- 2082 Bhadra · 6 marks
Surge tank: 7.5 m³/s through 2.5 m tunnel
Short answer
The oscillation time period is 280.8 s. Maximum upsurge is 7.35 m above reservoir level, and the surge tank height required is about 15 m, including freeboard.
A hydropower project is designed to carry a flow of 7.5 m³/sec through a tunnel of diameter 2.5 m. A simple surge tank of diameter 7 m is located at a distance of 2,500 m from the reservoir. Calculate the total time period of oscillation of wave for full load rejection. Also, estimate the height of the surge tank. Take friction factor = 0.018.
Method used
Let the tunnel have area , length , diameter and friction factor ; the tank has area .
- Tunnel velocity ; steady friction loss .
- Frictionless amplitude: .
- Upsurge with friction (full load rejection), measured above reservoir level, from the equation of motion and continuity:
- The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
- Period of mass oscillation: .
Calculation
, , m, .
- m/s
- m
- m
Time period of oscillation
Height of surge tank
Solving the upsurge equation with friction: m above reservoir level. The first downsurge is m below reservoir level, so the water level swings through about m. Adding a freeboard of about 2 m at the top, the surge tank must be at least about m high above the minimum level.
Answer: s; maximum upsurge m above reservoir level (tank height about 15 m including range and freeboard).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Surge and water hammer: 25 m³/s, 15 m surge tank · Hydropower Engineering, chapter 6 · asked 3×
- Surge tank: tunnel 5 m dia, 28 cumec · Hydropower Engineering, chapter 6
- Surge and water hammer: 45 m³/s, 20 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Surge numerical: 4.5 m tunnel, 2500 m, 25 m³/s · Hydropower Engineering, chapter 6 · asked 2×
- Surge and water hammer: 60 m³/s, 30 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Surge numerical: 13 m tank, 1.8 km tunnel · Hydropower Engineering, chapter 6
- Surge tank objectives and economic penstock diameter factors · Hydro Power, chapter 5
- Digester diameter from 500 m³ sed. tank · Sanitary Engineering, chapter 8
- 500 kVA transformer efficiency full/half load · Electrical Machine, chapter 2
- 500 kVA transformer efficiency, full and half load · Electrical Machines, chapter 2