Filling volume, 50 m, formation 1081.50
Short answer
Filling heights from formation falling at 1 in 50. Two-level embankment areas computed with n=8, s=2, b=10. Trapezoidal volume 996.05 m³, prismoidal 942.45 m³, correction 53.60 m³.
Find the volume of filling in a length of 50 m with the following data for a two level section, using the trapezoidal and prismoidal formula, where formation width = 10 m, side slope 2:1, transverse slope = 8:1. The ground levels at 25 m interval are given below.
| Chainage (m) | 0 | 25 | 50 |
|---|---|---|---|
| RL of GL (m) | 1080.50 | 1079.80 | 1078.40 |
The formation has a downward slope of 1 in 50 with the formation level at 0 chainage being 1081.50 m.
A two-level section (ground sloping across the road) is used at every chainage. Data: formation width m, side slope (horizontal : vertical), transverse ground slope , section spacing m.
Step 1: Formation levels and depths at the centre line
The formation falls at 1 in 50, so it loses m per 25 m: . The centre height of fill is .
| Chainage (m) | GL (m) | FL (m) | Centre height of fill h (m) |
|---|---|---|---|
| 0 | 1080.50 | 1081.50 | 1.00 |
| 25 | 1079.80 | 1081.00 | 1.20 |
| 50 | 1078.40 | 1080.50 | 2.10 |
Step 2: Cross-sectional areas
For an embankment on cross-sloping ground, the heights of fill at the two side slope ends are
The horizontal distances from the centre line to these points are and , and the area of the section is
(the triangle between the two side slopes extended and the ground line, minus the triangle above the formation width).
Worked section at chainage 0, m:
| Chainage (m) | h (m) | h₁ (m) | h₂ (m) | d₁ (m) | d₂ (m) | Area A (m²) |
|---|---|---|---|---|---|---|
| 0 | 1.00 | 0.300 | 2.167 | 5.600 | 9.333 | 13.633 |
| 25 | 1.20 | 0.460 | 2.433 | 5.920 | 9.867 | 16.705 |
| 50 | 2.10 | 1.180 | 3.633 | 7.360 | 12.267 | 32.641 |
Step 3: Volume by the trapezoidal formula
Step 4: Volume by the prismoidal formula
Step 5: Prismoidal correction
The trapezoidal formula overestimates the volume by 53.60 m³, so the prismoidal volume is the more accurate one.
Answer: Volume of filling by the trapezoidal formula = 996.05 m³; by the prismoidal formula = 942.45 m³; prismoidal correction = 53.60 m³.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×
- Cutting volume, 120 m, upward slope 1 in 40 · Surveying I, chapter 9 · asked 8×
- Cutting volume, 60 m, formation level 279.00 · Surveying I, chapter 9 · asked 7×
- Cutting volume, 60 m, formation level 278.00 · Surveying I, chapter 9 · asked 7×
- Filling volume, 60 m, formation 1281.49 · Surveying I, chapter 9
- Cutting volume, 60 m, GL 540.70, formation 538.20 · Surveying I, chapter 9 · asked 7×
- Cut and fill volume, 20 m formation width · Surveying I, chapter 9
- Earthwork volume, formation 1201.85, 1.65 m depth · Surveying I, chapter 9
- Side-long ground hill road, 0-400 m · Estimating and Costing, chapter 6
- Economical trapezoidal channel side length · Hydro Power, chapter 1
- Fault level: two 25 MVA generators, 50% reduction · Power Plant Equipment, chapter 4
- Hill road earthwork, chainage 0-150 (50 m) · Estimating and Costing, chapter 6