- 2068 Bhadra · 8 marks
Water hammer in 20 m steel pipeline with valve
Short answer
Wave celerity c=1335 m/s; instantaneous closure creates a pressure wave of ±678 m (6.65 MPa), positive upstream of the valve, negative downstream. Steady upstream head is 4.74 m. Pressure-time curves show high 682 m, steady 4.74 m, low −673 m with pulse timing depending on distance from the tank.
A 20 m long, 75 mm diameter, steel pipeline, wall thickness 6 mm, carries water from a large reservoir tank, held at a constant head of 6 m. Discharge is 0.022 m³/s through a variable speed valve positioned 10 m from the supply tank. Discharge is to a second constant head tank held at 2 m head as shown in figure below. If the valve closure is instantaneous, determine the theoretical magnitudes of the pressure wave propagated away from the valve under frictionless conditions. Draw pressure (both steady and unsteady) time curve at point 5 m, 2.5 m and 0.5 m from the upstream tank. Take N/m² and N/m². [Figure: upstream tank with 6 m head; pipe of 10 m to the valve and another 10 m to the downstream tank with 2 m head]
For instantaneous closure (frictionless), the valve creates a pressure wave of magnitude . Upstream of the valve the wave is a pressure rise; downstream of the valve it is a pressure drop. The waves reflect at the constant-head tanks (head unchanged, sign reversed) and at the closed valve (sign unchanged).
Given data
m, mm, m³/s, N/m², N/m². The valve is 10 m from the upstream tank (6 m head) and 10 m from the downstream tank (2 m head).
Step 1: Velocity and celerity
Step 2: Magnitude of the pressure wave
- Upstream of the valve (towards the upstream tank): a wave of +677.6 m.
- Downstream of the valve (towards the downstream tank): a wave of −677.6 m.
Step 3: Steady pressure head
In a frictionless pipe, the steady head at any point upstream of the valve is the tank head minus the velocity head:
(The 2 m downstream head is only a boundary level; the remaining head is lost at the valve.)
Step 4: Timing
The valve is m from the tank, so the wave period is ms. For a point m from the upstream tank:
- First rise:
- Back to steady (reflection from the tank):
- Drop of (reflection from the valve):
- Back to steady: ; the cycle repeats every 29.97 ms.
| Point | Rise begins (ms) | Back to steady (ms) | Fall begins (ms) | Back to steady (ms) | Next rise (ms) |
|---|---|---|---|---|---|
| 5 m | 3.75 | 11.24 | 18.73 | 26.22 | 33.71 |
| 2.5 m | 5.62 | 9.36 | 20.60 | 24.35 | 35.59 |
| 0.5 m | 7.12 | 7.87 | 22.10 | 22.85 | 37.08 |
Step 5: Pressure-time curves
The steady pressure head is m (a horizontal line). The unsteady (total) head switches between three levels:
head
+H_hi | ____ ____
| | | |
h_s |_____| |__ ____| (steady line)
| | |
H_lo | |____|
+---------------------------------> t
rise back fall back next rise
H_hi = 682 m, h_s = 4.74 m, H_lo = −673 m. (The shape is the same at all three points; only the timing differs, as shown in the table. Both the positive and the negative pulse are wide, so the pulses are narrowest at 0.5 m and widest at 5 m.)
The theoretical low head (−673 m) is below absolute vacuum, so in reality the water column separates (cavitation) and the pressure is limited to the vapour pressure (about −10 m gauge).
Answer: wave speed 1335 m/s; pressure wave = ±678 m of water (±6.65 MPa), positive upstream and negative downstream of the valve; steady head 4.74 m at the points.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Water hammer in 1.2 m steel pipe, wall thickness · Hydraulics, chapter 4
- Water hammer pressure and stress, 2300 m pipeline · Hydraulics, chapter 4
- Water hammer sketch, 2300 m pipeline · Hydraulics, chapter 4
- Pipe wall stress for 3 s valve closure · Hydraulics, chapter 4
- Hammer pressure for 4 s and 60 s closure · Hydraulics, chapter 4
- Diameter to thickness ratio for stress limit · Hydraulics, chapter 4
- Surge and water hammer: 45 m³/s, 20 m surge tank · Hydropower Engineering, chapter 6 · asked 2×
- Settling tank 20 m long, 3.5 m deep; 0.02 and 0.01 mm · Water Supply Engineering, chapter 6 · asked 3×
- Surge and water hammer: 25 m³/s, 15 m surge tank · Hydropower Engineering, chapter 6 · asked 3×
- Surge and water hammer: 60 m³/s, 30 m surge tank · Hydropower Engineering, chapter 6 · asked 2×