.

  • Tunnel loss: hft=0.014×4000×3.05622(9.81)(5)=5.33h_{ft} = \dfrac{0.014 \times 4000 \times 3.056^2}{2(9.81)(5)} = 5.33 m
  • Shaft loss: hfp=0.012×600×4.77522(9.81)(4)=2.09h_{fp} = \dfrac{0.012 \times 600 \times 4.775^2}{2(9.81)(4)} = 2.09 m
  • Net head H0=250−5.33−2.09=242.58H_0 = 250 - 5.33 - 2.09 = 242.58 m

i) Surge tank area (Thoma)

Head-loss coefficient of the tunnel, α=hft/Vt2=5.33/3.0562=0.5708 s2/m\alpha = h_{ft}/V_t^2 = 5.33/3.056^2 = 0.5708\ \text{s}^2/\text{m}.

Ath=LAt2gαH0=4000×19.6352(9.81)(0.5708)(242.58)=28.9 m2A_{th} = \frac{L A_t}{2g\alpha H_0} = \frac{4000 \times 19.635}{2(9.81)(0.5708)(242.58)} = 28.9\ \text{m}^2

Equivalent diameter =6.07= 6.07 m. Adopting As=Ath=28.9 m2A_s = A_{th} = 28.9\ \text{m}^2 (a larger area, e.g. 1.5Ath1.5A_{th}, gives more safety).

ii) Maximum upsurge and downsurge

Z0=3.0564000×19.6359.81×28.9=50.85Z_0 = 3.056\sqrt{\dfrac{4000 \times 19.635}{9.81 \times 28.9}} = 50.85 m. With friction (hft=5.33h_{ft} = 5.33 m), for full load rejection:

  • Maximum upsurge =47.36= 47.36 m above reservoir level, i.e. level 1048+47.36=1095.361048 + 47.36 = 1095.36 m.
  • Maximum downsurge (first downswing) =41.90= 41.90 m below reservoir level, i.e. level 1048−41.90=1006.101048 - 41.90 = 1006.10 m.

For comparison, with As=1.5Ath=43.4 m2A_s = 1.5A_{th} = 43.4\ \text{m}^2: upsurge 38.05 m and downsurge 32.88 m.

iii) Invert level of the headrace tunnel at the tank

The tunnel crown must stay below the lowest water level in the tank to prevent air entering the tunnel. Assume a minimum water cover of 1.0 m over the crown.

  • Lowest tank level =1006.10= 1006.10 m
  • Crown =1006.10−1.0=1005.10= 1006.10 - 1.0 = 1005.10 m
  • Invert =1005.10−5.0=1000.10= 1005.10 - 5.0 = 1000.10 m

Answer: Ath=28.9 m2A_{th} = 28.9\ \text{m}^2; upsurge level =1095.36= 1095.36 m; downsurge level =1006.10= 1006.10 m; invert level ≈1000.1\approx 1000.1 m a.s.l.