Surge and water hammer: 25 m³/s, 15 m surge tank

Short answer

Maximum upsurge is 5.29 m, downsurge 5.16 m. The water hammer pressure head is 649.0 m for rapid closure, and the oscillation time period is 237.9 s.

The design discharge through the tunnel of a hydropower project is 25 m³/sec and is conveyed by two penstocks to the turbine. The length and diameter of the tunnel are 4 km and 8 m respectively, friction factor of the tunnel is 0.016 and length of each penstock is 500 m, diameter and friction factor of the penstock are 2 m and 0.04 respectively and velocity of wave in penstock = 1600 m/sec. If a surge tank of 15 m diameter has been provided at the end of the tunnel, find the following for full load rejection: (i) maximum up-surge, (ii) maximum down-surge, (iii) water hammer pressure, (iv) time of oscillation of wave.

Method used

Let the tunnel have area AtA_t, length LL, diameter DD and friction factor ff; the tank has area AsA_s.

  • Tunnel velocity V=Q/AtV = Q/A_t; steady friction loss hf=fLV22gDh_f = \dfrac{fLV^2}{2gD}.
  • Frictionless amplitude: Z0=VLAtgAsZ_0 = V\sqrt{\dfrac{L A_t}{g A_s}}.
  • Upsurge with friction (full load rejection), ZZ measured above reservoir level, from the equation of motion and continuity:
Zmaxhf=Z022hf2[1−e−2hf(Zmax+hf)/Z02]\frac{Z_{max}}{h_f}=\frac{Z_0^2}{2h_f^2}\left[1-e^{-2h_f (Z_{max}+h_f)/Z_0^2}\right]
  • The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
  • Period of mass oscillation: T=2πLAsgAtT = 2\pi\sqrt{\dfrac{L A_s}{g A_t}}.

Surge in the tunnel

At=50.27 m2A_t = 50.27\ \text{m}^2, As=π4(15)2=176.71 m2A_s = \frac{\pi}{4}(15)^2 = 176.71\ \text{m}^2, L=4000L = 4000 m.

  • V=25/50.27=0.497V = 25/50.27 = 0.497 m/s
  • hf=0.016×4000×0.49722(9.81)(8)=0.101h_f = \dfrac{0.016 \times 4000 \times 0.497^2}{2(9.81)(8)} = 0.101 m
  • Z0=0.4974000×50.279.81×176.71=5.36Z_0 = 0.497\sqrt{\dfrac{4000 \times 50.27}{9.81 \times 176.71}} = 5.36 m

(i) Maximum up-surge

Zmax=5.29Z_{max} = 5.29 m above reservoir level.

(ii) Maximum down-surge

First downswing =5.16= 5.16 m below reservoir level.

(iii) Water hammer pressure

Flow per penstock =25/2=12.5= 25/2 = 12.5 m³/s; v=12.5/3.142=3.979v = 12.5/3.142 = 3.979 m/s. Closure time for full load rejection is taken as less than 2L/a=2(500)/1600=0.6252L/a = 2(500)/1600 = 0.625 s (rapid closure):

h=avg=1600×3.9799.81=649.0 mh = \frac{a v}{g} = \frac{1600 \times 3.979}{9.81} = 649.0\ \text{m}

p=ρgh=6.37 MPap = \rho g h = 6.37\ \text{MPa} (≈64.9 kg/cm2\approx 64.9\ \text{kg/cm}^2).

(iv) Time of oscillation

T=2π4000×176.719.81×50.27=237.9 s≈4.0 minT = 2\pi\sqrt{\frac{4000 \times 176.71}{9.81 \times 50.27}} = 237.9\ \text{s} \approx 4.0\ \text{min}

Answer: up-surge 5.29 m; down-surge 5.16 m; water hammer head 649.0 m (6.37 MPa); T=237.9T = 237.9 s.