Final settlement and settlement at 0.5 year

Short answer

Final primary settlement is 111 mm. After 0.5 year, time factor 0.569 corresponds to 80% consolidation, giving settlement of about 89 mm.

(Using the soil profile and data of the previous question.) What will be the final settlement of the clay layer after the primary consolidation? Also, determine the settlement of the clay layer after 0.5 year. [For U = 70%, TvT_v = 0.403; for U = 80%, TvT_v = 0.569; for U = 90%, TvT_v = 0.848]

Data from the previous profile: clay thickness H=6H = 6 m (8 m to 14 m), e0=2.4e_0 = 2.4, Cc=1.2C_c = 1.2, cv=3.25×10−7c_v = 3.25\times10^{-7} m²/s. At the clay centre: σ0′=117\sigma_0' = 117 kPa; final σ′=117+15=132\sigma' = 117 + 15 = 132 kPa. The clay is assumed normally consolidated.

Final primary settlement

Sc=CcH1+e0log⁡10σ0′+Δσσ0′=1.2×63.4log⁡10132117=2.1176×0.05238=0.111 m\begin{aligned} S_c &= \frac{C_c H}{1+e_0}\log_{10}\frac{\sigma_0'+\Delta\sigma}{\sigma_0'} \\ &= \frac{1.2 \times 6}{3.4}\log_{10}\frac{132}{117} = 2.1176 \times 0.05238 = 0.111\ \text{m} \end{aligned}

Sc≈111S_c \approx 111 mm.

Settlement after 0.5 year

Sand lies above and below the clay, so drainage is two-way: Hdr=6/2=3H_{dr} = 6/2 = 3 m.

t=0.5×365×86400=1.577×107 st = 0.5 \times 365 \times 86400 = 1.577\times10^{7}\ \text{s} Tv=cvtHdr2=3.25×10−7×1.577×10732=0.569T_v = \frac{c_v t}{H_{dr}^2} = \frac{3.25\times10^{-7}\times1.577\times10^{7}}{3^2} = 0.569

From the given table, Tv=0.569T_v = 0.569 corresponds to U=80%U = 80\%.

St=U×Sc=0.80×111=88.8 mmS_t = U \times S_c = 0.80 \times 111 = 88.8\ \text{mm}

Answer: final settlement ≈111\approx 111 mm; settlement after 0.5 year ≈89\approx 89 mm (U = 80%).

✓ Answer checked by Claude Opus 5.5 (high effort)