Surge numerical: 4.5 m tunnel, 2500 m, 25 m³/s

Short answer

Tunnel velocity 1.572 m/s, friction loss 1.40 m and frictionless amplitude 11.29 m. With instantaneous closure the maximum upsurge is 10.38 m above reservoir level; first downswing is 9.01 m below. Oscillation period is 222.9 s, about 3.7 min.

In a hydropower project the headrace tunnel of 4.5 m diameter and 2,500 m length carries 25 m³/s discharge to the surge tank of 10 m diameter. The penstock from the surge tank to the power house has 3.5 m diameter and 1000 m length. Considering the case of instantaneous closure, find the maximum height of the surge tank required and the time period of oscillation of wave. Assume friction factor = 0.02.

Method used

Let the tunnel have area AtA_t, length LL, diameter DD and friction factor ff; the tank has area AsA_s.

  • Tunnel velocity V=Q/AtV = Q/A_t; steady friction loss hf=fLV22gDh_f = \dfrac{fLV^2}{2gD}.
  • Frictionless amplitude: Z0=VLAtgAsZ_0 = V\sqrt{\dfrac{L A_t}{g A_s}}.
  • Upsurge with friction (full load rejection), ZZ measured above reservoir level, from the equation of motion and continuity:
Zmaxhf=Z022hf2[1−e−2hf(Zmax+hf)/Z02]\frac{Z_{max}}{h_f}=\frac{Z_0^2}{2h_f^2}\left[1-e^{-2h_f (Z_{max}+h_f)/Z_0^2}\right]
  • The following down-surge is found by integrating the reversed-flow equations step by step (below reservoir level).
  • Period of mass oscillation: T=2πLAsgAtT = 2\pi\sqrt{\dfrac{L A_s}{g A_t}}.

Calculation

At=π4(4.5)2=15.904 m2A_t = \frac{\pi}{4}(4.5)^2 = 15.904\ \text{m}^2, As=π4(10)2=78.54 m2A_s = \frac{\pi}{4}(10)^2 = 78.54\ \text{m}^2, L=2500L = 2500 m, f=0.02f = 0.02.

  • V=25/15.904=1.572V = 25/15.904 = 1.572 m/s
  • hf=0.02×2500×1.57222(9.81)(4.5)=1.40h_f = \dfrac{0.02 \times 2500 \times 1.572^2}{2(9.81)(4.5)} = 1.40 m
  • Z0=1.5722500×15.9049.81×78.54=11.29Z_0 = 1.572\sqrt{\dfrac{2500 \times 15.904}{9.81 \times 78.54}} = 11.29 m

Instantaneous closure means full rejection, so the water rises in the tank. The penstock is downstream of the tank and does not change the tank oscillation.

Maximum height of surge tank

With friction, Zmax=10.38Z_{max} = 10.38 m above reservoir level (frictionless value 11.29 m). The tank should rise at least 10.4 m above the reservoir level, plus freeboard of about 1 to 2 m. The first downswing is 9.01 m below reservoir level.

Time period

T=2π2500×78.549.81×15.904=222.9 s≈3.7 minT = 2\pi\sqrt{\frac{2500 \times 78.54}{9.81 \times 15.904}} = 222.9\ \text{s} \approx 3.7\ \text{min}

Answer: maximum upsurge height =10.38= 10.38 m above reservoir level; T=222.9T = 222.9 s.