- 2075 Bhadra · 8 marks
Hardy Cross with given constant factors
Short answer
After Hardy‑Cross iteration with resistance factors r (AB=1, BC=2, CD=1, DA=2, BD=3), the final discharges are: AB = 58.5 A→B, BC = 31.1 B→C, CD = 43.9 D→C, DA = 41.5 A→D, BD = 2.4 B→D, all in the same flow units.
Using Hardy-Cross method, find the rate of flow in every pipe lines as given below. The constant factor for AB, BC, CD, DA and BD are 1, 2, 1, 2 and 3 respectively. [Figure: network with nodes A, B, C, D and diagonal BD; 100 units enter at A; 25 units leave at B; 75 units leave at C]
Data. Constant factors ( in ): AB 1, BC 2, CD 1, DA 2, BD 3. 100 units enter at A; 25 leave at B and 75 at C.
Initial distribution (continuity): A to B 60, A to D 40; at B (out 25): B to C 20, B to D 15; at D: inflow all goes D to C; at C: .
Loop I = A-B-D-A (AB +, BD +, DA as AD). Loop II = B-C-D-B (BC +, CD as DC, DB as BD).
Hardy-Cross iterations
| Iter | (I) | (I) | | (II) | (II) | | |---|---|---|---|---|---|---| | 1 | 1075.00 | 370.00 | -2.905 | -2900.00 | 280.00 | 10.357 | | 2 | -412.90 | 296.24 | 1.394 | -158.93 | 221.14 | 0.719 | | 3 | -8.07 | 297.50 | 0.027 | -15.38 | 226.63 | 0.068 |
After 10 iterations the corrections are negligible.
Final discharges
| Pipe | AB | BC | CD (D to C) | DA (A to D) | BD (B to D) |
|---|---|---|---|---|---|
| Q | 58.52 | 31.15 | 43.85 | 41.48 | 2.37 |
Checks: A: ; B: ; C: ; D: .
Answer: AB = 58.5, BC = 31.1, CD = 43.9, DA = 41.5, and BD = 2.4 units (B to D).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Hardy Cross network with valve on diagonal · Hydraulics, chapter 3
- Hardy Cross correction derivation and network · Hydraulics, chapter 3
- Flow distribution in five-pipe network · Hydraulics, chapter 3
- Verify suggested discharge distribution (Hardy Cross) · Hydraulics, chapter 3
- Derive Hardy Cross correction factor · Hydraulics, chapter 3
- Network: unknown discharges and head losses · Hydraulics, chapter 3 · asked 2×
- Hardy-Cross network discharge AB, BC, AD, CD · Water Supply Engineering, chapter 7
- Head loss and velocity in loop pipes AB, BC, AC, CD · Water Supply Engineering, chapter 7
- Design pipelines AB, BC and CD, C = 120 · Water Supply Engineering, chapter 7
- Design pipes AB, BC; 160 lpcd, peak factor 3 · Water Supply Engineering, chapter 7