Embankment excavation quantity (18 kN/m³)
Short answer
In-situ dry unit weight is 18/1.10 equals 16.36 kN/m3. Solids needed for 1 m3 of fill are 19 kN. Excavated volume is 19 divided by 16.36, about 1.16 m3, assuming no soil loss.
The in-situ field unit weight and water content of soil are 18 kN/m³ and 10% respectively. Soil excavated from this in-situ site is used for embankment construction. The dry unit weight and water content of the soil at the compaction site are 19 kN/m³ and 18% respectively. Determine the amount of soil to be excavated for 1 m³ of compaction. Assume necessary conditions.
Given
In-situ: kN/m³, . Compacted fill: kN/m³, , volume = 1 m³.
Solution
Dry unit weight at the excavation site:
Weight of dry soil (solids) needed in 1 m³ of embankment:
The weight of solids is the same at the borrow site and in the fill, so the volume to excavate is:
Answer: about 1.16 m³ of soil must be excavated for each 1 m³ of compacted fill.
Assumption: no soil is lost during hauling and spreading.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Embankment 1,00,000 m³ excavation · Soil Mechanics, chapter 2
- Borrow pit to embankment, water added · Soil Mechanics, chapter 2
- Compacted soil 18 kN/m³, porosity and ZAV · Soil Mechanics, chapter 5 · asked 2×
- Field methods for in-situ density · Soil Mechanics, chapter 2 · asked 2×
- Compacted soil 18 kN/m³, saturation · Soil Mechanics, chapter 5
- Embankment 95% compaction, 950 cc mould · Soil Mechanics, chapter 5
- Mat 18 m × 22 m, safe building weight · Foundation Engineering, chapter 7 · asked 2×
- Field capacity from applied water data · Irrigation and Drainage Engineering, chapter 2
- Interval and amount with 40% moisture limit · Irrigation and Drainage Engineering, chapter 2
- Building: excavation, brick, plaster (18 marks) · Estimating and Costing, chapter 6