Skip to main content

Taylor tool life equation numerical

Short answer

Taylor's equation: V T^n = C. Constants n = ln(1.25)/ln(2.5) = 0.2435, C = 271 m/min. For T = 90 min, V = 90.6 m/min. At 120 m/min, T = 28.4 min. A 20% speed rise more than halves tool life; an economic cutting speed minimizes total cost per piece.

State Taylor's tool life equation. In a turning test with a HSS tool, a tool life of 60 minutes was obtained at a cutting speed of 100 m/min and 150 minutes at 80 m/min. Determine the constants n and C, the cutting speed for a tool life of 90 minutes, and the tool life if the speed is increased by 20 percent over 100 m/min. Comment on the economics.

Taylor's equation: the cutting speed VV and tool life TT (minutes to reach a given flank wear, usually 0.3 mm) are related by

V T n=CV\,T^{\,n} = C

n depends mainly on the tool material (about 0.1-0.15 for HSS, 0.2-0.4 for carbide, 0.5-0.7 for ceramics), and C is the speed for a tool life of 1 minute.

Constants

Two tests give V1T1n=V2T2nV_1T_1^n = V_2T_2^n:

V1V2=(T2T1)n  ⇒  10080=(15060)n\frac{V_1}{V_2} = \left(\frac{T_2}{T_1}\right)^{n}\;\Rightarrow\; \frac{100}{80} = \left(\frac{150}{60}\right)^{n} n=ln⁡1.25ln⁡2.5=0.22310.9163=0.2435n = \frac{\ln 1.25}{\ln 2.5} = \frac{0.2231}{0.9163} = 0.2435 C=V1T1n=100×(60)0.2435=100×2.710=271.0 m/minC = V_1T_1^{n} = 100\times(60)^{0.2435} = 100\times2.710 = 271.0\ \text{m/min}

(Check: 80×1500.2435=80×3.388=271.080\times150^{0.2435} = 80\times3.388 = 271.0.)

Speed for T=90T = 90 min

V=CTn=271.0(90)0.2435=271.02.992=90.6 m/minV = \frac{C}{T^{n}} = \frac{271.0}{(90)^{0.2435}} = \frac{271.0}{2.992} = 90.6\ \text{m/min}

Tool life at 120 m/min

T=(CV)1/n=(271.0120)4.107=(2.258)4.107=28.4 minT = \left(\frac{C}{V}\right)^{1/n} = \left(\frac{271.0}{120}\right)^{4.107} = (2.258)^{4.107} = 28.4\ \text{min}

Comment on economics

A 20 percent rise in speed cuts the tool life from 60 to 28.4 min, i.e. by more than half. Machining time per piece falls, but the tool-change time and tool cost per piece rise. There is an economic cutting speed (minimum cost per piece) which lies below the speed of maximum production rate, and a speed of maximum profit between them. It is found by differentiating total cost (machining + tool-change + tool cost) with respect to speed.

Answer: n=0.2435n = 0.2435, C=271C = 271 m/min, V=90.6V = 90.6 m/min for 90 min life, T=28.4T = 28.4 min at 120 m/min.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Manufacturing and Production Processes chapter 7 questions →