Surge and water hammer: 60 m³/s, 30 m surge tank

Short answer

Tunnel velocity 0.764 m/s gives friction loss 0.333 m and frictionless amplitude 6.80 m. Maximum upsurge is 6.58 m above reservoir level, downsurge 6.19 m below. Per penstock velocity 6.366 m/s gives water hammer head 1168.1 m (11.46 MPa); oscillation period is 503.5 s.

The design discharge through the tunnel of a hydropower project is 60 m³/s and is conveyed by three penstocks to the turbine of 2 m diameter each. Take the length of the tunnel as 7 km, diameter of tunnel is 10 m, friction factor of tunnel is 0.016, friction factor of penstock = 0.04 and velocity of wave in penstock = 1800 m/sec. If a surge tank of 30 m diameter has been provided at the end of the tunnel, find the following: (i) maximum up-surge and down-surge in the tank, (ii) water hammer pressure, (iii) time of oscillation of wave.

Method used

Let the tunnel have area AtA_t, length LL, diameter DD and friction factor ff; the tank has area AsA_s.

  • Tunnel velocity V=Q/AtV = Q/A_t; steady friction loss hf=fLV22gDh_f = \dfrac{fLV^2}{2gD}.
  • Frictionless amplitude: Z0=VLAtgAsZ_0 = V\sqrt{\dfrac{L A_t}{g A_s}}.
  • Upsurge with friction (full load rejection), ZZ measured above reservoir level, from the equation of motion and continuity:
Zmaxhf=Z022hf2[1−e−2hf(Zmax+hf)/Z02]\frac{Z_{max}}{h_f}=\frac{Z_0^2}{2h_f^2}\left[1-e^{-2h_f (Z_{max}+h_f)/Z_0^2}\right]
  • The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
  • Period of mass oscillation: T=2πLAsgAtT = 2\pi\sqrt{\dfrac{L A_s}{g A_t}}.

Surge in the tunnel

At=π4(10)2=78.54 m2A_t = \frac{\pi}{4}(10)^2 = 78.54\ \text{m}^2, As=π4(30)2=706.86 m2A_s = \frac{\pi}{4}(30)^2 = 706.86\ \text{m}^2, L=7000L = 7000 m.

  • V=60/78.54=0.764V = 60/78.54 = 0.764 m/s
  • hf=0.016×7000×0.76422(9.81)(10)=0.333h_f = \dfrac{0.016 \times 7000 \times 0.764^2}{2(9.81)(10)} = 0.333 m
  • Z0=0.7647000×78.549.81×706.86=6.80Z_0 = 0.764\sqrt{\dfrac{7000 \times 78.54}{9.81 \times 706.86}} = 6.80 m

(i) Maximum up-surge and down-surge

  • Up-surge =6.58= 6.58 m above reservoir level.
  • Down-surge (first downswing) =6.19= 6.19 m below reservoir level.

(ii) Water hammer pressure

Discharge per penstock =60/3=20= 60/3 = 20 m³/s; Ap=3.142 m2A_p = 3.142\ \text{m}^2; v=20/3.142=6.366v = 20/3.142 = 6.366 m/s.

h=avg=1800×6.3669.81=1168.1 mh = \frac{a v}{g} = \frac{1800 \times 6.366}{9.81} = 1168.1\ \text{m}

p=11.46 MPap = 11.46\ \text{MPa} (≈116.8 kg/cm2\approx 116.8\ \text{kg/cm}^2), for instantaneous (rapid) closure.

(iii) Time of oscillation

T=2π7000×706.869.81×78.54=503.5 s≈8.4 minT = 2\pi\sqrt{\frac{7000 \times 706.86}{9.81 \times 78.54}} = 503.5\ \text{s} \approx 8.4\ \text{min}

Answer: up-surge 6.58 m; down-surge 6.19 m; water hammer head 1168.1 m (11.46 MPa); T=503.5T = 503.5 s.