Double mass curve, station X and 15 stations, 2013-2022

Short answer

The record is inconsistent with a break after 2017. Earlier data (2013–2017) are multiplied by 0.683 to adjust to the present regime: 298.4, 232.2, 208.3, 218.5 and 336.6 mm.

Annual Precipitation of station X and average of the 15 surrounding stations are listed below. Examine the consistency of the station X. In which year, the change in regime observed? Make adjustments in the rainfall data wherever applicable.

Year2022202120202019201820172016201520142013
Rainfall at station X (mm)173290225246260493320305340437
Average rainfall at surrounding stations (mm)234333236251284361282240265302

The data are first arranged in chronological order (2013 to 2022) and the cumulative values are found.

YearX (mm)15-stn avg (mm)Cum. avgCum. XX / avg
20134373023024371.45
20143402655677771.28
201530524080710821.27
2016320282108914021.13
2017493361145018951.37
2018260284173421550.92
2019246251198524010.98
2020225236222126260.95
2021290333255429160.87
2022173234278830890.74

Consistency check

Plot cumulative X (y) against cumulative average of the 15 stations (x). The ratio X/avg is about 1.1 to 1.45 up to 2017, and below 1 from 2018. So the points follow one straight line up to the 2017 point and a flatter line after it.

  • Slope up to 2017: Ma=18951450=1.307M_a = \dfrac{1895}{1450} = 1.307
  • Slope after 2017: Mc=3089−18952788−1450=11941338=0.892M_c = \dfrac{3089 - 1895}{2788 - 1450} = \dfrac{1194}{1338} = 0.892

The slopes differ, so the record of station X is not consistent. The change in regime occurred after 2017 (from 2018).

Adjustment

The earlier data (2013-2017) are adjusted to the present regime (slope McM_c):

Pcx=Px×McMa=Px×0.8921.307=0.683 PxP_{cx} = P_x\times\frac{M_c}{M_a} = P_x\times\frac{0.892}{1.307} = 0.683\,P_x
YearObserved (mm)Adjusted (mm)
2013437298.4
2014340232.2
2015305208.3
2016320218.5
2017493336.6

Data for 2018-2022 are unchanged.

Answer: Station X is inconsistent; change in regime from 2018 (break after 2017); the 2013-2017 values are multiplied by 0.683 to give 298.4, 232.2, 208.3, 218.5 and 336.6 mm.