- Asked 7/31
- 2072 Chaitra · 8 marks
Cutting volume, 60 m, GL 540.70, formation 538.20
Short answer
Cutting depths from formation falling 1 in 40. Two-level cut areas with n=6, s=2, b=10. Trapezoidal volume 4412.58 m³, prismoidal 4338.84 m³, correction 73.74 m³.
Find the volume of cutting in a length of 60 m with the following data for a two level section using the prismoidal and trapezoidal formula (average end area). Also calculate the prismoidal correction. Formation width = 10 m, side slope = 2:1, transverse slope = 6:1. The ground levels at 30 m intervals are given below.
| Chainage (m) | 0 | 30 | 60 |
|---|---|---|---|
| GL (m) | 540.70 | 541.00 | 541.60 |
The formation has a downward slope of 1 in 40 with the formation level at 0 chainage being 538.20 m.
A two-level section (ground sloping across the road) is used at every chainage. Data: formation width m, side slope (horizontal : vertical), transverse ground slope , section spacing m.
Step 1: Formation levels and depths at the centre line
The formation falls at 1 in 40, so it loses m per 30 m: . The centre depth of cut is .
| Chainage (m) | GL (m) | FL (m) | Centre depth of cut h (m) |
|---|---|---|---|
| 0 | 540.70 | 538.20 | 2.50 |
| 30 | 541.00 | 537.45 | 3.55 |
| 60 | 541.60 | 536.70 | 4.90 |
Step 2: Cross-sectional areas
Along the cross-section the ground rises on one side and falls on the other. The depths of cut at the two side slope ends (where the side slope meets the ground) are
The horizontal distances from the centre line to these points are and , and the area of the section is
(the triangle between the two side slopes extended and the ground line, minus the triangle below the formation width).
Worked section at chainage 0, m:
| Chainage (m) | h (m) | h₁ (m) | h₂ (m) | d₁ (m) | d₂ (m) | Area A (m²) |
|---|---|---|---|---|---|---|
| 0 | 2.50 | 5.000 | 1.250 | 15.000 | 7.500 | 43.750 |
| 30 | 3.55 | 6.575 | 2.037 | 18.150 | 9.075 | 69.856 |
| 60 | 4.90 | 8.600 | 3.050 | 22.200 | 11.100 | 110.710 |
Step 3: Volume by the trapezoidal formula
Step 4: Volume by the prismoidal formula
Step 5: Prismoidal correction
The trapezoidal formula overestimates the volume by 73.74 m³, so the prismoidal volume is the more accurate one.
Answer: Volume of cutting by the trapezoidal formula = 4412.58 m³; by the prismoidal formula = 4338.84 m³; prismoidal correction = 73.74 m³.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cutting volume, 60 m, formation level 279.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×
- Cutting volume, 60 m, formation level 278.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 120 m, upward slope 1 in 40 · Surveying I, chapter 9 · asked 8×
- Cut and fill volume, 20 m formation width · Surveying I, chapter 9
- Filling volume, 60 m, formation 1281.49 · Surveying I, chapter 9
- Filling volume, 50 m, formation 1081.50 · Surveying I, chapter 9 · asked 4×
- Cutting volume, depths 2 m, 3 m, 4 m · Surveying I, chapter 9
- Earthwork volume, formation 1201.85, 1.65 m depth · Surveying I, chapter 9
- Prismoidal formula for volume · Surveying I, chapter 9
- Base width of 20 m high trapezoidal gravity dam · Hydropower Engineering, chapter 4