Skip to main content

Double mass curve method for consistency

Short answer

The double mass curve plots cumulative rainfall of a test station against the cumulative mean of base stations. A straight line indicates consistency; a break in slope reveals a change in gauge conditions. Data before the break are corrected by multiplying by the ratio of recent to earlier slope.

Explain double mass curve method for checking a rainfall data for consistency.

A double mass curve (DMC) checks the consistency of rainfall records of a station by comparing it with the average of a group of nearby, reliable stations. It detects changes caused by shifting of the gauge, change in exposure, observer or instrument.

Principle

For a consistent record, the cumulative rainfall at the test station is proportional to the cumulative average rainfall of the base stations, so the plot is a straight line. A break in slope shows that the regime of the test station has changed.

Procedure

  1. Select 10 to 25 base stations of the same climate, with long, consistent records.
  2. For each year, find the average annual rainfall of the base stations.
  3. Compute the cumulative values of the test station (ΣPx\Sigma P_x) and the base average (ΣPav\Sigma P_{av}).
  4. Plot ΣPx\Sigma P_x (ordinate) against ΣPav\Sigma P_{av} (abscissa).
  5. If the points lie on one straight line, the record is consistent. If there is a break in slope, note the year of the break.
 SumPx
   |                . .
   |            .         <- later (recent) slope Mc
   |         .  <- break (change of regime)
   |      .
   |    .      <- earlier slope Ma
   |  .
   | .
   +------------------ Sum Pav

Correction

Records of the earlier (or doubtful) period are adjusted to the conditions of the recent period:

Pcx=Px×McMaP_{cx} = P_x \times \frac{M_c}{M_a}

where PcxP_{cx} is the corrected rainfall, PxP_x the original rainfall, McM_c the slope of the line to which the data is to be corrected (usually the recent period) and MaM_a the slope of the line of the period being corrected.

The same technique is also used for checking consistency of runoff or other hydrologic records.

✓ Answer checked by Claude Sonnet 5.5

All Engineering Hydrology chapter 2 questions →