- 2080 Bhadra · 8 marks
Flood hydrograph from 6-hr hydrograph, 3.3 and 5.5 cm
Short answer
Separate constant base flow of40 m³/s and derive the6-h UH by dividing DRH by the effective depth 5.021 cm. Convolve the UH with3.3 cm and5.5 cm lagged by6 h, then add base flow. The peak flood is 638 m³/s at 30 h.
Following are the ordinates of hydrograph from a catchment area of 770 km due to 6-hr rainfall. Derive the ordinates of flood hydrograph due to 3.3 cm and 5.5 cm effective rainfall of duration 6-hr. Make suitable assumptions regarding the base flow.
| Time (hr) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 | 66 | 72 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Discharge (m/s) | 40 | 65 | 215 | 360 | 400 | 350 | 270 | 205 | 145 | 100 | 70 | 50 | 40 |
Assumption for base flow: the discharge at the start and end of the storm hydrograph is 40 m³/s, so a constant base flow of 40 m³/s is assumed.
Step 1: 6-h UH
Direct runoff ordinates = observed − 40. Volume = (sum of ordinates) × 6 × 3600.
UH ordinate = DRH / 5.021:
| t (h) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 | 66 | 72 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Observed Q | 40 | 65 | 215 | 360 | 400 | 350 | 270 | 205 | 145 | 100 | 70 | 50 | 40 |
| DRH | 0 | 25 | 175 | 320 | 360 | 310 | 230 | 165 | 105 | 60 | 30 | 10 | 0 |
| UH (m³/s per cm) | 0.0 | 5.0 | 34.9 | 63.7 | 71.7 | 61.7 | 45.8 | 32.9 | 20.9 | 11.9 | 6.0 | 2.0 | 0.0 |
Step 2: Flood hydrograph
Two successive 6-h effective rains of 3.3 cm and 5.5 cm:
| t (h) | UH (m³/s) | 3.3 cm × UH | 5.5 cm × UH | Base | Q (m³/s) |
|---|---|---|---|---|---|
| 0 | 0.00 | 0.0 | 0.0 | 40.0 | 40.0 |
| 6 | 4.98 | 16.4 | 0.0 | 40.0 | 56.4 |
| 12 | 34.85 | 115.0 | 27.4 | 40.0 | 182.4 |
| 18 | 63.73 | 210.3 | 191.7 | 40.0 | 442.0 |
| 24 | 71.69 | 236.6 | 350.5 | 40.0 | 627.1 |
| 30 | 61.74 | 203.7 | 394.3 | 40.0 | 638.1 |
| 36 | 45.80 | 151.2 | 339.6 | 40.0 | 530.7 |
| 42 | 32.86 | 108.4 | 251.9 | 40.0 | 400.4 |
| 48 | 20.91 | 69.0 | 180.7 | 40.0 | 289.7 |
| 54 | 11.95 | 39.4 | 115.0 | 40.0 | 194.4 |
| 60 | 5.97 | 19.7 | 65.7 | 40.0 | 125.4 |
| 66 | 1.99 | 6.6 | 32.9 | 40.0 | 79.4 |
| 72 | 0.00 | 0.0 | 11.0 | 40.0 | 51.0 |
| 78 | 0.00 | 0.0 | 0.0 | 40.0 | 40.0 |
Answer: peak flood ≈ 638 m³/s at t = 30 h.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Flood hydrograph from 6-hr UH, two storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 2-h UH, 5.2 cm rainfall · Engineering Hydrology, chapter 5
- Flood hydrograph from 4-h UH, three 2-hr rainfalls · Engineering Hydrology, chapter 5 · asked 2×
- 2-hr UH from figure: area, flood, Tc, two storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 4-h UH, 50 m3/s base · Engineering Hydrology, chapter 5 · asked 2×
- 2-hr UH and flood hydrograph from storm · Engineering Hydrology, chapter 5
- Sewer diameter for a 12 sq km area · Sanitary Engineering, chapter 3
- Hydrograph and flow duration curve · Power Plant Design, chapter 3 · asked 3×