- Asked 2/21
- 2082 Baishakh · 7 marks
Surge and water hammer: 45 m³/s, 20 m surge tank
Short answer
Maximum upsurge is 7.02 m, downsurge 6.63 m. Water hammer pressure head due to sudden closure is 681.4 m, and the mass oscillation time period is 317.2 s.
A hydropower project has a design discharge of 45 m³/s through a tunnel, which is conveyed by three penstocks to the turbines. The tunnel is 4 km long and 8 m in diameter, with a friction factor of 0.016. Each penstock is 500 m long and 2 m in diameter, with a friction factor of 0.04. The velocity of the wave in the penstocks is 1400 m/s. A surge tank with a diameter of 20 m is provided at the end of the tunnel. For a full load rejection, determine the following: a) Maximum up-surge, b) Maximum down-surge, c) Water hammer pressure, d) Time of oscillation of wave.
Method used
Let the tunnel have area , length , diameter and friction factor ; the tank has area .
- Tunnel velocity ; steady friction loss .
- Frictionless amplitude: .
- Upsurge with friction (full load rejection), measured above reservoir level, from the equation of motion and continuity:
- The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
- Period of mass oscillation: .
Surge in the tunnel
, , m.
- m/s
- m
- m
a) Maximum up-surge
m above reservoir level.
b) Maximum down-surge
First downswing m below reservoir level.
c) Water hammer pressure
Each penstock carries m³/s. , so m/s.
Full load rejection means the gates close suddenly (closure time s), so the Joukowsky rise is
().
d) Time of oscillation
(The pressure wave in the penstock itself has a period s.)
Answer: up-surge 7.02 m; down-surge 6.63 m; water hammer head 681.4 m (6.69 MPa); s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Surge and water hammer: 25 m³/s, 15 m surge tank · Hydropower Engineering, chapter 6 · asked 3×
- Surge and water hammer: 60 m³/s, 30 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Surge numerical: 13 m tank, 1.8 km tunnel · Hydropower Engineering, chapter 6
- Surge tank: 7.5 m³/s through 2.5 m tunnel · Hydropower Engineering, chapter 6
- Surge numerical: 4 m tunnel, 4000 m, 20 m³/s · Hydropower Engineering, chapter 6 · asked 2×
- Surge tank: tunnel 5 m dia, 28 cumec · Hydropower Engineering, chapter 6
- Hydraulic design of surge tank and pressure tunnel · Hydropower Engineering, chapter 6
- Water hammer in penstock and surge tank · Power Plant Equipment, chapter 1 · asked 2×
- Surge tank objectives and economic penstock diameter factors · Hydro Power, chapter 5
- Water hammer in 250 m penstock · Hydro Power, chapter 1
- Water hammer in 20 m steel pipeline with valve · Hydraulics, chapter 4