Muskingum routing at Chovar, Bagmati River
Short answer
Using Muskingum routing with K=10 h, x=0.2, Δt=6 h yields coefficients C0=0.0909, C1=C2=0.4545. The outflow peak is 494.70 m³/s at 24 h, an attenuation of 165.30 m³/s and a 6-h lag from the inflow peak of 660 m³/s at 18 h.
Route the following flood hydrograph at Chovar of Bagmati River using Muskingum method having coefficient k = 10 hr and x = 0.2. Following is the inflow hydrograph with outflow of Chovar at the start is 60 m/s.
| t (hr) | 0 | 6 | 12 | 18 | 24 | 30 | 36 | 42 | 48 | 54 | 60 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Inflow (m/s) | 60 | 120 | 480 | 660 | 460 | 260 | 160 | 100 | 90 | 60 | 40 |
Method
Muskingum routing: , where
Here h, , h, so h.
Check: .
Routing table
| t (h) | I | C0·I2 | C1·I1 | C2·O1 | O (m³/s) |
|---|---|---|---|---|---|
| 0 | 60.00 | - | - | - | 60.00 |
| 6 | 120.00 | 10.91 | 27.27 | 27.27 | 65.45 |
| 12 | 480.00 | 43.64 | 54.55 | 29.75 | 127.93 |
| 18 | 660.00 | 60.00 | 218.18 | 58.15 | 336.33 |
| 24 | 460.00 | 41.82 | 300.00 | 152.88 | 494.70 |
| 30 | 260.00 | 23.64 | 209.09 | 224.86 | 457.59 |
| 36 | 160.00 | 14.55 | 118.18 | 208.00 | 340.72 |
| 42 | 100.00 | 9.09 | 72.73 | 154.87 | 236.69 |
| 48 | 90.00 | 8.18 | 45.45 | 107.59 | 161.22 |
| 54 | 60.00 | 5.45 | 40.91 | 73.28 | 119.65 |
| 60 | 40.00 | 3.64 | 27.27 | 54.39 | 85.29 |
Peak attenuation and lag
- Peak inflow = 660 m³/s at t = 18 h
- Peak outflow = 494.70 m³/s at t = 24 h
- Attenuation of peak = 660 − 494.70 = 165.30 m³/s (25.0 % of the inflow peak)
- Lag of peak = 24 − 18 = 6 h (to the nearest time step)
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Muskingum routing, K=36 hr, x=0.15 · Engineering Hydrology, chapter 7
- Muskingum routing, K=12 h, X=0.20 · Engineering Hydrology, chapter 7 · asked 2×
- Reservoir routing through spillway, 6-hr inflow · Engineering Hydrology, chapter 7
- Muskingum routing, K=10, x=0.20 · Engineering Hydrology, chapter 7 · asked 2×
- Muskingum routing, K=8 h, X=0.25 · Engineering Hydrology, chapter 7
- Muskingum routing, k=10 h, x=0.2 (table missing) · Engineering Hydrology, chapter 7
- ERR from separate inflow and outflow rows · Engineering Economics, chapter 3
- Storage for uniform inflow over 24 hours · Water Supply Engineering, chapter 7