Surge and water hammer: 45 m³/s, 20 m surge tank

Short answer

Maximum upsurge is 7.02 m, downsurge 6.63 m. Water hammer pressure head due to sudden closure is 681.4 m, and the mass oscillation time period is 317.2 s.

A hydropower project has a design discharge of 45 m³/s through a tunnel, which is conveyed by three penstocks to the turbines. The tunnel is 4 km long and 8 m in diameter, with a friction factor of 0.016. Each penstock is 500 m long and 2 m in diameter, with a friction factor of 0.04. The velocity of the wave in the penstocks is 1400 m/s. A surge tank with a diameter of 20 m is provided at the end of the tunnel. For a full load rejection, determine the following: a) Maximum up-surge, b) Maximum down-surge, c) Water hammer pressure, d) Time of oscillation of wave.

Method used

Let the tunnel have area AtA_t, length LL, diameter DD and friction factor ff; the tank has area AsA_s.

  • Tunnel velocity V=Q/AtV = Q/A_t; steady friction loss hf=fLV22gDh_f = \dfrac{fLV^2}{2gD}.
  • Frictionless amplitude: Z0=VLAtgAsZ_0 = V\sqrt{\dfrac{L A_t}{g A_s}}.
  • Upsurge with friction (full load rejection), ZZ measured above reservoir level, from the equation of motion and continuity:
Zmaxhf=Z022hf2[1−e−2hf(Zmax+hf)/Z02]\frac{Z_{max}}{h_f}=\frac{Z_0^2}{2h_f^2}\left[1-e^{-2h_f (Z_{max}+h_f)/Z_0^2}\right]
  • The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
  • Period of mass oscillation: T=2πLAsgAtT = 2\pi\sqrt{\dfrac{L A_s}{g A_t}}.

Surge in the tunnel

At=π4(8)2=50.27 m2A_t = \frac{\pi}{4}(8)^2 = 50.27\ \text{m}^2, As=π4(20)2=314.16 m2A_s = \frac{\pi}{4}(20)^2 = 314.16\ \text{m}^2, L=4000L = 4000 m.

  • V=45/50.27=0.895V = 45/50.27 = 0.895 m/s
  • hf=0.016×4000×0.89522(9.81)(8)=0.327h_f = \dfrac{0.016 \times 4000 \times 0.895^2}{2(9.81)(8)} = 0.327 m
  • Z0=0.8954000×50.279.81×314.16=7.23Z_0 = 0.895\sqrt{\dfrac{4000 \times 50.27}{9.81 \times 314.16}} = 7.23 m

a) Maximum up-surge

Zmax=7.02Z_{max} = 7.02 m above reservoir level.

b) Maximum down-surge

First downswing =6.63= 6.63 m below reservoir level.

c) Water hammer pressure

Each penstock carries 45/3=1545/3 = 15 m³/s. Ap=π4(2)2=3.142 m2A_p = \frac{\pi}{4}(2)^2 = 3.142\ \text{m}^2, so v=15/3.142=4.775v = 15/3.142 = 4.775 m/s.

Full load rejection means the gates close suddenly (closure time ≤2L/a=2(500)/1400=0.71\le 2L/a = 2(500)/1400 = 0.71 s), so the Joukowsky rise is

h=avg=1400×4.7759.81=681.4 mh = \frac{a v}{g} = \frac{1400 \times 4.775}{9.81} = 681.4\ \text{m}

p=ρgh=6.69 MPap = \rho g h = 6.69\ \text{MPa} (≈68.1 kg/cm2\approx 68.1\ \text{kg/cm}^2).

d) Time of oscillation

T=2π4000×314.169.81×50.27=317.2 s≈5.3 minT = 2\pi\sqrt{\frac{4000 \times 314.16}{9.81 \times 50.27}} = 317.2\ \text{s} \approx 5.3\ \text{min}

(The pressure wave in the penstock itself has a period 4Lp/a=4(500)/1400=1.434L_p/a = 4(500)/1400 = 1.43 s.)

Answer: up-surge 7.02 m; down-surge 6.63 m; water hammer head 681.4 m (6.69 MPa); T=317.2T = 317.2 s.