Skip to main content

3 m clay, cv 0.025 cm²/min, times

Short answer

For 80% consolidation, time factor 0.567 gives about 3.9 years. 2.5 cm settlement (31.25% U) requires about 192 days. In one year, settlement reaches about 3.45 cm.

A 3 m thick clay layer beneath a building is overlain by a permeable stratum and is underlain by an impervious rock. The coefficient of consolidation of the clay was found to be 0.025 cm²/min. The final expected settlement for the layer is 8 cm. Determine: (i) how much time will it take for 80% of the total settlement, (ii) the required time for a settlement of 2.5 cm to occur, (iii) the settlement that would occur in 1 year.

Given: clay is drained at the top only (permeable above, impervious rock below), so Hdr=3H_{dr} = 3 m =300= 300 cm. cv=0.025 cm2/minc_v = 0.025\ \text{cm}^2/\text{min}, Sfinal=8S_{final} = 8 cm.

(i) Time for 80% of settlement

For U=80%U = 80\%: Tv=1.781−0.933log⁡10(100−80)=0.567T_v = 1.781 - 0.933\log_{10}(100-80) = 0.567.

t80=TvHdr2cv=0.567×30020.025=2.04×106 mint_{80} = \frac{T_v H_{dr}^2}{c_v} = \frac{0.567 \times 300^2}{0.025} = 2.04\times10^6\ \text{min} =1418 days≈3.9 years= 1418\ \text{days} \approx 3.9\ \text{years}

(ii) Time for 2.5 cm settlement

U=2.58=31.25%  (<60%)  ⇒  Tv=π4(0.3125)2=0.0767U = \frac{2.5}{8} = 31.25\% \;(<60\%)\;\Rightarrow\; T_v = \frac{\pi}{4}(0.3125)^2 = 0.0767 t=0.0767×30020.025=2.76×105 min=192 days≈0.53 yeart = \frac{0.0767 \times 300^2}{0.025} = 2.76\times10^5\ \text{min} = 192\ \text{days} \approx 0.53\ \text{year}

(iii) Settlement in 1 year

t=365×1440=525,600t = 365 \times 1440 = 525{,}600 min.

Tv=0.025×5256003002=0.146  ⇒  U=4Tvπ=0.431T_v = \frac{0.025 \times 525600}{300^2} = 0.146 \;\Rightarrow\; U = \sqrt{\frac{4T_v}{\pi}} = 0.431 S=0.431×8=3.45 cmS = 0.431 \times 8 = 3.45\ \text{cm}

Answer: (i) about 3.9 years; (ii) about 192 days; (iii) about 3.45 cm.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Soil Mechanics chapter 9 questions →