- Asked 7/31
- 2081 Bhadra · 6 marks
- 2073 Shrawan · 8 marks
Cutting volume, 60 m, formation level 279.00
Short answer
Compute two-level section areas at 0, 30, 60 m using formation width 9 m, side slope 2:1, cross slope 6:1. Trapezoidal (average end area) volume = 4150.1 m³, prismoidal volume = 4078.0 m³, prismoidal correction = 72.1 m³.
Find the volume of cutting in a length of 60 m with the following data for a two-level section using prismoidal and trapezoidal (average end area) formula. Also calculate the prismoidal correction. Formation width = 9 m, side slope = 2:1, transverse slope = 6:1. The ground levels at 30 m intervals are given below.
| Chainage (m) | 0 | 30 | 60 |
|---|---|---|---|
| GL (m) | 281.50 | 281.80 | 282.40 |
The formation has a downward slope of 1 in 40 with the formation level at 0 chainage being 279.00 m.
Given: formation width m, side slope (horizontal : vertical), transverse (cross) slope of ground , length 60 m with sections at 0, 30 and 60 m. The formation falls 1 in 40, so the fall in 30 m = 30/40 = 0.75 m.
Step 1: Depth of cutting at the centre line
Formation level at 30 m = 278.25 m, at 60 m = 277.50 m.
Step 2: Area of a two-level section
For ground rising at in on one side, the horizontal distances of the two cut edges from the centre line are
and the depths of the cut at these edges are and . The area is
Example for the section at chainage 0: , , , , , , m².
| Chainage (m) | GL (m) | Formation level (m) | Centre cut (m) | (m) | (m) | (m) | (m) | Area (m²) |
|---|---|---|---|---|---|---|---|---|
| 0 | 281.50 | 279.00 | 2.50 | 14.250 | 7.125 | 4.875 | 1.3125 | 40.641 |
| 30 | 281.80 | 278.25 | 3.55 | 17.400 | 8.700 | 6.450 | 2.1000 | 65.565 |
| 60 | 282.40 | 277.50 | 4.90 | 21.450 | 10.725 | 8.475 | 3.1125 | 104.901 |
Step 3: Volumes
(a) Trapezoidal (average end area) formula with 30 m between sections:
(b) Prismoidal formula (three sections, i.e. two equal intervals):
(c) Prismoidal correction
The trapezoidal formula overestimates the volume by this amount, so the prismoidal volume is the more accurate value.
Answer: volume of cutting by trapezoidal formula = 4150.1 m³; by prismoidal formula = 4078.0 m³; prismoidal correction = 72.1 m³ (to be subtracted from the trapezoidal volume).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cutting volume, 60 m, GL 540.70, formation 538.20 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×
- Cutting volume, 60 m, formation level 278.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 120 m, upward slope 1 in 40 · Surveying I, chapter 9 · asked 8×
- Filling volume, 60 m, formation 1281.49 · Surveying I, chapter 9
- Cut and fill volume, 20 m formation width · Surveying I, chapter 9
- Filling volume, 50 m, formation 1081.50 · Surveying I, chapter 9 · asked 4×
- Cutting volume, depths 2 m, 3 m, 4 m · Surveying I, chapter 9
- Earthwork volume, formation 1201.85, 1.65 m depth · Surveying I, chapter 9