- Asked 3/21
- 2079 Baishakh · 8 marks
Surge and water hammer: 25 m³/s, 15 m surge tank
Short answer
Maximum upsurge is 5.29 m, downsurge 5.16 m. The water hammer pressure head is 649.0 m for rapid closure, and the oscillation time period is 237.9 s.
The design discharge through the tunnel of a hydropower project is 25 m³/sec and is conveyed by two penstocks to the turbine. The length and diameter of the tunnel are 4 km and 8 m respectively, friction factor of the tunnel is 0.016 and length of each penstock is 500 m, diameter and friction factor of the penstock are 2 m and 0.04 respectively and velocity of wave in penstock = 1600 m/sec. If a surge tank of 15 m diameter has been provided at the end of the tunnel, find the following for full load rejection: (i) maximum up-surge, (ii) maximum down-surge, (iii) water hammer pressure, (iv) time of oscillation of wave.
Method used
Let the tunnel have area , length , diameter and friction factor ; the tank has area .
- Tunnel velocity ; steady friction loss .
- Frictionless amplitude: .
- Upsurge with friction (full load rejection), measured above reservoir level, from the equation of motion and continuity:
- The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
- Period of mass oscillation: .
Surge in the tunnel
, , m.
- m/s
- m
- m
(i) Maximum up-surge
m above reservoir level.
(ii) Maximum down-surge
First downswing m below reservoir level.
(iii) Water hammer pressure
Flow per penstock m³/s; m/s. Closure time for full load rejection is taken as less than s (rapid closure):
().
(iv) Time of oscillation
Answer: up-surge 5.29 m; down-surge 5.16 m; water hammer head 649.0 m (6.37 MPa); s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Surge and water hammer: 60 m³/s, 30 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Surge and water hammer: 45 m³/s, 20 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Surge tank: 7.5 m³/s through 2.5 m tunnel · Hydropower Engineering, chapter 6
- Surge numerical: 13 m tank, 1.8 km tunnel · Hydropower Engineering, chapter 6
- Surge tank: tunnel 5 m dia, 28 cumec · Hydropower Engineering, chapter 6
- Pumped storage plant: power, turbine, setting, surge · Hydropower Engineering, chapter 7
- Surge numerical: 4.5 m tunnel, 2500 m, 25 m³/s · Hydropower Engineering, chapter 6 · asked 2×
- Hydraulic design of surge tank and pressure tunnel · Hydropower Engineering, chapter 6
- Water hammer in penstock and surge tank · Power Plant Equipment, chapter 1 · asked 2×
- Surge tank objectives and economic penstock diameter factors · Hydro Power, chapter 5