- 2081 Baishakh · 12 marks
Mass curve and critical period storage
Short answer
With mean inflow as uniform draft (14.92 m³/s), storage capacity is 63.42 m³/s-months (166.7×10⁶ m³) and the critical period is 7 months (March to September). Reducing draft to 80% of the mean (11.93 m³/s) lowers storage to 42.53 m³/s-months (111.8×10⁶ m³).
The table below shows the inflow for one reservoir.
| Month | Oct | Nov | Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Inflow (m³/s) | 38 | 32 | 27 | 26 | 15 | 10 | 8 | 7 | 6 | 4 | 3 | 3 |
i) By assuming the mean inflow as the draft, develop the mass curve of the reservoir. ii) Determine the storage capacity and length of the critical period. iii) Determine the storage capacity if the draft is only 80% of the mean inflow and compare it with the storage capacity of (ii).
Units are m³/s-months; one m³/s-month m³.
i) Mass curve
Mean inflow m³/s, taken as the uniform draft.
| Month | Inflow | Cum. inflow | Cum. draft (mean) | Cum. inflow − draft |
|---|---|---|---|---|
| Oct | 38 | 38 | 14.92 | +23.08 |
| Nov | 32 | 70 | 29.83 | +40.17 |
| Dec | 27 | 97 | 44.75 | +52.25 |
| Jan | 26 | 123 | 59.67 | +63.33 |
| Feb | 15 | 138 | 74.58 | +63.42 |
| Mar | 10 | 148 | 89.50 | +58.50 |
| Apr | 8 | 156 | 104.42 | +51.58 |
| May | 7 | 163 | 119.33 | +43.67 |
| Jun | 6 | 169 | 134.25 | +34.75 |
| Jul | 4 | 173 | 149.17 | +23.83 |
| Aug | 3 | 176 | 164.08 | +11.92 |
| Sep | 3 | 179 | 179.00 | +0.00 |
Cum.
volume
179 | ____* inflow mass curve
| ___---
| _--* draft line (slope = mean)
| __.-* .-'
| _.-* _.--'
| * _.--'
+---------------------------
Oct Sep
The mass curve of inflow lies above the draft line from October to February (surplus) and below it from March to September (deficit, the reservoir is drawn down).
ii) Storage capacity and critical period
The largest vertical gap between the draft line (tangent to the mass curve at the end of February) and the mass curve is at the end of September. This is the sum of the deficits from March to September:
Critical period months (March to September), when the reservoir goes from full to empty. It refills by about February of the next year.
iii) Draft = 80% of mean inflow
m³/s. Deficit months are those with inflow below this value (Mar to Sep: 10, 8, 7, 6, 4, 3, 3):
The critical period is still March to September (7 months). The storage required is reduced from 166.7 Mm³ to 111.8 Mm³, a saving of 33%, but the water supplied also falls by 20%.
Answer: storage for the mean-flow draft = 166.7 Mm³ (63.42 m³/s-months), critical period = 7 months; storage for 80% draft = 111.8 Mm³ (42.53 m³/s-months).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Minimum reservoir capacity and wasted water · Hydropower Engineering, chapter 3
- Full regulation: reservoir, capacity, annual energy · Hydropower Engineering, chapter 3
- RoR at 40% exceedence; storage regulation · Hydropower Engineering, chapter 3
- Installed capacity, energy and daily peaking reservoir (2079) · Hydropower Engineering, chapter 3 · asked 2×
- Installed capacity, energy and daily peaking reservoir (2072) · Hydropower Engineering, chapter 3 · asked 2×
- Flow duration curve; firm and secondary energy · Hydropower Engineering, chapter 3
- Impounded reservoir, 4.4 million m3 draft · Water Supply Engineering, chapter 2 · asked 2×
- Impounded reservoir, 4.78 million m3 draft · Water Supply Engineering, chapter 2 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 650) · Hydro Power, chapter 3 · asked 2×
- Annual firm and secondary energy (900 m³/s, Nov 100) · Hydro Power, chapter 3 · asked 2×